    Reply   Checking the amplifier power, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
I put back and aligned the 1/2 waveplate only and I get 71kW max after its optimization and optimizing the CEP and alignment (without walking procedure).
this waveplate change a lot the reflected power seen on the CH2 of the scope.

to be continued this afternoon...
    Reply   Checking the amplifier power, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
this afternoon, we put back the 1/4 and 1/2 waveplates and after a long alignment/angle tuning/CEP optimization process, we hardly got 80-81kW in the
cavity for 33% amplifier ratio. the transmission photodiode is then ~ 7.5 divisions (500mV/division) on the scope.

BUT during the 1/2 and 1/4 waveplate angle tuning process, we clearly saw:
Entry   correlations between vacuum gauges and lock losses @ 20Hz, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | vacuum 
the machine people saw a correlation between BPM jumps and vacuum gauges peaks related to breakdowns in the beam pipe.

these breakdowns could produce some accoustic noise which could be related to our lock losses.

=> we tried to do a corrrelation between our lock losses and the vacuum gauge peaks => WE DON'T SEE any correlation !!!
Entry   New power record in ThomX cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics img1.jpg
today, we were able to store more than 93kW in the FP cavity, always with the same parameter : 33% laser amplifier ratio
    Reply   New power record in ThomX cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics img1.jpg
today, we were able to store more than 94kW in the FP cavity, always with the same parameter : 33% laser amplifier ratio




Ronic
Chiche wrote:



today, we were able to store more than 93kW in the FP cavity, always
Entry   strange drift (new effect !?!), posted by Ronic Chiche at ThomX igloo about software 
today, we had a strange effect :
both the laser and the FP cavity were locked on the RF frequency (500.10045 MHz), and we were producing X-rays but with a slowing (several seconds)
fluctuation exactly as the electrons-photons phase was drifting and the fluctuation can goes to 0 Xrays produced even at the "right" phase.
Entry   Good Xrays production trend, posted by Ronic Chiche at ThomX igloo about mechanics | lasers and optics | detectors and electronics | software img1(1).jpg
this afternoon, we succeeded to get a quite long Xray production trend around 15-20 minutes with a flux above 25k on i1.
Entry   New direction for cavity motors, posted by Ronic Chiche at ThomX igloo about mechanics | software 
from now on, one reverts the FP cavity motors direction to compensate the long drift from the begining of the project.
the motor MOT.06 will be used for the upward direction (presently -1 082 650 steps)
and the motor MOT.03 will be used for the downward direction (presently +37 170 steps)
Entry   Electrons-Photons phase stability measurement, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics img1(1).jpg
we installed a measurement at the IP with the BPM for ion cleaning for electrons and we used a fast photodiode at the output of the FP-cavity and measured
with a fast oscilloscope the phase jitter between the 2 signals.
in red, the BPM signal
    Reply   Electrons-Photons phase stability measurement, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
the phase between the 500Mhz ring RF oscillator and the electrons is measured on a BPM and is very stable after 2-3ms (<< 6ps, typically) !

in the same time, we can use the residual phase beating after our 500MHz mixer to estimate the phase noise coming from the laser part.
the rms noise of this signal is around 60mV for 1.25V peak (2.5 pk-pk) signal => ~ 50mrad rms
    Reply   New power record in ThomX cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics img1(2).jpg
today, we were able to store more than 95kW in the FP cavity, always with the same parameter : 33% laser amplifier ratio




Ronic
Chiche wrote:



today, we were able to store more than 94kW in
    Reply   New power record in ThomX cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics 20250331_181029.jpg
today, we were able to store more than 97kW in the FP cavity, always with the same parameter : 33% laser amplifier ratio




Ronic
Chiche wrote:



today, we were able to store more than 95kW in the FP cavity, always
Entry   33MHz phase adjustment, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics | software 
the 33MHz beating signal (phase) is used to start and stop automatically the lock on the 500MHz beating signal.

this 33MHz beating phase has a fixed range (typically +/-0.5V), so it is important to center this beating phase in the middle of its own range
when the 500MHz signal is locked
    Reply   New power record in ThomX cavity, posted by Ronic Chiche at ThomX igloo about lasers and optics img1(3).jpg
yesterday, we were able to store more than 98kW in the FP cavity, always with the same parameter : 33% laser amplifier ratio




Ronic
Chiche wrote:



today, we were able to store more than 97kW in
Entry   Recipies for different FPC power, posted by Ronic Chiche at ThomX igloo about lasers and optics 
For ~ 46kW power in the FP-cavity:


Alplhanov amplifier ratio : 20%
 
Axis 18 position : -0004710 steps
    Reply   Recipies for different FPC power, posted by Ronic Chiche at ThomX igloo about lasers and optics 
For ~ 23kW power in the FP-cavity:


Alplhanov amplifier ratio : 15%
 
Axis 18 position : -0016014 steps
    Reply   Recipies for different FPC power, posted by Ronic Chiche at ThomX igloo about lasers and optics 


For ~ 66kW power in the FP-cavity:


Alplhanov amplifier ratio : 25%
Entry   optical attenuator added on the diffuser + new PID parameters, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
Today we did several long runs (~1h each) at ~23kW, 46kW, 66kW with different PID parameters which seems better.

P = 0.1
I  = 0.0015
Entry   New recipies with additionnal attenuation before the diffuser, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics 
With optical attenuation only

For ~ 92kW power in the FP-cavity:


Alplhanov amplifier ratio : 33%
Entry   long run to test the appearance of high frequency noise, posted by Ronic Chiche at ThomX igloo about lasers and optics | detectors and electronics long_run_with_different_FPC_power.png
Today with Daniele, we did 6 long runs at different power (23kW, 46kW, 66kW, 73kW, 92kW, 92kW)

All the lock loss in between these several runs are due to FPC locking parameters change.
most of the few lock losses during the stable power duration, are due to 20Hz oscillation noise or because we forgot to center properly the PZT
ELOG V3.1.4-395e101