Entry   IC,VM, ND; , entered from 127.0.0.1 
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

9h30 HV is ON

recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded
Entry   IC,VM;  
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

08h58 HV is ON

recipe_recipe_LI_TL_RI_all_20260326_09_09_20.txt loaded
Entry   KD MJ RC DN VK; 1e avril 2026 - Scan Energy-Angle 61.5 MeV orbite_61p5_MeV_2026-04-01_19-24-56.png
7h40 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

==> SF6 à remplir avant démarrage. 2.805 bar

09h04 HV is ON
Entry   KD MJ; shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV Droma_61p5_MeV_2026-03-31_17-41-07.pngDectris_centre_faisceau_2026-03-31_17-19-05.png
/!\ fort impact du moteur Rsample de la ligne X sur la cavité CFP (obligé de le mettre off)

*** Prise mesure Monochromateur ***

* angle initiale mono : Ry_mono(0) = -0.1° (ajouté aux valeurs d'angles pour la position moteur)
Entry   KD; shift du 31 mars 2026 
7h55 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

==> vérifier la pression SF6 avant de commencer.  2461mB

HV On
Entry   MJ KD IC VM DN RC; ENERGY-ANGLE 70 MeV - 27 mars 2026 droma_70_MeV.png
** Programme : Energy-Angle 70 MeV

7h40 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)
08h57 HV is ON
Entry   IC, VM, DN, MJ;  MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png
7h37 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h57 HV is ON

==> 70 MeV, F=500.031645 MHz
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026; Ring studies 
7h30 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h40 HV ON

==> 50 MeV, Manual phase shifter value set to 3209. Sect. temperatute set to 30C at clarinette, (consigne = 29.2C).
Entry   KD, VM, MJ, RC; shift du 24 mars 2026 HorOrbit_vs_Att.png
8h05 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

09h17 HV is ON

11h36 Mod. on standby
Entry   IC, VM; Work on orbit at 70 MeV for X rays xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png
7h20: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h55 HV is ON

10h07 70 MeV. Beam is in the ring with RF 100 kV, phase -37.5 dg. The recipe_recipe_LI_TL_RI_good_20260318_16_17_14.txt loaded, linac steerers
Entry   Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026; , entered from 127.0.0.1 
7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.

08h56 HV is on
Entry   KD, VM, MJ, RC, DN; shift du 18 mars 2026 8x
8h: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

*** Programme : Mesure spectre et monochromateur à 61.5MeV
(70MeV si le temps le permet)
Entry   KD MJ RC DN VK; ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 
8h05 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

*** programme : Mesures : sol 230 100 pC

- Taille vert. e- (FPC)   ==> FAIT  
Entry   MJ HG VK; Etudes de points MATCHING - 13 mars 2026 
Programme : Etudes points Matching
==============================

Fentes2 centre faisceau a l’œil [H , V] = [7 , -18]
Entry   Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON
Entry   MJ, KD; MONOCHROMATEUR - 12 mars 2026 
Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2 0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20 , H-20 , H+20 , V-20

-----------------------------------------------------------------------------------------------------------
Entry   KD, VM, MJ, RC, DN; shift du 12 mars 2026 
8h: mise en chauffe de la machine en remote (modulateur, laser, frigo/chillers, cyclage)

*** Programme ***

- Prise de données MonoChromateur. 
Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026; Emittance vs Iris 
Some Quad scans with variying the Iris opening.

Data :


17h17 : 2mm 120 pC
17h31 : 1.3mm 100pC
17h46 : 1mm 80pC
18h00 : 1mm 100 pC
18h27 : 1mm 100
Entry   KD, VM, MJ, RC; shift du 11 mars 2026 - TRANSFOCATEUR diode_calib_2026-03-11_14-07-08.pngdiode_calib_2026-03-11_14-08-13.png
8h: mise en chauffe en remote (cyclage, modulateur, laser, frigo/chiller)
clients et réseau très lent ==> reboot à faire sur TOUT les clients (client1 à 100% de la mémoire
de prise)
Entry   Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift  
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)