  Toutes les notes concernant les Commissionning de ThomX, Page 12 of 63  Not logged in ThomX    logo
Entry   NC,IC, VM,lS;  ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png
9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
Entry   Mo/JNC/CB; Demarrage 
12h00 démarrage modulateur et chillers, fermeture casemate

15h : démarrage laser

pb serveur camera via IHM SST à redémarer laser y compris
    Reply   Mo/JNC/CB; RE: Demarrage 
Pour ce qui est de la caméra laser, l'interface image_laser ne gère que l'affichage, donc si le server est éteint il faut
l'allumer au préalable. Pour ce faire plusieurs solutions :


Astor:

taper "astor" sur un terminal
aller dans divers/srv_4 (caméra)
clic droit
Entry   Mo;  
12h00 Arret test modulateur et départ de l'Ingé. de Scandinova

Ouverture de la casemate
Entry   Marie Vincent Noureddine Jean-Noel;  
Debut vers 16h

Passage section avec Isol=200, 1.7 db, ph=110

Avec script alignement QUADS de Kevin
Entry   Marie Julien Hayg Sophie; Matching ring-TL - Recherche des bons twiss pour la TL Screenshot_from_2025-12-05_18-26-56.png
Programme shift : etudes matching anneau-TL - Recherche param twiss TL

Valeurs ideales TL "de Julien" : betaX = 36   betaY = 36   alphaX = -4.5   alphaY
= -4.5  ( = figure of merit tres petit)
Entry   MaherEntered by Super Team from 134.158.195.141 on Mon May 9 10:49:29 2022;  
10h50 Modulateur en chauffe, chillers en fonctionnement
Entry   Maher; eau refroidissement circuit principal 
Bonjour

J'ai trouvé ce matin ( lundi 30/10 ) la pompe du circuit de refroidissement en défaut, je n'ai pas pu la redémarrer
!
Entry   MV, IC, VK, RC;  
08h41 Start Thomx: Modulator, Frigo, Laser

08h46 Start chillers, all magnets sycling

09h50 Start RF
Entry   MV, IC, VK, RC;  
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK, RC;  Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png
08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all magnets

Vacuum intervention, beam pipe closed. Vacuum OK to start (11.23)
Entry   MV, IC, VK;  16x
08h43 Start ThomX: Modulator, frigo, laser, cycling all magnets

08h50 Chillers started

09h52 HV is 'On'
Entry   MV Entered by Super Team from 134.158.195.141 on Fri Jun 6 08:17:16 2025;  ThomX_PhaseChargeScan20250606.pngThomX_FPC_TableVerticalScan20250606.png
08h15 ThomX was started; Modulator, Frig, Laser

08h21 Chillers were started, cycling all magnets

09h40 HV is 'ON'
Entry   MOEntered by Super Team from 134.158.195.141 on Wed Jun 1 11:02:17 2022; remplacement SF6 
11h00 Le SF6 du réseau est vidé, remplacé par SF6 neuf
Entry   MO/SC/MJ; mesure energie impossible (licence) 
MO : Mise en route modulateur et refroidissement

Pas possible de mesurer l energie avec le scipt habituel . Message suivant :

License checkout failed.
Entry   MO/SC/HG, JNC/CB; Demarrage et faisceau charge_phase__at_31-05-2022__10-39-33.jpg
9h15 : Mise en chauffe modulateur et chiller (SC/MO/HG)

Aujourd'hui : Alignement faisceau (CB, HG, JNC, SC)

Valeur max photodiode : hier on avait 62 mV sur le scope (JNC) et aujourd'hui on a 0.58 de valeur de signal sur taurus (HG, SC)
Entry   MO/JNC; démarrage du 14 mars trend_charge_pertelaser.png
Modulateur 1090, 0 dB voie canon,  1.5dB sur la section

Image laser enregistrée, position h867, v 566 pixels, taille vsig*0.56mm, V 0.38mm rms

Charge phase max 140pC, 134 degrés,
Entry   MO, MELK, MJ; Conditionnement section 23/07 signaux_rf_scope.pngsignaux_RF_redpitaya_.png
Reprise de conditionnement section 23/07 @ 10H30: largeur impulsion 0.5 µs @10 Hz ( voir images ) 

signaux RF mesurés :

avec Oscillo :
Entry   MO VC ND VM; Shift summary 
demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
Entry   MO VC; Commitionning 
10 H demarrage chauffage modulateur et chillers  (le pc modulateur était planté  => Maher l'a redémarré)

11h20 chauffage Klystron terminé

pause repas