472
Thu Jun 11 11:16:55 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
this morning, with Daniele, we took some
images of the M1 mirror HR surface :
1- large image span of the mirror
6x
473
Thu Jun 11 17:11:02 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
This afternoon, we installed a new M1 mirror,
the only one for which the box was not already
opened.
474
Thu Jun 25 16:04:34 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
the pressure level with the ionic pump
was limited to ~ 1.5 .10**-7 mbar after several
days of pumping, due to some leakage located
475
Fri Jun 26 09:42:31 2026
Ronic Chiche
Under Process
info
mechanics | lasers and optics | vacuum
ThomX igloo
removing of the M1 mirror
this morning, the vacuum level is still
around 1.9 10**-7.
the vacuum guys said that last