  383   Tue Nov 26 18:00:14 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionat the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP
 Capture.JPG 
  384   Wed Dec 4 12:26:03 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction
  
  385   Wed Dec 4 17:11:50 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionwe observed that :

- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected
 20241204_125955.jpg 
  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  417   Tue Mar 18 11:25:07 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio.
  
  419   Mon Mar 31 17:12:56 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)...  insead of the 00
  
  421   Tue Apr 29 09:26:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, after 1 week of vacation, I was
able to easily lock the cavity with 92kW
with 33% amp ratio without too much optimizations
  
  422   Fri May 2 10:05:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerThe temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day.
 temp.png 
  423   Tue May 6 09:29:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX Bunkerafter the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C
 Sans_titre.png 
  424   Tue May 6 10:58:18 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerI finally got 93-94kW for 33% amp ratio.

I had to move the FP-cavity length
to compensate the temperature change in the
  
  425   Wed May 14 09:50:52 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionToday, I removed the NKT oscillator from
the bunker to put it in the PLIC room.

I locked the FP cavity and obtained
  
  430   Wed Jun 25 18:48:28 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionNew locking parameters (I got 98kW for
33% amp ratio) :

Axis 18 position : +0009420
  
  433   Tue Jul 1 17:31:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionWe had a long run without any lock loss
during ~1h with the 23kW recipie in the morning.
during the afternoon, we had some
  
  434   Tue Jul 8 18:45:17 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlong run yesterday at relatively low power
(~23kW) with double loop (FPC + RF) between
10am and 6pm
 2025-07-07_-_long_run.png 