  Status of commissioning, report also here plots are reports., Page 8 of 24  Not logged in ELOG logo
ID Date Author Status Typedown Category Location Title Text Attachments
  435   Tue Jul 8 18:48:51 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlong run today at relatively
nominal power (~90kW) with double loop
(FPC + RF) between 13:30am and 6:30pm
 2025-07-08_-_long_run.png 
  461   Mon Dec 1 18:03:29 2025 Ronic ChicheFixedreportlasers and optics | detectors and electronicsThomX iglooNoise issuesince several days, we see that the locking
is more and more unstable and the lock duration
was sometime less than 20-30 seconds !
 2025-12-01_-_long_run_few_delocks.png 
  462   Wed Dec 3 16:23:40 2025 Ronic ChicheFixedreportlasers and optics | detectors and electronicsThomX iglooNoise issueyesterday, in the same conditions, we had
so many locking issues... exactly
in the same way than before. :-(
 Screenshot_2025-12-03_15-36-59.png 
  465   Wed Apr 22 09:52:40 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last Friday, we tried to increase the FP-cavity
power by just increasing the amplifier ratio
from 35% to 70%.
 8x 
  466   Mon Apr 27 16:55:15 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power today with Alice and Daniele,

we checked the distance of the
optical setup :
  
  467   Wed Apr 29 09:38:20 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power new power increase after alignment of the
waveplates and iris.

amplifier ratio (%) => FPC cavity
 Measured_data_v2.png 
  468   Wed Apr 29 15:31:06 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power I installed a stronger optical filter on
the reflection photodiode and loaded it on
1kOhms.
 Sans_titre.png 
  469   Mon May 18 11:33:46 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power this morning with Daniele, we set the amplifier
ratio to 33% => 97kW

then, we set the amplifier ratio
  
  470   Thu May 28 10:31:23 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last friday, with Daniele, we did some
realignement on the 2nd CVBG of the compressor
: the beam shape seems better, now.
  
  3   Tue Oct 2 16:23:54 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP * les vérins de 20mm (axe Z) ont
été testés sur table
grace à une rallonge SUB-C - DB9,
  
  4   Tue Oct 2 18:00:36 2018 Ronic ChicheFixedissuemechanics | cabling | softwareOptical roomtest des vérins ISP  




 CABLAGE_VERINS.pdf 
  19   Tue Mar 19 17:01:52 2019 Loïc AmoudryFixedissuemechanicsOptical roomMotors Z axis reversedS2 and S3 z-axis are initially at 1/4 (5mm/20mm) of
there range over ~20mm range. This is meant
to be able to spread them up to ~15mm in
  
  23   Thu Mar 28 09:25:58 2019 Loïc AmoudryFixedissuemechanicsOptical roomMotors Z axis reversedAll Z motors (for P1, S2, S3 and P4) have
been initialized again with a proper HOME
command with their own controller  with
  
  24   Fri Mar 29 18:33:15 2019 Ronic ChicheFixedissuemechanics | lasers and opticsOptical roomAlignment procedurewe did again the complete alignment procedure
starting with iris and optimizing injection
motors Ma and Mb, then installing mirror
  
  35   Thu Apr 18 16:17:53 2019 Loïc AmoudryFixedissuelasers and opticsOptical room33MHz Onefive power overtime decreasePower of the 33MHz Onfive decreases over
time. Have to pay attention to that.
Note that air dryers have never been
 180410_power_33mhz_1jours.PNG180925_Power.JPG190416_power_ouput_Onefive.PNG 
  47   Thu Jul 4 18:28:55 2019 Loïc AmoudryFixedissuelasers and opticsOptical roomOnefive 33MHz unmodelockedOscillator randomly unmodelocked on 3rd
july afternoon (during oscillator power
measurement, maybe a reflection from the
  
  52   Fri Aug 30 17:52:41 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem.
  
  53   Tue Sep 3 17:51:04 2019 Ronic ChicheFixedissuemechanics | lasers and optics | vacuumOptical roomVessel cleanlinesslooking in the vessel of the FP cavity
using a UV lamp shows a lot of dust... more
dust than outside the cavity !!!
 IMG_20190903_161910.jpg 
  59   Wed Sep 25 15:49:28 2019 Ronic ChicheFixedissuemechanics | detectors and electronicsOptical roomMotor issueToday again, same problem with axis 9 blocking
the controlling software during the mirror
alignment procedure.
  
  66   Thu Oct 3 14:00:13 2019 Loïc AmoudryFixedissuecablingOptical roomElectrical trouble (disjunction)The circuit breaker on ThomX cavity drops
@1.5-1.8kW when we turn on 1/2nd
stage of the amplifier or 3rd stage of the
  