50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
|
|
51
|
Thu Mar 23 12:29:05 2023 |
ND | New Solution | Info | resumes |
|
Réunion Physique ThomX | | Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion
de Physique de ThomX: |
|
|
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
|
|
54
|
Tue May 30 10:12:30 2023 |
VK, IC, JH, VM, LS, MB, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | Main studies:
- Measure bucket width in phase
on Thursday at 500.02MHz => no storage |
|
|
55
|
Fri Jun 9 19:57:14 2023 |
KD | New Solution | Info | Prise de donnees |
|
Mise en place Ligne X | | Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée |
 |
|
Draft
|
Mon Jun 12 09:51:00 2023 |
IC, VK, VM, LS, JH, MB, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting | | Comments:
* There are strong evidences that
part of the frequency problem comes from |
|
|
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
|
|
58
|
Thu Jun 22 07:41:18 2023 |
KD | New Solution | Info | Prise de donnees |
|
RE: Mise en place Ligne X | | hier et ce matin la ligne a été
re-réglé.
La table optique a été |
|
|
59
|
Mon Jun 26 09:57:52 2023 |
VK, IC, LS, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Discussion mécanique
- Tous les dipoles ont été
alignés par rapport à des surfaces |
|
|
6
|
Thu Dec 3 10:58:11 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 10:57:47 2020 | Fixed | Info | docs |
|
demarrage a blanc 3 dec 2020 | | Bilan démarrage à blanc 3
dec 2020 : (H Monard, S Cavalier)
but : verification etat IHM pour |
|
|
7
|
Thu Dec 3 13:45:13 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:44:55 2020 | Fixed | Info | docs |
|
signal photodiode laser | | |
|
|
8
|
Thu Dec 3 13:50:27 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 13:50:13 2020 | Fixed | Info | Prise de donnees |
|
signal photodiode 03-12-20 | | |
|
|
9
|
Thu Dec 3 15:17:04 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:16:48 2020 | Fixed | Info | Prise de donnees |
|
| | Signaux RF - REdPitaya 03-12-20
Photodiode laser - RP.04 A
QS RP.04 B |
|
|
10
|
Thu Dec 3 15:26:22 2020 |
Entered by Hugues Monard from 134.158.195.145 on Thu Dec 3 15:26:07 2020 | Fixed | Info | Prise de donnees |
|
| | signaux photodiode PrC Qs test avec generateur
impulsion ! 2 V , 3 µs (bleu ciel)
et signal avec rampe, 1V (moire), photodiode |
|
|
11
|
Wed Dec 9 14:26:35 2020 |
Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020 | Fixed | Info | etc |
|
re-organisation PC-client en SdC | | suite à la discussion de lundi 7
/12/20, les PC clients en SdC ont été
déplacés et re-organisé |
|
|
40
|
Mon Dec 5 17:42:51 2022 |
CB/HG/SC/KD | Fixed | Info | resumes |
|
Programme linac semaine 5 décembre | | Lundi 5 décembre :
redémarrage technique
Pb refroidissement Pb |
|
|
Draft
|
Tue Dec 1 14:35:01 2020 |
Entered by Hayg Guler from 134.158.195.145 on Tue Dec 1 14:34:08 2020 | | | |
|
| | Laser :
Camera : mettre le temps d'exposition
à 0.2 secondes |
|
|
22
|
Fri Mar 4 11:07:28 2022 |
CB/SC | | Problem | problemes |
|
liste des actions à menées | | |
|
|
25
|
Fri Sep 2 08:51:46 2022 |
MO | | Shift summary | etc |
|
démarrage | | 8h35 mise sous tension: PSS, LB9000,
modulateur, chillers |
|