  33   Mon Oct 3 17:29:53 2022 IC, VK, VI (ND)New SolutionInforesumes Summary of the ring commissioning meeting #3 
Shift summaries for the ring for last week are at

https://elog.lal.in2p3.fr/THOMX/Commissionning/568

https://elog.lal.in2p3.fr/THOMX/Commissionning/570

https://elog.lal.in2p3.fr/THOMX/Commissionning/571

The problem with the pulse jumpis with 12ns delays has been identified and fixed (it was related to the synchronisation system).

The main issue identified last week is a problem with RI-C2/PS/QP.09, RI-C2/PS/QP.10 and RI-C2/PS/QP.12 which has been addressed after the meeting (see https://elog.lal.in2p3.fr/THOMX/Commissionning/572).

It is important that the laser energy and linac beam charge are checked and optimised every week.
  35   Mon Oct 10 10:04:49 2022 VK, IC, VI, JH, NDUnder ProcessShift summaryresumes Summary of the ring commissioning meeting #4 

- 300 turns achieved.

- Probably more but limited by libera cut-off frequency.

- Need to measure the injection axis

- Need emittance measurement from the transfer line

- Several measurements are not possible because of lack of progress on the transfer line

 

  37   Mon Oct 17 10:02:07 2022 VK, IC, VI, JH, SC, NDReference SolutionInforesumes Summary of the ring commissioning meeting #5 

See slides attached to the indico page https://indico.ijclab.in2p3.fr/event/8885/

Pb with BPM => visual check of electrodes + hardware swap

Pb with steerer => Need to identify who will do the intervention and when

Nicolas will ask Kevin for support.

Suggestion: Since the magnetic field stability of the bending magnet which is being used to measure the beam energy is still questioned, it is suggested to wind a wire into a small, flat, electric coil and to place it in the magnet gap or close to it so that the field crosses orthogonally the coil plane, and to monitor the voltage across the coil with an oscilloscope (the e- beam being turned off and the bending magnet being powered, of course). Some dimensional calculation would be needed.

Alignement: Slava got the data from Denis. Alignment is close from nominal values.
The beam quality is good enough to start working with the RF cavity. Even with low power in  RF cavity we would like to have a first control of voltage and phase from the control room (Thursday or Friday afternoon).

Some energy instabilities have been observed. Look at correlations (Vincent's measurements) + check that the current operating phase is optimal.

=> Check if position fluctuations are the same with one steerer on, TL/DP/PS.01 off + TL/SST1 and steerer off, TL/DP/PS.01 on + TL/SST2.

Optimum injection trajectory has been recorded on Friday.

 

Next meeting: 7th Novembre

 

 

 

 

 

  38   Mon Nov 7 23:53:29 2022 VK, IC, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting 
Discussed recent orbit correction of the expanded orbit. 
Need to make run with  cavity detuning from its resonant conditions used in the conditioning. 
 
Discussed measurement of tune, and possible origins of inconsistant/noisy measurements.  Either BPMs signal processing or  weak excitation. Beam size?
Need to do measurements with scope, to see if we can interpret TbT data in post-processing. Will ask Vincent to help with scope and measurements.
 
Need of RF cavity operation to continue ring commissioning.
 
  40   Mon Dec 5 17:42:51 2022 CB/HG/SC/KDFixedInforesumes Programme linac semaine 5 décembre 

Lundi 5 décembre : redémarrage technique

Pb refroidissement  Pb réglé le mercredi matin concomitance (anneau/linac), sensible à la pression qui est dans le réseau primaire, à surveiller

Attention connectique Profibus des alimentations

Point de fonctionnement du canon à 31 degrés à 1070 V: prévoir une vérification au prochain redémarrage technique selon la tension du klystron

Absence de tableau de conversion Puissance redpitaya   gradient (KD, VC)

Réglage du laser  vérifier à la prochaine redémarrage technique

Soleno  campagne de réalignement (pas prioritaire)

Modèle mis à plat dans MML, on a fait des premières mesures seulement QP1, 2 puis le 3

Mardi 6 décembre

Point de fonctionnement, à creuser consigne température/tension klystron

Test hors MML/lentille épaisse  ca concorde

Des scans avec un seul quadrupole, QP1

Mercredi 7 décembre

Scan systématique QP1 en fonction de coil2

Kevin a retravailler le traitement des images

Iris de 0.7, halo important

Premier résultat satisfaisant d’analyse des Twiss

Améliorer la partie analyse d’image (KD)

Chercher quad à fait à appliquer en unité physique, switch2physics  ou setpv avec argument (units, ‘’Physics’), NB : TL, par défaut en online

Vérifier que les valeurs concordent, scan avant (pour checker conditions)

Mettre QP1, puis QP2, puis QP3

Améliorer : prise en compte du cyclage dans ce genre de mesure, vérifier les mesures, (KD, vérifie mesure disponibles)

  42   Mon Jan 9 10:12:40 2023 IC, VK, VM, SC, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

Notes from last week:

  • Beam was very unstable (probably energy instabilities), lot of time was spent tuning the injector.
  • Beam instabilities prevented us from having a good storage.
  • Unable to start the extraction line dipole.

Comments:

  • It seems too early to plan radioprotection checks as:
    • we have not yet been able to store the beam and then extract it in a working extraction line.
    • beam is too unstable.
  • Beam instabilities prevent progress on the ring studies.
  • Beam stability characterisation of the upstream parts of the accelerator are necessary.

 

  43   Mon Jan 16 09:38:16 2023 VK, VM, SC, ND, HGNew SolutionInforesumes Summary of the ring commissioning meeting 

Summary of last week:

- On Thursday the beam energy was very different from usual (magnets current higher 172A for TL; 176A for RI) => made it impossible to re-use previous settings for the ring and to find new settings.

- On bith days, beam was unstable at TL/SST.02 and at the entrance of the ring. Part of the stability (but not enough) was recovered by setting TL/QP.4 and TL/QP5 to the same value.

=> not able to keep the beam in the ring for more than 500us or to inject more than 50pC.

Requirements to discuss on Friday:

- Get the results of the klystron power measurements

- Energy and charge stability

- Establish a working point for the lines.

- Linac alignement

Measurements to be done and documented:

- Stability of dark current (VM on 2/2)

- stability shot to shot and hourly-stability  (laser power, laser position, phase gun-laser [VC is working on it], phase gun-entrance section, phase gun-exit section, charge at the exit of the gun, charge at the exit of the section, energy and charge in the dispersive line)
=> charge stability measurement ND on 2/2 + 9/2.

- Dipole power supplies and dipole field

- RF power stability (Klystron, ...)

- Data alignement (ND on 2/2 + 2/9)

 

 

 

 

  44   Mon Jan 23 09:54:14 2023 VK,IC, SC, VM, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

No beam last week. No beam this week.

Machine recovery on 2/2 => Nicolas may try to tune the machine with students.

Data taking on 9/2 for diags and machine characterization.

Next shift for the ring on Friday 17/2 + Friday 24/2 + Friday 10/3. No beam on 3/3 (winter vacation).

Beam on 9/3 will be dedivcated to BPM training for PERLE.

 

Reminder for the previous ring meeting - Measurements to be done and documented:

- Stability of dark current (VM on 2/2 or 9/2; ND to prepare the measure with ICT+WAC ; IC will prepare measure with scope)

- stability shot to shot and hourly-stability  (laser power, laser position, phase gun-laser [VC is working on it], phase gun-entrance section, phase gun-exit section, charge at the exit of the gun, charge at the exit of the section, energy and charge in the dispersive line)
=> charge stability measurement ND on 2/2 + 9/2.

- Data alignement (ND on 2/2 + 2/9)

Next ring meeting 13/2

 

  47   Mon Feb 20 10:06:36 2023 VM, VK, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

This week: beam on Thursday.

So far we did not see any screenshot of Ring variables check.

Looking at last week's data, shot to shot charge instability seems to be > 15%

We need transverse emittance measurement for the ring shift (Thursday).

  50   Mon Mar 20 10:08:24 2023 IC, VK, VM, JH, NDNew SolutionInforesumes Summary of the ring commissioning meeting 

- Went up to 100kV in the cavity once it was tuned.

- Achieved nice storage stable for 2500 turns and some beam for > 100ms

- Measured the tune: several peaks around 0.35[1] (near the expected value) and one peak not understood at 0.5

- We observed storage at different frequencies spaced by about 10kHz

- Shall we try to return close from the nominal frequency?

 

Current status wrt to X-ray search:

- First we need to be able to reach reproducable storage from day to day

- X-ray searches can be started parasitically when the beam is stored

- Better understanding of the beam will come through measurements (at least until the summer): precise measurements of optics, beam parameters will be possible only with repeatable operations. This is crucial to reach the target parameters of the ring.

 

Next steps:

- This week (Friday afternoon - if beam available): try to reproduce results from last Friday; store, study injection, dispersion

- Next week: Thursday continue work on reproducibility; Friday 31st: scan in frequency starting from nominal frequency at lower voltage.

  51   Thu Mar 23 12:29:05 2023 NDNew SolutionInforesumes Réunion Physique ThomX 

Transparents sur: https://indico.ijclab.in2p3.fr/event/9358/

Quelques notes de la réunion de Physique de ThomX:

- Présentation de Marie sur les mesures dans le linac

- Présentation de Slava sur les  progrès de l'anneau

Actions pour la prochaine réunion:

- Mesures de paramètres de Twiss TL/SST.01 et TL/SST.03 with LI/COL=220A and LI/COL= 225A

- Réduire la fréquence de l'anneau

 

 

  57   Mon Jun 19 09:46:32 2023 IC, VK, VM, LS, JH, SC, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting 

Report from last week:

- Attempted the strategy suggested by Alex

- Comparison of orbit with RF ON and RF OFF helped understand the "natural" frequency of the ring: 500.33MHz

- Attempts to store at 500.22MHz did not sicceed. Storage at 500.27MHz.

Goals for this week:

- Beam on Thursday and Friday

- Work on BBA (IC, VK, VM) + extraction and BPMs (ND, LS)

- Measure below deformation

 

 

 

  59   Mon Jun 26 09:57:52 2023 VK, IC, LS, NDNew SolutionShift summaryresumes Summary of the ring commissioning meeting 

Discussion mécanique

- Tous les dipoles ont été alignés par rapport à des surfaces de référence

- Le décalage du centre magnétique par rapport au centre mécanique a été mesuré par Cynthia et pris en compte lors de l'installation

- Difficile de décaler les dipoles de l'IP car la table a été ajoutée après et bloque le déplacement des dipoles.

- Pour déplacer tout le demi-anneau RI-C2 l'un des soufflets (près du septum risque d'être limitant). Très long temps d'approvisoinnement si l'on veut de nouveau soufflets.

- Le plus simple pour Rodolphe: bouger les 4 dipoles d'extremité (RI-C[1-2]DP.0[1,4]): 1 heure de travail (pour un test approximatif). Par contre pour revenir à une position intiale c'est 1/2 journée par dipôle.

- Pour réaligner les dipôles il faut que Denis calcul les nouveaux coordonnés.

Question à vérifier:

- est-ce que l'on a de la marge à l'IP pour déplacer les dipôles vers l'extérieur? [Mesure mardi matin avant 10h]

- quelle est la course possible pour le soufflet près du septum?

- Est-ce qu'il est possible de rattraper le fait que la chambre de RI-C2/DP.04 soit trop courte?

Stratégie:

(1) Mesure de la course possible vers l'extérieur des dipôle de l'IP

(2) Calcul par Denis des nouveux coordonnées de tous les dipôles décalés de 1mm vers l'extérieur radialement

(3) Si possible, décalage des 8 dipôles, sinon décalage de 4 dipôles.

Autre besoin:

- Faire étude sur dipôle de rechange en ajoutant des plaques en acier.

===

Objectifs de la semaine:

- Avancer sur l'orbite à 500.33MHz

- BBA

- Déplacement orbite dans IP (avec CFP)

- Vérifier/améliorer transport amont anneau

- Opérations avec ligne d'extraction

 

 

  13   Thu Dec 10 14:43:07 2020 Entered by Nicolas Delerue from 193.55.29.171 on Thu Dec 10 14:42:53 2020Not FixedProblemproblemes Clients 1, 4 et 5 non fonctionnels 

En complément du message de Hayg, client 4 et 5 ne fonctionnent pas non plus (en plus de client 1).

Nicolas

  14   Wed Mar 3 10:49:14 2021 HaygUnder ProcessInfoproblemes WC tests TANGO 
  1. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
  2. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
  3. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
  4. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
  5. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean

 

Dans les variables MeanStd :

  • Charge 1 :
    • er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 
  • Charge 2 :
    • er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
    • er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
    • er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  
  • Charge 3 :
    • er_ca_rac.05-elr.01-wac.03_Ch0_chargeMean

 

  15   Wed Mar 3 11:30:46 2021 HaygUnder ProcessInfoproblemes RE: WC tests TANGO 

 

Hayg wrote:
  1. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.03_Ch0_chargeMean
  2. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.01_Ch0_chargeMean
  3. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch0_chargeMean
  4. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch3_chargeMean
  5. CALC/DG/MeanStd_charge1/ER_CA_rac.05-elr.01-WAC.02_Ch4_chargeMean

 

Dans les variables MeanStd :

  • Charge 1 :
    • er_ca_rac.05-elr.01-wac.01_Ch0_chargeMean 
  • Charge 2 :
    • er_ca_rac.05-elr.01-wac.02_Ch0_chargeMean   
    • er_ca_rac.05-elr.01-wac.02_Ch3_chargeMean  
    • er_ca_rac.05-elr.01-wac.02_Ch4_chargeMean  
  • Charge 3 :
    • er_ca_rac.05-elr.01-wac.03_Ch0_chargeMean

 

 

  22   Fri Mar 4 11:07:28 2022 CB/SC Problemproblemes liste des actions à menées 
  4   Thu Jul 16 09:50:37 2020 Entered by Sophie Chance from 134.158.195.143 on Thu Jul 16 09:50:21 2020Under ProcessInfoetc demarrage à blanc 

debut du démarrage à blanc 9h45. Démarrage prévu par étape.

  11   Wed Dec 9 14:26:35 2020 Entered by Hugues Monard from 134.158.195.145 on Wed Dec 9 14:26:20 2020FixedInfoetc re-organisation PC-client en SdC 

suite à la discussion de lundi 7 /12/20, les PC clients en SdC ont été déplacés et re-organisé avec les numeros client1 ,2 , 3 ,4 ,5 dans le sens horaire en salle de controle, en commencant par la gauche en entrant

+----------------------------------------------------------------+

|                  client 3           client 4                       |

|  client 2                                        client 5          |

|                                                                           |

|     client 1                                                          |

|                                                        baie RP        |

|    baie                                     \                          |

+ --------------------------------         \----------------------+    

                             porte entrée SdC

 

 

  12   Wed Dec 9 14:33:08 2020 HaygUnder ProcessInfoetc RE:  

Pour info :

  • client 1 ne fonctionne pas encore. Il n'a pas été utilisé depuis longtemps, Guillaume a été prévenu pour y jeter un oeil.
  • Client 3 et 5 sont maintenant aux places qui n'ont qu'un seul écran. Une MAJ de la salle devra être faite pour
    • déplacer l'écran de sécu sur une autre table dans un angle (fond gauche ou droit)
    • mettre soit 4 écrans / soit un grand écran aux autres machines (excepté celui de la table CC)
      • Il faudra s'assurer que les écrans de grande taille puisse se mettre sur la table (attache)

 

ELOG V3.1.4-395e101