  51   Wed Dec 20 10:17:19 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningfinally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS
  
  52   Wed Dec 20 12:59:00 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningI was able to lock back the FP-cavity.

at one moment, during the alignment
optmization process of the infection mirrors
  
  1   Mon Sep 30 16:32:31 2019 Ronic ChicheFixedissueutilitiesOptical roomChiller of the new laser amplifier We observed 2 issues for the chiller of
the new CELIA laser amplifier:


setting the water temperature
  
  2   Tue Oct 1 12:24:11 2019 Ronic ChicheFixedissueutilitiesOptical roomChiller of the new laser amplifier Today, the chiller worked at 17°C during
3 hours without error, no freezing nor flow
sensor error.
  
  3   Fri Nov 15 14:51:54 2019 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronicsOptical roomSmaract Controllers settingScheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP.
 Origami_OneFive_33MHz_laser_SmarAct_controllers_cabling.pdf 
  4   Tue Nov 19 17:55:20 2019 Ronic ChicheFixedissuemechanics | vacuumOptical roomNew valves cablingToday, Manu and Eric changed the cavity
valves pressure system to open and close
them.
  
  6   Wed Nov 20 14:52:45 2019 Loïc AmoudryFixedinfolasers and optics | vacuumOptical roomNew valve cabling and 30Hz noise PZTThe Pneumatic valves are still coming back
to "close" position.
Now the air bottle is always "open"
 Noise_with_all_flow_off.pngNoise_with_room_flow_on.pngNoise_30Hz.png 
  8   Wed Nov 27 09:48:44 2019 Ronic ChicheFixedinfocablingOptical roomnew circuit breaker for the UPSA new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too
  
  9   Wed Jul 1 17:00:18 2020 Ronic ChicheFixedreportmechanics | vacuumOptical roomEdge installation19/06/2020

The first part of the edge installation
was on done by Yann and Ronic
  
  10   Wed Feb 24 17:35:55 2021 Ronic ChicheFixedreportmechanics | vacuum | utilitiesOptical roomOperations before moving the optical tableOperations before moving the optical table
from the optical room to the Igloo.

— the cavity has been filled
  