  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Discussion mécanique

- Tous les dipoles ont été
alignés par rapport à des surfaces
  
  58   Thu Jun 22 07:41:18 2023 KDNew SolutionInfoPrise de donnees RE: Mise en place Ligne X hier et ce matin la ligne a été
re-réglé.

La table optique a été
  
  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting Report from last week:

- Attempted the strategy suggested
by Alex
  
  Draft   Mon Jun 12 09:51:00 2023 IC, VK, VM, LS, JH, MB, NDNew SolutionInfoPrise de donnees Summary of the ring commissioning meeting Comments:

* There are strong evidences that
part of the frequency problem comes from
  
  55   Fri Jun 9 19:57:14 2023 KDNew SolutionInfoPrise de donnees Mise en place Ligne X Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée
 gain_pico.pngfenetre_pico.png 
  54   Tue May 30 10:12:30 2023 VK, IC, JH, VM, LS, MB, NDNew SolutionInfoanalyse Summary of the ring commissioning meeting Main studies:

- Measure bucket width in phase
on Thursday at 500.02MHz => no storage
  
  53   Mon May 22 10:05:30 2023 IC, VK, LS, JH, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting === Summary of last week:

- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns
  
  52   Fri Mar 31 10:37:18 2023 KDUnder ProcessOtherPrise de donnees mesures et shifts Linac Réunion 31/03

Prochaines mesures à faire
:
  
  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion
de Physique de ThomX:
  
  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting - Went up to 100kV in the cavity once it
was tuned.

- Achieved nice storage stable
  
  49   Mon Mar 13 09:39:39 2023 IC, VM, SC, JH, VC, NDNew SolutionShift summaryanalyse Summary of the ring commissioning meeting Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune.
 data_2023-03-10_15-39-12.pngtbt_x_relative_integer2.pngtune_simulation.pngtune.pngtbt_x_kicker.png 
  48   Fri Feb 24 10:34:58 2023 NDNew SolutionInfoPrise de donnees RE: Notes from ThomX Physics meeting Présent: VK, SC, KD, MJ, HG, ND

Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/
  
  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting This week: beam on Thursday.

So far we did not see any screenshot
of Ring variables check.
  
  46   Thu Feb 9 12:16:41 2023 NDNew SolutionInfoPrise de donnees Verification variables pour l'anneau L'IHM de verification des variables
pour l'anneau a ete mis a jour.

Il est accessible dans plateforme
 ring_vars_2023_02_09_12_15.png 
  45   Tue Jan 24 10:14:20 2023 NDNew SolutionInfoPrise de donnees Notes from ThomX Physics meeting Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)

Visio: CB
  
  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas
may try to tune the machine with students.
  
  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting Summary of last week:

- On Thursday the beam energy was
very different from usual (magnets current
  
  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting Notes from last week:


Beam was very unstable
(probably energy instabilities), lot of time
 20_injections.jpg 
  41   Tue Dec 6 00:15:55 2022 NDNew SolutionInfoanalyse RE: Summary of the ring commissioning meeting Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232.
  
  40   Mon Dec 5 17:42:51 2022 CB/HG/SC/KDFixedInforesumes Programme linac semaine 5 décembre Lundi 5 décembre :
redémarrage technique

Pb refroidissement  Pb
  