1245
|
Fri Jun 12 13:08:13 2026 |
Kevin D. | Reference Solution | Info | Laser | Opt | Linac Commissionning |
|
Laser PC status | | mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188
** Laser PC ***
- Sortie Laser: 120 uJ |
|
|
Draft
|
Tue Jun 9 10:13:24 2026 |
Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026 | | | |
|
| | 10h02 Start-up modulator, laser, fridge,
chillers
The SF6 pressure is low. Magnet |
|
|
Draft
|
Wed Jun 3 08:54:55 2026 |
IC, VM | Under Process | Urgent | LI | RF Anneau |
|
Restart of the accelerator | | 08h45 Start-up modulator, laser, magnets
09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not |
 |
|
Draft
|
Wed Jun 3 08:41:41 2026 |
IC, HG, JNC | | Shift summary | |
|
Restart of the accelerator | | 02/06/2026
~15h30 Starting all system
16h Start up of the modulator, |
|
|
1241
|
Wed May 13 08:35:16 2026 |
Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026 | Under Process | Other | LI |
|
manip Gplast | | demarrage machine 8h30
faisceau ok vers 10H
14h mesure 50 MeV |
|
|
1240
|
Tue May 12 08:42:45 2026 |
Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026 | Under Process | Other | LI |
|
manip Gplast | | Demarrage machine 8h40
pB reflechi canon... temp consigne
27.7C |
|
|
1239
|
Mon May 11 09:33:17 2026 |
Vincent | Under Process | Linac | LI | TL |
|
Manip Gplast | | 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)
13h30 fenetre installée |
|
|
Draft
|
Fri Apr 24 08:05:11 2026 |
Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026 | | | |
|
, entered from 127.0.0.1 | | 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) |
|
|
Draft
|
Thu Apr 23 09:06:22 2026 |
IC, VM | | | |
|
| | 9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) |
|
|
Draft
|
Wed Apr 22 10:26:28 2026 |
IC,VM | | | |
|
| | Dalkia solved the problem with vooling
circuit in the morning
10h15 mise en chauffe (frigo/chillers, |
|
|
Draft
|
Tue Apr 21 07:36:54 2026 |
KD, VM | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
shift du 21 avril 2026 | | 7h30 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) ==> dipôles
non cyclé (en défaut) ==> |
|
|
Draft
|
Mon Apr 20 10:37:11 2026 |
IC | | Shift summary | |
|
| | 10h30 : mise en chauffe (frigo/chillers,
modulateur, laser, cyclage)
All rondes are broken, THOMX key |
|
|
Draft
|
Fri Apr 17 07:40:22 2026 |
IC,VM, HG, RC, DN | | Shift summary | Linac Commissionning | Ring Commissioning |
|
beam studies. FPC. | | 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
08h45 HV is on |
|
|
Draft
|
Thu Apr 16 07:32:25 2026 |
Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026 | | | |
|
, entered from 127.0.0.1 | | 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
9h00 HV is ON |
 |
|
1231
|
Wed Apr 15 08:04:29 2026 |
KD MJ RC DN VK | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
ENERGY/ANGLE 40 MeV - 15 avril 2026 | | 8h05: mise en chauffe à distance
(frigo/chillers, modulateur, laser, cyclage)
*** |
|
|
Draft
|
Tue Apr 14 08:03:01 2026 |
IC,VM | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Beam studies. preparation for 40 MeV | | 8h00 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
10h Problem with modulator; It |
|
|
Draft
|
Fri Apr 10 07:39:37 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 7h40 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
08h43 HV is ON |
|
|
Draft
|
Thu Apr 9 08:11:33 2026 |
IC,VM | Under Process | Shift summary | |
|
| | 8h10 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
09h12 HV is ON |
|
|
Draft
|
Wed Apr 8 07:29:51 2026 |
7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage) | | | |
|
, entered from 127.0.0.1 | | 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
8h30 HV is ON |
|
|
1226
|
Tue Apr 7 07:49:37 2026 |
IC,VM, KD, DN, MJ | Under Process | Shift summary | Linac Commissionning | Ring Commissioning |
|
MONO 61.5 MeV - 07 avril 2026 | | 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
09h30 HV is ON |
|