HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 7 of 24  Not logged in ELOG logo
Entry   Motor issue, posted by Ronic Chiche at Optical room about mechanics | detectors and electronics 
Today, Axis 9 (Z-axis of P1) has blocked the software which drives all the motors.
impossible to bypass the problem.

I had to :
Entry   Vessel cleanliness, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | vacuum IMG_20190903_161910.jpg
looking in the vessel of the FP cavity using a UV lamp shows a lot of dust... more dust than outside the cavity !!!

here is picture where one can see a cleaned zone using a finger (with gloves).

question : where does come from this dust ?
    Reply   Finesse measurement after mirror cleaning using the spin coater, posted by Ronic Chiche at Optical room about lasers and optics 
Following finesse measurements (start @10700): 
Clean P1 with SC (water) + isoprop (wipe) finesse @15000
Clean S2 with SC (water) + isoprop (wipe) finesse @13000
Entry   Mirrors sent to LMA, posted by Loïc Amoudry at Optical room about lasers and optics 
Mirrors have been sent today to LMA for cleaning and maybe annealing (recuit). 3 ULE of ThomX and the fused silicate for injection (trans @140ppm ).
Entry   Primary vacuum to check dust, posted by Loïc Amoudry at Optical room about mechanics | vacuum Image3.jpgImage6.jpg
The cavity has been cleaned then put under primary vacuum (primary pump without vacuum flow control). Dusts presence was checked at air and no significant
changes have been observed.

1ST image before cleaning
Entry   LMA cleaning technique, posted by Loïc Amoudry at Optical room about lasers and optics 
Christophe MICHEL told us more precise informations about spin coater cleaning.

They always clean with pur water and cotton tipped sticks.
First a spray of water, then they put the wet cotton tipped sitck onto the mirror from the center to the edge ~x3 while continuing to spread
Entry   Cavity dust source check, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics 
Several experiments have been done in order to check the potential source of dust in the ThomX cavity. For each step, we look at a clean surface, put
the cavity under vacuum, go back at ambient pressure and check back the "clean surface".

1st: Primary pump on
    Reply   Motor issue, posted by Ronic Chiche at Optical room about mechanics | detectors and electronics 
Today again, same problem with axis 9 blocking the controlling software during the mirror alignment procedure.

after opening the motor 9-16 controlling crate, we saw 2 screws (RX- and TX+ of the controller) which were badly screwed.

we firmly screwed them... could it be the cause ?
    Reply   New Suprasil mirror from LMA, posted by Loïc Amoudry at Optical room about lasers and optics 
19/09/2019 : email from Chrisophe Michel about AR coating of LMA mirrors after reading that Ta2O5 layers can be damaged in vacuum if not protected by
a SiO2 layer :

"oui tous nos coating standards HR se terminent par une couche de protection SiO2 Lambda/2.
Entry   Finesse measurement, posted by Ronic Chiche at Optical room about lasers and optics 
After mirrors were going back from LMA for cleaning and thermal anealing, they have been installed in FP cavity for Finesse measurement.

after getting strange results when the cavity is closed (very low Finesse...maybe too much ethanol inside cavity procucing some lineic losses),
we get 12k-12k5 Finesse with primary vacuum (~4 mbar) and a clean lock (very flat transmission signal and quite noiseless reflection signal)
Entry   Diffusion ULE spherical mirror (S3) vs Fused Silicate injection planar mirror (P1), posted by Loïc Amoudry at Optical room about lasers and optics diffusion.jpg
Observation made with IR Beam Viewer: 

The observation of P1 and S3 simultaneously while locking shows much higher diffusion on the ULE mirror. The diffusion on the two other ULE mirrors
(S2 and P4) shows similar diffusion as S3.
    Reply   Finesse measurement, posted by Ronic Chiche at Optical room about lasers and optics 
To complete these observations:

Finesse has been measured on thursday, right after cleaning the cavity with ethanol @6000.
Finesse has been measured on friday, after opening the cavity for few tens of minutes @12000-12500. The cavity was openned while
Entry   Pneumatic valves, posted by Loïc Amoudry at Optical room about mechanics 
Frederic and Manu from vacuum group came this morning to fix again the pneumatic valves which had a leak again.
Entry   Cavity under vacuum , posted by Loïc Amoudry at Optical room about vacuum 
The cavity is right now at 6.5e-8 mbar (turbo pumps on for 1 night and ionic pumps for 3h), primary pumps and turbo pumps are cut, ionic pump are on
and the pressure level is still going down. 
Therefore there aren't any big leak in the cavity and we can expect a final vacuum level close to e-9 mbar.
Entry   Electrical trouble (disjunction), posted by Loïc Amoudry at Optical room about cabling 
The circuit breaker on ThomX cavity drops @1.5-1.8kW when we turn on 1/2nd stage of the amplifier or 3rd stage of the amplifier.
Amplifiers are now connected to K-BOX UPS.

We are buying a clamp ammeter for further investigations.
Entry   ThomX amplifier M2, posted by Loïc Amoudry at Optical room about lasers and optics Fit_matlab_M2.PNG
The ThomX M2 has been measured between 1.5-1.6 for x and y
Entry   Improvement holder amplifier fiber, posted by Loïc Amoudry at Optical room about lasers and optics 1.png2.png
We've added a clamp in the 3rd stage to prevent the pump fiber from moving and tilting (it was tilting to the left).
Entry   Free Spectral Range (FSR), posted by Loïc Amoudry at Optical room about lasers and optics 
FSR is 33.347 MHz @1e-8 mbar

 
Entry   Fiber injection and onefive output power, posted by Loïc Amoudry at Optical room about lasers and optics 
Fiber injection is finished with the new ThomX stretching CVBG in double pass (+50% injection power compared to K-BOX CVBG in simple pass).

- Output Onefive: 27 mW
- After Onefive + lambda/2 + isolator: 25.8 mW
Entry   Onefive spectrum and CVBG spectrum, posted by Loïc Amoudry at Optical room about lasers and optics 191008_spectrumbeforecvbg.PNG191008_spectrumaftercvbg.PNG191008_beamshapeaftercvbgthomx.PNG
The Onefive spectrum has shifted a little bit to lower lambda. It's still enough for the experiment (3mW injection of ampli intead of 1mW needed).
ELOG V3.1.4-395e101