  1245   Fri Jun 12 13:08:13 2026 Kevin D.Reference SolutionInfoLaser | Opt | Linac Commissionning Laser PC status mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188

** Laser PC ***

- Sortie Laser: 120 uJ 
  
  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      10h02 Start-up modulator, laser, fridge,
chillers

The SF6 pressure is low. Magnet
  
  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not
 GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png 
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  1241   Wed May 13 08:35:16 2026 Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026Under ProcessOtherLI manip Gplast demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
  
  1240   Tue May 12 08:42:45 2026 Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026Under ProcessOtherLI manip Gplast Demarrage machine 8h40

pB reflechi canon... temp consigne
27.7C
 Screenshot_from_2026-05-12_10-33-26.png 
  1239   Mon May 11 09:33:17 2026 VincentUnder ProcessLinacLI | TL Manip Gplast 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)

13h30 fenetre installée
  
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Thu Apr 23 09:06:22 2026 IC, VM      9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Wed Apr 22 10:26:28 2026 IC,VM      Dalkia solved the problem with vooling
circuit in the morning

10h15 mise en chauffe  (frigo/chillers,
  
  Draft   Tue Apr 21 07:36:54 2026 KD, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 21 avril 2026 7h30 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) ==> dipôles
non cyclé (en défaut) ==>
  
  Draft   Mon Apr 20 10:37:11 2026 IC Shift summary    10h30 : mise en chauffe  (frigo/chillers,
modulateur, laser, cyclage)

All rondes are broken, THOMX key
  
  Draft   Fri Apr 17 07:40:22 2026 IC,VM, HG, RC, DN Shift summaryLinac Commissionning | Ring Commissioning beam studies. FPC.  7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h45 HV is on
  
  Draft   Thu Apr 16 07:32:25 2026 Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

9h00 HV is ON
 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png 
  1231   Wed Apr 15 08:04:29 2026 KD MJ RC DN VKUnder ProcessShift summaryLinac Commissionning | Ring Commissioning ENERGY/ANGLE 40 MeV - 15 avril 2026 8h05: mise en chauffe à distance
(frigo/chillers, modulateur, laser, cyclage)

***
  
  Draft   Tue Apr 14 08:03:01 2026 IC,VM Shift summaryLinac Commissionning | Ring Commissioning Beam studies. preparation for 40 MeV 8h00 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

10h Problem with modulator; It
  
  Draft   Fri Apr 10 07:39:37 2026 IC,VMUnder ProcessShift summary    7h40 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

08h43 HV is ON
  
  Draft   Thu Apr 9 08:11:33 2026 IC,VMUnder ProcessShift summary    8h10 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

09h12 HV is ON
  
  Draft   Wed Apr 8 07:29:51 2026 7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)    , entered from 127.0.0.1 7h30 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)

8h30 HV is ON
  
  1226   Tue Apr 7 07:49:37 2026 IC,VM, KD, DN, MJUnder ProcessShift summaryLinac Commissionning | Ring Commissioning MONO 61.5 MeV - 07 avril 2026 7h50 : mise en chauffe en remote (frigo/chillers,
modulateur, laser, cyclage)
09h30 HV is ON
  