  Status of installation, including shipping and de-installation of test setups., Page 1 of 3  Not logged in ELOG logo
ID Date Author Status Type Category Locationdown Title Text Attachments
  11   Fri Feb 26 17:04:57 2021 Ronic ChicheFixedreportmechanicsThomX iglooMoving the optical table to the IglooThis morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem.
 9x 
  12   Mon May 17 11:53:35 2021 Ronic ChicheFixedinfoutilitiesThomX iglooThomX housing roof openingToday, Yannick Petrilli removed 5 concrete
bars (5-9) from the ThomX housing roof in
order to let the optical table be installed
 IMG_20210517_105258.jpgIMG_20210517_111407.jpg 
  13   Thu Jun 10 16:55:37 2021 Ronic ChicheFixedinfomechanicsThomX iglooConnecting the optical table to the ThomX ringOn the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and
 Image1.jpgImage2.jpgImage3.png 
  14   Thu Jun 10 17:06:42 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationOn the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company.
  
  15   Thu Jun 10 17:45:09 2021 Ronic ChicheFixedinfomechanicsThomX iglooAirflow installationThe AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is
  
  16   Thu Oct 14 15:08:56 2021 Ronic ChicheFixedinfodetectors and electronics | utilitiesThomX iglooCleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuumThis morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the
  
  17   Thu Oct 14 18:12:39 2021 Ronic ChicheFixedinfodetectors and electronics | utilitiesThomX iglooCleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuumThis afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning
  
  18   Fri Oct 15 14:21:03 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambers
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before
 First_Level_Pump.jpgSecond_Level_Pump_Turpo_blades_Controlers.jpgInkedControl_Room_Gauge_Monitoring_screen.jpgInkedOptical_cavity_vacuum_control_Modules.jpg 
  19   Fri Oct 15 14:34:34 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambersthe ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a
  
  20   Fri Oct 15 17:57:54 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateThis afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers.
  
  21   Mon Oct 18 09:46:14 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateafter the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)

and the left vessel vacuum level
  
  22   Mon Oct 18 15:01:07 2021 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | softwareThomX iglooInstallation updateNow, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed).
  
  23   Mon Oct 18 15:15:26 2021 Manar AmerFixedreportcabling | softwareThomX iglooMotors Controler and Software
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown
 ConnectEthernetToDesignatedOutlet_marked.jpgMototControlerws.jpgPositionOnMoniter.jpeg 
  24   Tue Oct 19 10:43:42 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesThe pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest
  
  25   Tue Oct 19 11:06:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers 

At
10h45 in the morning, the pressure on the
 19102021_vacuum_pressure_on_mirrorsChambers.jpg 
  26   Tue Oct 19 12:46:40 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesReminding: the opening of the valves is
the responsibility of the vacuum group only.

  
  27   Tue Oct 19 16:38:31 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 15h30 in
the afternoon, the pressure on the mirror
chambers is:
 19102021_vacuum_pressure_on_mirrorsChambers_15h30.jpg 
  28   Wed Oct 20 10:51:29 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 10h in
the morning, the pressure on the mirror chambers
is:
 20102021_vacuum_pressure_on_mirrorsChambers_10h10.jpg 
  29   Thu Oct 21 09:45:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 9h30 in
the morning, the pressure on the mirror chambers
is:
 21102021_vacuum_pressure_on_mirrorsChambers_9h30.jpg 
  30   Thu Oct 21 18:31:11 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers Leckage TestLeakage test done in the afternoon.

The method :


an atomic mass spectrometer
 21102021_vacuum_pressure_on_mirrorsChambers_16h30.jpg21102121_MassSpectrometerOpticalCav.png 