40
|
Thu Feb 10 09:41:54 2022 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | Power supplies switched off | This afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies. |
|
|
41
|
Thu Feb 10 15:08:41 2022 |
Ronic Chiche | Fixed | info | mechanics | lasers and optics | ThomX igloo | shutter base plate, L-shape arm and housing frame | This afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the |
|
|
42
|
Tue Mar 8 12:40:00 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on |
|
|
43
|
Wed Mar 9 10:51:59 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | - this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter. |
 |
|
44
|
Fri Mar 11 12:24:34 2022 |
Ronic Chiche | Fixed | info | mechanics | ThomX igloo | Chiller installation + interlock | This morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning. |
|
|
45
|
Thu Aug 25 16:43:01 2022 |
Ronic Chiche | Fixed | info | detectors and electronics | software | ThomX igloo | Scope and Desktop computer removing | this afternoon, because of the test on
the electron beam drive in the ring in the
next days, |
|
|
47
|
Wed Feb 8 11:02:38 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | If one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the |
|
|
48
|
Wed Feb 8 13:48:33 2023 |
Ronic Chiche | Fixed | info | utilities | ThomX igloo | Safety patrol instructions | after finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location |
|
|
49
|
Wed Jul 5 16:50:50 2023 |
Ronic Chiche | Fixed | issue | utilities | ThomX igloo | Airflow power breakdown | since around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on. |
|
|
50
|
Wed Dec 20 09:35:36 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | Jean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker |
|
|
51
|
Wed Dec 20 10:17:19 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | finally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS |
|
|
52
|
Wed Dec 20 12:59:00 2023 |
Ronic Chiche | Fixed | info | cabling | ThomX igloo | UPS installation and commissioning | I was able to lock back the FP-cavity.
at one moment, during the alignment
optmization process of the infection mirrors |
|
|
18
|
Fri Oct 15 14:21:03 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers |
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before |
   |
|
19
|
Fri Oct 15 14:34:34 2021 |
Manar Amer | Fixed | report | vacuum | cabling | software | ThomX igloo | Vacuum in the mirror chambers | the ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a |
|
|
23
|
Mon Oct 18 15:15:26 2021 |
Manar Amer | Fixed | report | cabling | software | ThomX igloo | Motors Controler and Software |
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown |
  |
|
24
|
Tue Oct 19 10:43:42 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | The pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest |
|
|
25
|
Tue Oct 19 11:06:03 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers |
At
10h45 in the morning, the pressure on the |
|
|
26
|
Tue Oct 19 12:46:40 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Vacuum pressure to open valves | Reminding: the opening of the valves is
the responsibility of the vacuum group only.
|
|
|
27
|
Tue Oct 19 16:38:31 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers | At 15h30 in
the afternoon, the pressure on the mirror
chambers is: |
|
|
28
|
Wed Oct 20 10:51:29 2021 |
Manar Amer | Fixed | info | vacuum | ThomX igloo | Pressure On mirror Chambers | At 10h in
the morning, the pressure on the mirror chambers
is: |
|