HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 1 of 59  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Kevin D.; Laser PC status 
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;  
Entry   IC, VM; Restart of the accelerator GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png
Entry   IC, HG, JNC; Restart of the accelerator 
Entry   Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026; manip Gplast 
Entry   Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026; manip Gplast Screenshot_from_2026-05-12_10-33-26.png
Entry   Vincent; Manip Gplast 
Entry   Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026; , entered from 127.0.0.1 
Entry   IC, VM;  
Entry   IC,VM;  
Entry   KD, VM; shift du 21 avril 2026 
Entry   IC;  
Entry   IC,VM, HG, RC, DN; beam studies. FPC.  
Entry   Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026; , entered from 127.0.0.1 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png
Entry   KD MJ RC DN VK; ENERGY/ANGLE 40 MeV - 15 avril 2026 
Entry   IC,VM; Beam studies. preparation for 40 MeV 
Entry   IC,VM;  
Entry   IC,VM;  
Entry   7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage); , entered from 127.0.0.1 
Entry   IC,VM, KD, DN, MJ; MONO 61.5 MeV - 07 avril 2026 