Entered by Super Team from 134.158.195.141 on Wed Mar 23 12:52:44 2022; Test des redpitaya baie 17 6x
|
Point de départ :
- Signal d'entrée : Générateur AFG Techtro, Sortie sur 50 Ohm
--> Sin(f=10kHz) Amplitude : 200 mV CC |
ND, VC, HG, MJ; Test demarrage 10/02 7x
|
9:37 Mise en chauffe
Maher signal que des tests ont ete fait sur le canon, leger risque de claquage.
Pression SF6: 2938mbar |
ND; Test cycling QP anneau
|
Test de l'IHM de cyclage des aimants de l'anneau
- l'IHM fonctionne (teste uniquement pour QP)
Defaut (internal interlock hard) sur RI-C1/PS/QP.05,RI-C1/PS/QP.06,RI-C2/PS/QP.02 |
ND; Test cyclage aimants
|
17h25: Test de cyclage de
RI-C1/PS/QP.05
RI-C1/PS/QP.06 |
Entered by Super Team from 134.158.195.142 on Thu Nov 25 15:54:59 2021; Test arret urgence faisceau
|
| |
VM, RC, MJ, IC; Test Soleno=245, optic issue de la simu Julien Matching
|
08h36 Warm-up ThomX: Modulator, Laser, Fridge
8h41 Chillers were started, cycling all magnets.
09h40 HV is ON |
Entered by Hayg Guler from 134.158.195.141 on Mon Jun 14 15:23:29 2021; Températures Chiller
|
Etiquettes des températures :
nous avons corrigé les étiquettes affectées aux températures, cf image.
Nous voyons bien que la régulation de la températures se fait sur la température de la sortie du Chiller.
Par contre nous observons une différence de température entre la clarinette |
VC, Carlos Buitrago, Sudhanshu Thakur, ND; TP 29-11--2024
|
demarrage chauffage 8H20
test nouveau code synchro 50Hz => ne fonctionne pas
Le nouveau code 25Hz ne fonctionne pas => code installé 25Hz (juin 2024) |
MJ KD HG; Synchro HS 
|
10h20 HV on
Erreur sstLI
Qqun peut debloquer ca ? nicolas ? |
Entered by Vincent Chaumat from 134.158.76.115 on Fri Aug 30 15:15:02 2024; Synchro
|
La synchro est opérationnelle.
pB de redemarrage des hardwares avant les serveurs du coup pas de connexion réseau
|
Entered by Vincent Chaumat from 134.158.76.115 on Fri Jul 19 11:11:33 2024; Syncho pB
|
La synchro a été testée ce matin:
Il y avait effectuvement un pB de faux contact qui empechait la synchro de fonctionner.
|
Entered by Super Team from 134.158.195.142 on Fri Feb 11 15:52:28 2022; Suite redemarrage
|
Les valeurs des seuils des deux première pompes vide ont été modifiées de 5e-7 à 5e-5mbar
Le modulateur trigge, le PA est allumé mais nous n'avons pas de RF.
Cela semble venir du timing. Vincent regarde. |
M ELK; Suite conditionnement section 13/08 pour validation 
|
Vérification Pression SF6 =2.45 bar
Vérification Températeure chiller Clarinette =30 +/_ 0.1 °C (consigne 29.20°C)
Vide section sans HF @ 30 °C: In section 5.3 10-10 mbar & Out section 6.6 10-10 mbar |
Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024; Suite conditionnement section
|
10h50 Mise en route à 10dB, HT = 1000V
11h04 HT = 1215V, Att sec 3 dB vide in section = 9.3e-9 vide out section = 1e-9
11h05 HT = 1215V, Att sec 2 dB vide in section = 9.4e-9 vide out section = 1e-9 |
VK, IC. VM, LS; Studies on the beam revolution frequency 12x
|
The main task for today is to measure the revolution frequency without RF cavity with the spectrum analyzer.
Start-up of the machine.
After setting the previous setting, the orbit was very different. We checked the injector, the beam also was different (based on the beam images) |
ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
|
Goal: understanding of teh beam natural revolution frequency. Study the effect of the dipoles.
We have started from the previous setting of the machine. Then we loaded the settings from last december and received better storage. RF cavity
is OFF. |
VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025; Streak camera measurements    
|
08h28 Start Thomx: Modulator, Laser, Frig
08h33 Chillers were started, cycling al magnets
9h00 MPS affichage: Arret d'urgence... Appel Nourredine, probleme resolu. |
ND, Marie Labat; Streak camera 
|
9:20 Start aligning
12:40 Alignement done for both linac and ring.
Health check: Archiving not working |
Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023; Stabilite LINAC
|
Pour illustrer la fin de l'entree elog 745 d'aujourd'hui :
(==> Saute de position du faisceau,
cela n'est pas corrélé à une perte de puissance ou de changement de phase (phénomène impossible à reproduire |
VK, IC. VM; Srart of the beam physics measurements 14x
|
The main idea fo this week is to prepare the beam for the search of the first X-rays.
Start machine without RF cavity. During the day several reboot of the libera.02 (TL).
Study of the dispersion. Measurements of the horizontal dispersion by changing the injector energy (RF section attenuator). |