ID Date Author Status Type Category Important Subject Icon Text Attachments
  Draft   Fri Apr 3 07:51:41 2026 IC,VM, NDUnder ProcessShift summary  , entered from 127.0.0.1 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h30 HV is ON
  
  Draft   Thu Apr 2 07:55:49 2026 IC,VMUnder ProcessShift summary    7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h58 HV is ON
  
  1223   Wed Apr 1 07:45:03 2026 KD MJ RC DN VKUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning 1e avril 2026 - Scan Energy-Angle 61.5 MeV 7h40 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

==> SF6 à remplir avant
 orbite_61p5_MeV_2026-04-01_19-24-56.png 
  1222   Tue Mar 31 15:42:33 2026 KD MJFixedShift summaryLaser | Linac Commissionning | Ring Commissioning shift du 31 mars 2026 : MONO 70 MeV + spectres 61.5 MeV /!\ fort impact du moteur Rsample de la
ligne X sur la cavité CFP (obligé
de le mettre off)
 Droma_61p5_MeV_2026-03-31_17-41-07.pngDectris_centre_faisceau_2026-03-31_17-19-05.png 
  Draft   Tue Mar 31 07:56:57 2026 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 31 mars 2026 7h55 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

==> vérifier la pression
  
  1220   Fri Mar 27 07:41:15 2026 MJ KD IC VM DN RCFixedShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE 70 MeV - 27 mars 2026 **
Programme : Energy-Angle 70 MeV

7h40 : mise en chauffe en
 droma_70_MeV.png 
  Draft   Thu Mar 26 07:39:02 2026 IC, VM, DN, MJUnder ProcessShift summary    7h37 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

08h57 HV is ON
 MRSV_Size_vs_LaserPhase.pngHorOrbit_vs_LaserPhase.pngMRSV17h38.pngDispersionAfterLOCO20260326_16h54.png20260326_18h24_TL_Dispersion.png 
  Draft   Wed Mar 25 07:28:22 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026 Shift summaryLinac Commissionning | Ring Commissioning Ring studies 7h30 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

08h40 HV ON
  
  Draft   Tue Mar 24 08:10:35 2026 KD, VM, MJ, RCUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 24 mars 2026 8h05 : mise en chauffe en remote (frigo/chiller,
modulateur, laser, cyclage)

09h17 HV is ON
 HorOrbit_vs_Att.png 
  Draft   Fri Mar 20 07:20:47 2026 IC, VMUnder ProcessShift summary  Work on orbit at 70 MeV for X rays 7h20: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

08h55 HV is ON
 xorbit70MeV_Xrays_20032026.pngyorbit70MeV_Xrays_20032026.pngScreenshot_from_2026-03-20_15-49-43.pngY_orbit61.5MeV4Xrays.pngX_orbit61.5MeV4Xrays.png 
  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 7h45: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

8h46 The photocathode laser image
  
  1214   Wed Mar 18 07:58:19 2026 KD, VM, MJ, RC, DNUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 18 mars 2026 8h: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

*** Programme : Mesure
 8x 
  1213   Tue Mar 17 08:07:49 2026 KD MJ RC DN VKUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning ENERGY-ANGLE reconstruction : prise de donnees - 17 mars 2026 8h05 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

*** programme : Mesures
  
  1212   Sun Mar 15 18:42:53 2026 MJ HG VKFixedShift summaryLinac Commissionning | Ring Commissioning Etudes de points MATCHING - 13 mars 2026 Programme :
Etudes points Matching
==============================
  
  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  1210   Thu Mar 12 15:17:49 2026 MJ, KDFixedShift summaryLinac Commissionning | Ring Commissioning MONOCHROMATEUR - 12 mars 2026 Alignement CdTe On-axis a l'oeil
Prises spectres ouvertures fentes2
0.3x0.3 : OnAxis , V+40 , H+40 , H+20 , V+20
  
  Draft   Thu Mar 12 07:57:41 2026 KD, VM, MJ, RC, DNUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 12 mars 2026 8h: mise en chauffe de la machine en remote
(modulateur, laser, frigo/chillers, cyclage)

*** Programme ***
  
  1208   Wed Mar 11 18:12:23 2026 Entered by Super Team from 127.0.0.1 on Wed Mar 11 18:12:09 2026Under ProcessShift summaryLI Emittance vs Iris Some Quad scans with variying the Iris
opening.

Data :
  
  1207   Wed Mar 11 08:03:48 2026 KD, VM, MJ, RCUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 11 mars 2026 - TRANSFOCATEUR 8h: mise en chauffe en remote (cyclage,
modulateur, laser, frigo/chiller)
clients et réseau très
 diode_calib_2026-03-11_14-07-08.pngdiode_calib_2026-03-11_14-08-13.png 
  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  