51
Wed Dec 20 10:17:19 2023
Ronic Chiche
Fixed
info
cabling
ThomX igloo
UPS installation and commissioning
finally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS
52
Wed Dec 20 12:59:00 2023
Ronic Chiche
Fixed
info
cabling
ThomX igloo
UPS installation and commissioning
I was able to lock back the FP-cavity.
at one moment, during the alignment
optmization process of the infection mirrors
1
Mon Sep 30 16:32:31 2019
Ronic Chiche
Fixed
issue
utilities
Optical room
Chiller of the new laser amplifier
We observed 2 issues for the chiller of
the new CELIA laser amplifier:
setting the water temperature
2
Tue Oct 1 12:24:11 2019
Ronic Chiche
Fixed
issue
utilities
Optical room
Chiller of the new laser amplifier
Today, the chiller worked at 17°C during
3 hours without error, no freezing nor flow
sensor error.
3
Fri Nov 15 14:51:54 2019
Ronic Chiche
Fixed
info
mechanics | lasers and optics | detectors and electronics
Optical room
Smaract Controllers setting
Scheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP.
4
Tue Nov 19 17:55:20 2019
Ronic Chiche
Fixed
issue
mechanics | vacuum
Optical room
New valves cabling
Today, Manu and Eric changed the cavity
valves pressure system to open and close
them.
6
Wed Nov 20 14:52:45 2019
Loïc Amoudry
Fixed
info
lasers and optics | vacuum
Optical room
New valve cabling and 30Hz noise PZT
The Pneumatic valves are still coming back
to "close" position.
Now the air bottle is always "open"
8
Wed Nov 27 09:48:44 2019
Ronic Chiche
Fixed
info
cabling
Optical room
new circuit breaker for the UPS
A new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too
9
Wed Jul 1 17:00:18 2020
Ronic Chiche
Fixed
report
mechanics | vacuum
Optical room
Edge installation
19/06/2020
The first part of the edge installation
was on done by Yann and Ronic
10
Wed Feb 24 17:35:55 2021
Ronic Chiche
Fixed
report
mechanics | vacuum | utilities
Optical room
Operations before moving the optical table
Operations before moving the optical table
from the optical room to the Igloo.