  Draft   Tue Jun 16 11:34:11 2026 IC, VM Shift summary  Restart of the accelerator 11h20 Try to restart the accelerator. Start-up
modulator, laser, fridge, chillers

Problem, with all magnets control
  
  Draft   Wed Jun 17 08:36:20 2026 IC, VMUnder ProcessProblemVide Restart of the accelerator 08h35 Start-up modulator (it was already
on standby), laser, magnets, cycling.

As yesterday there is a problem
 Screenshot_from_2026-06-17_15-54-18.pngScreenshot_from_2026-06-17_15-50-21.png 
  Draft   Thu Jun 18 07:37:17 2026 IC, VM Shift summary  Ring working point studies 07h35 Start-up modulator (does not go to
standby), laser, magnets, cycling.

9h50 HT ON
  
  1250   Fri Jun 19 09:51:28 2026 IC, VMNot FixedUrgentLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Restart of the accelerator 09h35 Start-up modulator

09h52 Start the fridge

09h55 Start chillers
  
  Draft   Fri Jun 26 08:27:22 2026 IC, VMUnder ProcessProblemLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Restart of the accelerator 08h26 Start-up modulator, laser, fridge,
chillers, cycling

09h31 Low SF6 pressure => JN
 Screenshot_from_2026-06-26_15-41-00.pngIMG-20260626-WA0001.jpgScreenshot_from_2026-06-26_16-07-50.pngScreenshot_from_2026-06-26_17-17-00.png 
  Draft   Fri Nov 15 07:56:03 2024 IC, VK, VM, ND Shift summary  Ring studies, MRSV 07h50 Start ThomX

09h20 HV is 'ON'

09h25 HV  1215 V
 36x 
  990   Thu Jan 9 08:35:10 2025 IC, VK, VM, NDUnder ProcessShift summaryRing   08h35 Start ThomX: Modulator, Frigo, All
magnets.

08h40 Cicling all magnets, Start
 15x 
  993   Fri Jan 10 08:24:25 2025 IC, VK, VM, NDUnder ProcessShift summaryRing Commissioning   08h25 Start ThomX: Modulator, Frigo, cycling
all magnets

08h30 Start chillers
 10x 
  955   Thu Nov 7 08:53:22 2024 IC, VK, VM, JNUnder ProcessShift summaryRing   8h50 Start of the modumator and all subsystems

PC client 1 was frozen => we
restarted
 6x 
  Draft   Thu Dec 19 11:10:03 2024 IC, VK, VMUnder ProcessShift summaryRing Commissioning   11h05 Start ThomX

11h50 BPM02-Libera04 wiring has
been checked: 'OK' 
  
  956   Fri Nov 8 09:35:41 2024 IC, VK, JNUnder ProcessShift summaryRing ring studies 8h50 Start of the modumator and all subsystems

Beam studies.

Orbit Correction.
 13x 
  1177   Thu Jan 8 09:07:08 2026 IC, HG, RC, DN, JMUnder ProcessShift summaryLI | TL | LE | Ring | Linac Commissionning | Ring Commissioning Test of the new receipt from BMAD Isol = 242 A 8h55: mise en chauffe (modulateur, frigo/chillers,
laser, cyclage)

10h20 HV ON
 13x 
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  1094   Thu Jun 26 08:55:15 2025 IC, DN, RC, HG, MEUnder ProcessShift summaryRing Commissioning Improve ring for X-rays  Goal: Vertical orbit and angle
at the IP with I3 and I4 X-ray signals

8h55 Switch ON the modulator and
 7x 
  669   Wed Jan 18 14:02:39 2023 ICUnder ProcessAnneauAimants RE: Test cyclage aimants I have decresed the Imax to 8 A and loaded
the new cycling curves

RI-C1/PS/QP.06 and RI-C2/PS/QP.02:
 cylage_quad8A.png 
  Draft   Thu Jan 15 09:09:37 2026 ICUnder ProcessShift summary  Ring studies 08h56 Warm-up ThomX: Modulator, Laser,
Fridge
Chillers were started, cycling all
 Screenshot_from_2026-01-15_11-04-16.pngScreenshot_from_2026-01-15_11-33-33.pngRi_C1_Quads_is_off_Screenshot_from_2026-01-15_18-19-14.pngScreenshot_from_2026-01-15_16-42-27.pngScreenshot_from_2026-01-15_17-36-28after1LOCO.png 
  Draft   Mon Feb 23 09:43:36 2026 IC    Ring studies 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)

HV ON
  
  Draft   Mon Apr 20 10:37:11 2026 IC Shift summary    10h30 : mise en chauffe  (frigo/chillers,
modulateur, laser, cyclage)

All rondes are broken, THOMX key
  
  35   Fri Jun 11 18:47:23 2021 HaygReference SolutionLinacRF D1 DS pour les températures des chillers icon1.gif Listes des Ds pour les températures
des chillers


GUN : ER/HF/RAC.17-API.AI1/
  
  70   Fri Sep 17 12:02:40 2021 HaygNot FixedProblemLinac Commissionning Conditionnement Canon  Conditionnement du canon 

 

Niveaux de vide pendant le conditionnement