Draft
|
Tue Jun 16 11:34:11 2026 |
IC, VM | | Shift summary | |
|
Restart of the accelerator | | 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers
Problem, with all magnets control |
| |
Draft
|
Wed Jun 17 08:36:20 2026 |
IC, VM | Under Process | Problem | Vide |
|
Restart of the accelerator | | 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.
As yesterday there is a problem |
 | |
Draft
|
Thu Jun 18 07:37:17 2026 |
IC, VM | | Shift summary | |
|
Ring working point studies | | 07h35 Start-up modulator (does not go to
standby), laser, magnets, cycling.
9h50 HT ON |
| |
1250
|
Fri Jun 19 09:51:28 2026 |
IC, VM | Not Fixed | Urgent | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Restart of the accelerator | | 09h35 Start-up modulator
09h52 Start the fridge
09h55 Start chillers |
| |
Draft
|
Fri Jun 26 08:27:22 2026 |
IC, VM | Under Process | Problem | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
Restart of the accelerator | | 08h26 Start-up modulator, laser, fridge,
chillers, cycling
09h31 Low SF6 pressure => JN |
   | |
Draft
|
Fri Nov 15 07:56:03 2024 |
IC, VK, VM, ND | | Shift summary | |
|
Ring studies, MRSV | | 07h50 Start ThomX
09h20 HV is 'ON'
09h25 HV 1215 V |
36x | |
990
|
Thu Jan 9 08:35:10 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring |
|
| | 08h35 Start ThomX: Modulator, Frigo, All
magnets.
08h40 Cicling all magnets, Start |
15x | |
993
|
Fri Jan 10 08:24:25 2025 |
IC, VK, VM, ND | Under Process | Shift summary | Ring Commissioning |
|
| | 08h25 Start ThomX: Modulator, Frigo, cycling
all magnets
08h30 Start chillers |
10x | |
955
|
Thu Nov 7 08:53:22 2024 |
IC, VK, VM, JN | Under Process | Shift summary | Ring |
|
| | 8h50 Start of the modumator and all subsystems
PC client 1 was frozen => we
restarted |
6x | |
Draft
|
Thu Dec 19 11:10:03 2024 |
IC, VK, VM | Under Process | Shift summary | Ring Commissioning |
|
| | 11h05 Start ThomX
11h50 BPM02-Libera04 wiring has
been checked: 'OK' |
| |
956
|
Fri Nov 8 09:35:41 2024 |
IC, VK, JN | Under Process | Shift summary | Ring |
|
ring studies | | 8h50 Start of the modumator and all subsystems
Beam studies.
Orbit Correction. |
13x | |
1177
|
Thu Jan 8 09:07:08 2026 |
IC, HG, RC, DN, JM | Under Process | Shift summary | LI | TL | LE | Ring | Linac Commissionning | Ring Commissioning |
|
Test of the new receipt from BMAD Isol = 242 A | | 8h55: mise en chauffe (modulateur, frigo/chillers,
laser, cyclage)
10h20 HV ON |
13x | |
Draft
|
Wed Jun 3 08:41:41 2026 |
IC, HG, JNC | | Shift summary | |
|
Restart of the accelerator | | 02/06/2026
~15h30 Starting all system
16h Start up of the modulator, |
| |
1094
|
Thu Jun 26 08:55:15 2025 |
IC, DN, RC, HG, ME | Under Process | Shift summary | Ring Commissioning |
|
Improve ring for X-rays | | Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals
8h55 Switch ON the modulator and |
7x | |
669
|
Wed Jan 18 14:02:39 2023 |
IC | Under Process | Anneau | Aimants |
|
RE: Test cyclage aimants | | I have decresed the Imax to 8 A and loaded
the new cycling curves
RI-C1/PS/QP.06 and RI-C2/PS/QP.02: |
| |
Draft
|
Thu Jan 15 09:09:37 2026 |
IC | Under Process | Shift summary | |
|
Ring studies | | 08h56 Warm-up ThomX: Modulator, Laser,
Fridge
Chillers were started, cycling all |
    | |
Draft
|
Mon Feb 23 09:43:36 2026 |
IC | | | |
|
Ring studies | | 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)
HV ON |
| |
Draft
|
Mon Apr 20 10:37:11 2026 |
IC | | Shift summary | |
|
| | 10h30 : mise en chauffe (frigo/chillers,
modulateur, laser, cyclage)
All rondes are broken, THOMX key |
| |
35
|
Fri Jun 11 18:47:23 2021 |
Hayg | Reference Solution | Linac | RF D1 |
|
DS pour les températures des chillers |
| Listes des Ds pour les températures
des chillers
GUN : ER/HF/RAC.17-API.AI1/ |
| |
70
|
Fri Sep 17 12:02:40 2021 |
Hayg | Not Fixed | Problem | Linac Commissionning |
|
Conditionnement Canon | | Conditionnement du canon
Niveaux de vide pendant le conditionnement
: |
 |
|