59
|
Mon Jun 26 09:57:52 2023 |
VK, IC, LS, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Discussion mécanique
- Tous les dipoles ont été
alignés par rapport à des surfaces |
|
|
58
|
Thu Jun 22 07:41:18 2023 |
KD | New Solution | Info | Prise de donnees |
|
RE: Mise en place Ligne X | | hier et ce matin la ligne a été
re-réglé.
La table optique a été |
|
|
57
|
Mon Jun 19 09:46:32 2023 |
IC, VK, VM, LS, JH, SC, ND | New Solution | Shift summary | resumes |
|
Summary of the ring commissioning meeting | | Report from last week:
- Attempted the strategy suggested
by Alex |
|
|
Draft
|
Mon Jun 12 09:51:00 2023 |
IC, VK, VM, LS, JH, MB, ND | New Solution | Info | Prise de donnees |
|
Summary of the ring commissioning meeting | | Comments:
* There are strong evidences that
part of the frequency problem comes from |
|
|
55
|
Fri Jun 9 19:57:14 2023 |
KD | New Solution | Info | Prise de donnees |
|
Mise en place Ligne X | | Aujourd'hui (09/06/2023), la Table1
de la ligne X est mise en position faisceau.
Je l'ai approximativement alignée |
 |
|
54
|
Tue May 30 10:12:30 2023 |
VK, IC, JH, VM, LS, MB, ND | New Solution | Info | analyse |
|
Summary of the ring commissioning meeting | | Main studies:
- Measure bucket width in phase
on Thursday at 500.02MHz => no storage |
|
|
53
|
Mon May 22 10:05:30 2023 |
IC, VK, LS, JH, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | === Summary of last week:
- Frequency was reduced to 500.0202MHz
but the beam stayed only for 100s of turns |
|
|
52
|
Fri Mar 31 10:37:18 2023 |
KD | Under Process | Other | Prise de donnees |
|
mesures et shifts Linac | | Réunion 31/03
Prochaines mesures à faire
: |
|
|
51
|
Thu Mar 23 12:29:05 2023 |
ND | New Solution | Info | resumes |
|
Réunion Physique ThomX | | Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/
Quelques notes de la réunion
de Physique de ThomX: |
|
|
50
|
Mon Mar 20 10:08:24 2023 |
IC, VK, VM, JH, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | - Went up to 100kV in the cavity once it
was tuned.
- Achieved nice storage stable |
|
|
49
|
Mon Mar 13 09:39:39 2023 |
IC, VM, SC, JH, VC, ND | New Solution | Shift summary | analyse |
|
Summary of the ring commissioning meeting | | Excitation (betatron oscillation) on the
beam observed by exciting it with the extraction
kicker => initial measures of the tune. |
    |
|
48
|
Fri Feb 24 10:34:58 2023 |
ND | New Solution | Info | Prise de donnees |
|
RE: Notes from ThomX Physics meeting | | Présent: VK, SC, KD, MJ, HG, ND
Présentation par Marie.
Cf indico https://indico.ijclab.in2p3.fr/event/9242/ |
|
|
47
|
Mon Feb 20 10:06:36 2023 |
VM, VK, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | This week: beam on Thursday.
So far we did not see any screenshot
of Ring variables check. |
|
|
46
|
Thu Feb 9 12:16:41 2023 |
ND | New Solution | Info | Prise de donnees |
|
Verification variables pour l'anneau | | L'IHM de verification des variables
pour l'anneau a ete mis a jour.
Il est accessible dans plateforme |
|
|
45
|
Tue Jan 24 10:14:20 2023 |
ND | New Solution | Info | Prise de donnees |
|
Notes from ThomX Physics meeting | | Present: IC, VK, VM, VC, SC, MEK, KD, MJ,
HG, ND, MO (sous réserve d'oublis)
Visio: CB |
|
|
44
|
Mon Jan 23 09:54:14 2023 |
VK,IC, SC, VM, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | No beam last week. No beam this week.
Machine recovery on 2/2 => Nicolas
may try to tune the machine with students. |
|
|
43
|
Mon Jan 16 09:38:16 2023 |
VK, VM, SC, ND, HG | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Summary of last week:
- On Thursday the beam energy was
very different from usual (magnets current |
|
|
42
|
Mon Jan 9 10:12:40 2023 |
IC, VK, VM, SC, ND | New Solution | Info | resumes |
|
Summary of the ring commissioning meeting | | Notes from last week:
Beam was very unstable
(probably energy instabilities), lot of time |
|
|
41
|
Tue Dec 6 00:15:55 2022 |
ND | New Solution | Info | analyse |
|
RE: Summary of the ring commissioning meeting | | Regarding the remote control of the RF
synthetizer: it can only be controlled via
GPIB and RS-232. |
|
|
40
|
Mon Dec 5 17:42:51 2022 |
CB/HG/SC/KD | Fixed | Info | resumes |
|
Programme linac semaine 5 décembre | | Lundi 5 décembre :
redémarrage technique
Pb refroidissement Pb |
|