| ID |
Date |
Author |
Status |
Type |
Category |
Location |
Title |
Text |
 |
|
1
|
Mon Sep 30 16:32:31 2019 |
Ronic Chiche | Fixed | issue | utilities | Optical room | Chiller of the new laser amplifier | We observed 2 issues for the chiller of
the new CELIA laser amplifier:
setting the water temperature |
|
|
2
|
Tue Oct 1 12:24:11 2019 |
Ronic Chiche | Fixed | issue | utilities | Optical room | Chiller of the new laser amplifier | Today, the chiller worked at 17°C during
3 hours without error, no freezing nor flow
sensor error. |
|
|
3
|
Fri Nov 15 14:51:54 2019 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | detectors and electronics | Optical room | Smaract Controllers setting | Scheme of cabling of the SmarAct motors
controllers for acting on Frep and CEP. |
|
|
4
|
Tue Nov 19 17:55:20 2019 |
Ronic Chiche | Fixed | issue | mechanics | vacuum | Optical room | New valves cabling | Today, Manu and Eric changed the cavity
valves pressure system to open and close
them. |
|
|
8
|
Wed Nov 27 09:48:44 2019 |
Ronic Chiche | Fixed | info | cabling | Optical room | new circuit breaker for the UPS | A new circuit breaker has been installed
today before the UPS to fix the shutdown
issues we observed some months ago when too |
|
|
9
|
Wed Jul 1 17:00:18 2020 |
Ronic Chiche | Fixed | report | mechanics | vacuum | Optical room | Edge installation | 19/06/2020
The first part of the edge installation
was on done by Yann and Ronic |
|
|
10
|
Wed Feb 24 17:35:55 2021 |
Ronic Chiche | Fixed | report | mechanics | vacuum | utilities | Optical room | Operations before moving the optical table | Operations before moving the optical table
from the optical room to the Igloo.
— the cavity has been filled |
|
|
11
|
Fri Feb 26 17:04:57 2021 |
Ronic Chiche | Fixed | report | mechanics | ThomX igloo | Moving the optical table to the Igloo | This morning the Bovis company moved the
optical table from the optical room to the
Igloo without any problem. |
9x |
|
12
|
Mon May 17 11:53:35 2021 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | ThomX housing roof opening | Today, Yannick Petrilli removed 5 concrete
bars (5-9) from the ThomX housing roof in
order to let the optical table be installed |
 |
|
13
|
Thu Jun 10 16:55:37 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Connecting the optical table to the ThomX ring | On the 19th of May, the optical table has
been moved inside the ThomX concrete housing
and connected to the Symetrie hexapod and |
  |
|
14
|
Thu Jun 10 17:06:42 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | On the 27th of May, the Airflow has been
dismounted from the optical room to be mounted
around the optical cavity by the AirC2 company. |
|
|
15
|
Thu Jun 10 17:45:09 2021 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Airflow installation | The AC plug and the power cord of the airflow
were quite hot because they have been dimensioned
for 16A current and the total current is |
|
|
16
|
Thu Oct 14 15:08:56 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This morning with Manar, we started to
clean the floor around the cavity, the outside
part of the panels of the housing, and the |
|
|
17
|
Thu Oct 14 18:12:39 2021 |
Ronic Chiche | Fixed | info | detectors and electronics | utilities | ThomX igloo | Cleaning, Motors Controllers mini-rack, hexapod controller, chiller and vacuum | This afternoon, we continued to clean the
housing with Manar and Daniele.
we did a dust measurement after cleaning |
|
|
20
|
Fri Oct 15 17:57:54 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | This afternoon with Manar, we finished
connecting FP-cavity mirrors motors and alignment
mirrors motors to their 3 ISP controllers. |
|
|
21
|
Mon Oct 18 09:46:14 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | after the WE, the right vessel vacuum level
is 1.7e-7 mbar (primary + turbo pumps)
and the left vessel vacuum level |
|
|
22
|
Mon Oct 18 15:01:07 2021 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | ThomX igloo | Installation update | Now, both vessels are pumped by an ionic
pump (both Turbo pumping entrances have been
closed). |
|
|
34
|
Thu Nov 4 12:42:38 2021 |
Ronic Chiche | Fixed | info | vacuum | ThomX igloo | Opening of the FP cavity valves | as the vacuum level was good enough, I
asked Eric Mistretta to open the 2 valves
of the FP cavity. |
|
|
35
|
Mon Nov 8 14:50:45 2021 |
Ronic Chiche | Fixed | info | vacuum | ThomX igloo | Opening of the FP cavity valves | On Friday the 5th of November, ThomX suffered
again from a power breakdown.
all the pumping systems had to |
|
|
39
|
Wed Jan 19 18:32:47 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | new power supplies connexions | this afternoon with Viktor, we redid all
the power supplies connexions.
4x cables are now connected to |
|