ID Date Authordown Status Type Category Location Title Text Attachments
  40   Thu Feb 10 09:41:54 2022 Ronic ChicheFixedinfocablingThomX iglooPower supplies switched offThis afternoon, an electrical operation
will be done in ThomX, impacting possibly
the casemate power supplies.
  
  41   Thu Feb 10 15:08:41 2022 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooshutter base plate, L-shape arm and housing frameThis afternoon with Yann:
- we changed the shutter base plate
position to center the beam axis with the
  
  42   Tue Mar 8 12:40:00 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning with Aurélien, we
filled the water tank of the chiller and
we opened the water valves (last pipes on
  
  43   Wed Mar 9 10:51:59 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlock- this morning the chiller leakage has
been fixed by adding some Teflon on the faulty
Swagelock adapter.
 IMG_20220309_093541.pngChiller_Sub-d15_pinout.jpg 
  44   Fri Mar 11 12:24:34 2022 Ronic ChicheFixedinfomechanicsThomX iglooChiller installation + interlockThis morning, I started the chiller and
opened the valves on the external water circuit
=> no water leakage during the morning.
  
  45   Thu Aug 25 16:43:01 2022 Ronic ChicheFixedinfodetectors and electronics | softwareThomX iglooScope and Desktop computer removingthis afternoon, because of the test on
the electron beam drive in the ring in the
next days,
  
  47   Wed Feb 8 11:02:38 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsIf one needs to work with 3rd stage on
the laser amplifier, one needs to make the
safety patrol inspection before closing the
 key_board.jpg 
  48   Wed Feb 8 13:48:33 2023 Ronic ChicheFixedinfoutilitiesThomX iglooSafety patrol instructionsafter finishing the controlled intervention,
you just have to exit the bunker with the
2 keys and place them back in their location
  
  49   Wed Jul 5 16:50:50 2023 Ronic ChicheFixedissueutilitiesThomX iglooAirflow power breakdownsince around 2 weeks, the airflow above
the optical table housing has a power breakdown
when one tries to switch it on.
  
  50   Wed Dec 20 09:35:36 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningJean-Noel Cayla installed several days
ago a Eaton 9PX 11kVA UPS inside the Igloo,
outside of the ThomX bunker
  
  51   Wed Dec 20 10:17:19 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningfinally I installed the OneFive laser,
the Smaract motors of the laser and the Arduino
Peltier controller of the laser on the UPS
  
  52   Wed Dec 20 12:59:00 2023 Ronic ChicheFixedinfocablingThomX iglooUPS installation and commissioningI was able to lock back the FP-cavity.

at one moment, during the alignment
optmization process of the infection mirrors
  
  18   Fri Oct 15 14:21:03 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambers
The electron ring has been vacuum
inside it, but the valves connecting it to
the two mirror chambers are closed. Before
 First_Level_Pump.jpgSecond_Level_Pump_Turpo_blades_Controlers.jpgInkedControl_Room_Gauge_Monitoring_screen.jpgInkedOptical_cavity_vacuum_control_Modules.jpg 
  19   Fri Oct 15 14:34:34 2021 Manar AmerFixedreportvacuum | cabling | softwareThomX iglooVacuum in the mirror chambersthe ionic pumps have been also connected
this morning but not powered on, yet.
the vacuum group is waiting for a
  
  23   Mon Oct 18 15:15:26 2021 Manar AmerFixedreportcabling | softwareThomX iglooMotors Controler and Software
When connecting
the Ethernet cable from the hub to the computer,
it must be connected to the correct one (shown
 ConnectEthernetToDesignatedOutlet_marked.jpgMototControlerws.jpgPositionOnMoniter.jpeg 
  24   Tue Oct 19 10:43:42 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesThe pressure for the mirror vacuum chambers
needs to be ~ few 10^-9 mbar for the valves
to be open to the electron ring (the rest
  
  25   Tue Oct 19 11:06:03 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror Chambers 

At
10h45 in the morning, the pressure on the
 19102021_vacuum_pressure_on_mirrorsChambers.jpg 
  26   Tue Oct 19 12:46:40 2021 Manar AmerFixedinfovacuumThomX iglooVacuum pressure to open valvesReminding: the opening of the valves is
the responsibility of the vacuum group only.

  
  27   Tue Oct 19 16:38:31 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 15h30 in
the afternoon, the pressure on the mirror
chambers is:
 19102021_vacuum_pressure_on_mirrorsChambers_15h30.jpg 
  28   Wed Oct 20 10:51:29 2021 Manar AmerFixedinfovacuumThomX iglooPressure On mirror ChambersAt 10h in
the morning, the pressure on the mirror chambers
is:
 20102021_vacuum_pressure_on_mirrorsChambers_10h10.jpg 