Status of commissioning, report also here plots are reports., Page 2 of 24
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
461 Entries
Goto page
Previous
1
, 2,
3
...
22
,
23
,
24
Next
All
ID
Date
Author
Status
Type
Category
Location
Title
Text
37
Tue May 21 17:49:30 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Finesse after cleaning (new suprasil mirror)
15/05/19-20/05/19:
Cleaning of the mirrors:
Initial finesse 14000 @air
38
Thu May 23 10:10:56 2019
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Finesse measurement by decay time technique
5 Files attached:
- Note on the technique and results
for the present cavity on 2019, May 21th
39
Thu May 23 17:30:03 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Transmission of Sapphire mirror
See image.
40
Tue Jun 11 18:03:10 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics
Other
Amplifier mission Bordeaux
Voyage Bordeaux au CELIA avec Jérôme
LHERMITE (Loïc et Titoutan)
1er jour (34°) :
41
Wed Jun 12 12:07:11 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics
Other
Amplifier mission Bordeaux
M² mesuré à 10W.
M²x = 1.17
M²y = 1.14
48
Thu Jul 4 18:30:39 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
2nd stage output power validated
Onefive output power : 28mW
Power before fiber injection :
7.8mW
50
Fri Aug 30 09:44:56 2019
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Finesse measurement after mirror cleaning using the spin coater
Last Finesse measurement in air : ~ 17
000 the 20th of may (see logbook)
28th and 29th of august, we cleanned,
51
Fri Aug 30 17:46:15 2019
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Finesse measurement after mirror cleaning using the spin coater
today I cleaned S3 with isopropanol and
then with pure water on spin coater.
Finesse is only 10 700.(coupling 50%
54
Tue Sep 3 18:04:03 2019
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Finesse measurement after mirror cleaning using the spin coater
Following finesse measurements (start @10700):
Clean P1 with SC (water) + isoprop
(wipe) finesse @15000
56
Fri Sep 6 14:48:14 2019
Loïc Amoudry
Fixed
report
mechanics | vacuum
Optical room
Primary vacuum to check dust
The cavity has been cleaned then put under
primary vacuum (primary pump without vacuum
flow control). Dusts presence was checked
58
Thu Sep 12 16:19:26 2019
Loïc Amoudry
Fixed
report
mechanics | lasers and optics
Optical room
Cavity dust source check
Several experiments have been done in order
to check the potential source of dust in
the ThomX cavity. For each step, we look
60
Fri Sep 27 10:43:17 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
New Suprasil mirror from LMA
19/09/2019 : email from Chrisophe Michel
about AR coating of LMA mirrors after reading
that Ta2O5 layers can be damaged in vacuum
65
Thu Oct 3 13:53:44 2019
Loïc Amoudry
Fixed
report
vacuum
Optical room
Cavity under vacuum
The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are
67
Thu Oct 3 18:00:10 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
ThomX amplifier M2
The ThomX M2 has been measured between
1.5-1.6 for x and y
76
Tue Oct 22 09:10:45 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
First mode degeneracy on ThomX
Yesterday, we've observed the first
degeneracy on ThomX cavity at ~115 kW stored.
The shape of the stored power on the oscilloscope
77
Wed Nov 6 16:11:12 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Spherical mirrors at closest position. FSR, finesse and beam size.
The spherical mirrors are at the closest
position to get a FSR ~=33.3435 MHz. Planar
mirrors are at the largest position.
78
Wed Nov 13 14:44:56 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
The ouput power of the ThomX amplifier
has been measured as a function of the 3rd
stage pumps current (0A is 1st and 2nd stage
79
Wed Nov 13 15:05:18 2019
Loïc Amoudry
Fixed
report
lasers and optics
Optical room
Amplifier output power
88
Fri Feb 7 14:46:55 2020
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Beam pulse duration
We installed the 2 CVBG for compression
after the amplifier.
We used an interferometric technique
89
Wed Feb 12 17:43:43 2020
Ronic Chiche
Fixed
report
lasers and optics
Optical room
Beam pulse duration
Yesterday, Loic installed a telescope before
CVBG's to reduce the spot size on CVBG's
and reduced the incident angle 0.5-1°