  757   Thu May 25 15:08:18 2023 NC,IC, VM,lS Shift summaryRing   9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
 ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png 
  435   Mon Apr 11 12:09:18 2022 Mo/JNC/CB Shift summaryLinac Commissionning Demarrage 12h00 démarrage modulateur et chillers,
fermeture casemate

15h : démarrage laser
  
  437   Mon Apr 11 16:57:32 2022 Mo/JNC/CB Shift summaryLinac Commissionning RE: Demarrage Pour ce qui est de la caméra laser,
l'interface image_laser ne gère
que l'affichage, donc si le server est
  
  508   Wed Jul 13 12:00:19 2022 Mo Shift summaryRF Anneau   12h00 Arret test modulateur et départ
de l'Ingé. de Scandinova

Ouverture de la casemate
  
  733   Tue Apr 11 22:34:19 2023 Marie Vincent Noureddine Jean-Noel Shift summaryLinac Commissionning   Debut vers 16h

Passage section avec Isol=200,
1.7 db, ph=110
  
  1164   Fri Dec 5 14:48:46 2025 Marie Julien Hayg Sophie Shift summaryLI | TL | LE | Ring Matching ring-TL - Recherche des bons twiss pour la TL Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL
 Screenshot_from_2025-12-05_18-26-56.png 
  448   Mon May 9 10:49:47 2022 MaherEntered by Super Team from 134.158.195.141 on Mon May 9 10:49:29 2022 Shift summaryLinac Commissionning   10h50 Modulateur en chauffe, chillers en
fonctionnement
  
  812   Mon Oct 30 09:39:05 2023 MaherNot FixedProblemInfra eau refroidissement circuit principal Bonjour

J'ai trouvé ce matin
( lundi 30/10 ) la pompe du circuit de refroidissement
  
  Draft   Thu Jan 23 08:44:17 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets
sycling
  
  1005   Fri Jan 24 08:45:26 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all
magnets
  
  1006   Fri Jan 24 17:39:00 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all
magnets
 Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png 
  999   Fri Jan 17 08:44:09 2025 MV, IC, VKUnder ProcessShift summaryRing Commissioning   08h43 Start ThomX: Modulator, frigo, laser,
cycling all magnets

08h50 Chillers started
 16x 
  Draft   Fri Jun 6 08:17:31 2025 MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025Under ProcessShift summaryRing Commissioning   08h15 ThomX was started; Modulator,
Frig, Laser

08h21 Chillers were started,
 ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png 
  469   Wed Jun 1 11:02:31 2022 MOEntered by Super Team from 134.158.195.141 on Wed Jun 1 11:02:17 2022 InfoRF D1 remplacement SF6 11h00 Le SF6 du réseau est vidé,
remplacé par SF6 neuf
  
  613   Thu Oct 27 09:13:49 2022 MO/SC/MJ LinacLinac Commissionning mesure energie impossible (licence) MO : Mise en route modulateur et refroidissement

Pas possible de mesurer l energie
avec le scipt habituel . Message suivant
  
  468   Tue May 31 09:21:02 2022 MO/SC/HG, JNC/CBFixedLinacElectronique Demarrage et faisceau 9h15 : Mise en chauffe modulateur et chiller
(SC/MO/HG)

Aujourd'hui : Alignement faisceau
 charge_phase__at_31-05-2022__10-39-33.jpg 
  399   Mon Mar 14 16:40:24 2022 MO/JNC Shift summaryLinac Commissionning démarrage du 14 mars Modulateur 1090, 0 dB voie canon, 
1.5dB sur la section

Image laser enregistrée,
 trend_charge_pertelaser.png 
  888   Tue Jul 23 11:55:42 2024 MO, MELK, MJUnder ProcessLinacLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Conditionnement section 23/07 Reprise de
conditionnement section 23/07 @ 10H30: largeur
impulsion 0.5 µs @10 Hz ( voir images
 signaux_rf_scope.pngsignaux_RF_redpitaya_.png 
  1139   Fri Oct 17 09:07:03 2025 MO VC ND VM Shift summaryLI | TL | LE | Linac Commissionning Shift summary demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
  
  705   Mon Mar 6 11:09:50 2023 MO VCUnder ProcessLinacLinac Commissionning | Ring Commissioning Commitionning 10 H demarrage chauffage modulateur et
chillers  (le pc modulateur était
planté  => Maher l'a redémarré)
  