383
|
Tue Nov 26 18:00:14 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | at the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP |
|
|
384
|
Wed Dec 4 12:26:03 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction |
|
|
385
|
Wed Dec 4 17:11:50 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | we observed that :
- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected |
|
|
386
|
Wed Dec 4 17:53:49 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | last thing we tried :
we removed the threshold on the
FPC/RF error signal. |
|
|
387
|
Wed Dec 11 18:51:35 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | This morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock. |
|
|
388
|
Thu Dec 12 18:28:02 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | major result of the day: X-ray vertical
scan by moving the hexapod
abscise : hexapod position |
|
|
389
|
Tue Dec 17 16:28:32 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors. |
|
|
390
|
Tue Jan 7 10:18:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the cavity after
the Christmas shutdown.
everything went fine. |
|
|
394
|
Thu Jan 23 17:55:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio. |
|
|
395
|
Thu Feb 6 10:29:36 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning, |
|
|
417
|
Tue Mar 18 11:25:07 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio. |
|
|
419
|
Mon Mar 31 17:12:56 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)... insead of the 00 |
|
|
421
|
Tue Apr 29 09:26:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations |
|
|
422
|
Fri May 2 10:05:43 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | The temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day. |
|
|
423
|
Tue May 6 09:29:43 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | after the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C |
|
|
424
|
Tue May 6 10:58:18 2025 |
Ronic Chiche | Under Process | report | lasers and optics | ThomX igloo | air conditionning in ThomX Bunker | I finally got 93-94kW for 33% amp ratio.
I had to move the FP-cavity length
to compensate the temperature change in the |
|
|
425
|
Wed May 14 09:50:52 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | Today, I removed the NKT oscillator from
the bunker to put it in the PLIC room.
I locked the FP cavity and obtained |
|
|
430
|
Wed Jun 25 18:48:28 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | New locking parameters (I got 98kW for
33% amp ratio) :
Axis 18 position : +0009420 |
|
|
433
|
Tue Jul 1 17:31:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | We had a long run without any lock loss
during ~1h with the 23kW recipie in the morning.
during the afternoon, we had some |
|
|
434
|
Tue Jul 8 18:45:17 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | long run yesterday at relatively low power
(~23kW) with double loop (FPC + RF) between
10am and 6pm |
|