  406   Tue Feb 18 17:36:25 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the acquisition from 10:30am to
5:30pm

11k point in 7h => 1.57k points
 Capture.JPG 
  407   Tue Feb 18 19:33:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzhere is the same kind of measurement (pk-pk
of 1 sec of acquisition) done on the laser
PZT when the FP is at 90kW.
 Capture.JPG 
  408   Wed Feb 19 09:28:12 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzlong term pk-pk measurement of the accelerometer
(placed on the optical cavity table, on the
marble part close to the laser oscillator)
 Capture.JPG 
  409   Wed Feb 19 10:35:06 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed the accelerometer on the ground
close to one feet of the FP cavity hexapod
(see picture) and restarted the acquisition
 img1.jpgCapture.JPGCapture.JPGCapture.JPG 
  410   Thu Feb 20 12:36:19 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 94kW in the FP cavity,
always with the same parameter : 33% laser
 img1.jpg 
  411   Fri Feb 21 10:13:03 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzfor this 20Hz oscillation, could it be
a natural resonance of the optical table
placed on its feet ?
  
  413   Fri Feb 21 19:52:57 2025 Ronic ChicheFixedinfomechanics | lasers and optics | detectors and electronics | softwareThomX iglooGood Xrays production trendthis afternoon, we succeeded to get a quite
long Xray production trend around 15-20 minutes
with a flux above 25k on i1.
 img1(1).jpg 
  414   Tue Mar 4 14:54:31 2025 Ronic ChicheFixedinfomechanics | softwareThomX iglooNew direction for cavity motorsfrom now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project.
  
  415   Wed Mar 5 13:17:26 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementwe installed a measurement at the IP with
the BPM for ion cleaning for electrons and
we used a fast photodiode at the output of
 img1(1).jpg 
  416   Wed Mar 5 15:08:38 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooElectrons-Photons phase stability measurementthe phase between the 500Mhz ring RF oscillator
and the electrons is measured on a BPM and
is very stable after 2-3ms (<< 6ps,
  
  418   Tue Mar 18 11:45:21 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able to store more than
95kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(2).jpg 
  420   Mon Mar 31 18:19:30 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser
 20250331_181029.jpg 
  426   Wed Jun 11 11:35:22 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX igloo33MHz phase adjustmentthe 33MHz beating signal (phase) is used
to start and stop automatically the lock
on the 500MHz beating signal.
  
  428   Wed Jun 25 09:43:36 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavityyesterday, we were able to store more than
98kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(3).jpg 
  431   Thu Jun 26 12:37:22 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 46kW power in the FP-cavity:


Alplhanov amplifier ratio
: 20%
  
  432   Tue Jul 1 12:13:18 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 23kW power in the FP-cavity:


Alplhanov amplifier ratio
: 15%
  
  436   Wed Jul 9 14:12:54 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC power

For ~ 66kW power in the
FP-cavity:
  
  437   Wed Jul 9 16:27:18 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloooptical attenuator added on the diffuser + new PID parametersToday we did several long runs (~1h each)
at ~23kW, 46kW, 66kW with different PID parameters
which seems better.
  
  438   Wed Jul 9 17:20:01 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX iglooNew recipies with additionnal attenuation before the diffuserWith optical attenuation
only

For ~ 92kW power in the
  
  439   Wed Jul 9 18:11:59 2025 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloolong run to test the appearance of high frequency noiseToday with Daniele, we did 6 long runs
at different power (23kW, 46kW, 66kW, 73kW,
92kW, 92kW)
 long_run_with_different_FPC_power.png 