361
|
Fri Sep 6 17:27:20 2024 |
Ronic Chiche | Under Process | issue | mechanics | lasers and optics | detectors and electronics | ThomX igloo | 20Hz oscillation in the locking between Laser and FP-cavity | could it be possible this 20Hz oscillations comes from anouncements in the bunker, puting the housing+table in vibration ?
(there are such anouncements during restricted access) => to be asked to Harold
| Ronic Chiche wrote: |
|
measure to be done next week to check the 20Hz noise on the laser amplifier signal:
- install a DET10 in reflection of the FP-cavity to get a high BW and measure the 500MHz harmonic.
- do the beating with the 500MHz Ring RF generator
- with the laser motor try to be close to the 500MHz Ring RF frequency => beating frequency below 1kHz
- send the beating signal to some RF spectrum analyzer to use its large dynamic range.
for example, with the Siglent RF spectrum analyzer, it is possible to detect easily a peak @ -96dBm <=> 3.5µV rms
so, one should be able to make the measurement @ 500MHz or even @ 33MHz even if the phase sensitivity is lower :
for example V0=100mV peak beating signal @ f0=33MHz should produce a 20Hz noise signal of:
dV ~ V0 * dphi = V0 * 2*pi*f0*dt = 200µV rms with jitter dt=10ps rms
| Ronic Chiche wrote: |
|
what does this 10ps phase jitter mean in term of cavity length variations ?
L = L0 + dL sin(2pi fm t) = L0 (1 + dL/L0 sin(2pi fm t))
F = c / L ~ F0 - F0² dL / c sin(2pi fm t) with F0 = c / L0
d/dt(phi) = 2pi F => phi = 2pi F0 t + F0² dL / (c fm) cos(2pi fm t) => dphi = F0² dL / (c fm)
dphi = 2pi F0 dt => dL = L0 * 2pi fm dt
dt rms = 10ps @ fm = 20Hz of modulation frequency <=> dL rms = 10 nm (L0 = 9m)
| Ronic Chiche wrote: |
|
yesterday I did 2 tests to try to understand the origin of the 20Hz oscillation which is dominant in the remaining 10-20ps rms jitter between the transmitted pulses and the RF reference generator.
10ps rms jitter is equivalent to phase jitter dphi = 2*pi*f0*dt = 2mrad rms @ 33MHz or 30mrad rms @ 500MHz.
with V0 = 1Vpeak of beating signal amplitude, the equivalent rms beating voltage is dV = V0 * sin(dphi) ~ V0 * dphi = 2mV rms @ 33MHz or 30mV rms @ 500MHz
1) I did a beating between the internal photodiode of the laser with an external 33MHz oscillator (the photodiode is too slow to use higher harmonic).
the difficult part is to see the 2mV rms noise on a 2Vpp oscillating signal, so I locked the external 33MHz reference oscillator with the beating signal => see first plot.
there is no trace of 20Hz oscillation in the beating signal => the lock is too good and removed the oscillation ?
2) I did a beating between the photodiode in reflection of the FP-cavity (so the signal is not coming only from the oscillator but is going also through the Alphanov amplifier) with the 500MHz RF Ring generator.
I cannot the lock the generator anymore, so the measurement is done in open loop. I adjust the laser Frep with the motor to try to cancel the beating frequency => see 2nd plot
there is no trace of 20Hz oscillation in the beating signal => it is in contradiction with the previous post : "conclusion: the 20Hz oscillation is coming from the laser cavity" ?!?
maybe we need a more complex measurement scheme with the possibility to measure in the same time the 10-20ps rms jitter coming from the locked FP-cavity transmitted signal/500MHz Ring generator
AND the beating signal between the laser or amplifier with 500MHz local reference generator... to be done...
| Ronic Chiche wrote: |
|
this afternoon, we did 2 tests to better understand this 20Hz oscillation:
- we locked the amplified laser directly to the 500MHz ring reference oscillator, without any intermediate locking to the FP-cavity => no change
the 20Hz oscillation is still present in the correction signal of the laser PZT.
- we switched OFF the controller of the hexapod => no change.
conclusion:
the 20Hz oscillation is coming from the laser cavity
or is coming from "outside" and could be measured, maybe at a higher level, with an external "noises & vibrations measurement system".
| Ronic Chiche wrote: |
|
this morning, we tried to find the origin of the 20Hz oscillation.
- we switched OFF the laser Smaract motors controller => no change
- then, we addionally disconnected the FP-cavity PZT cable from the Laselock (we put a charge of 1kohm) => no change
- then, we switched ON the laser Smaract motors controller and switched OFF the FP-cavity motors controllers => no change
in conclusion, we don't really know where this instabillity comes from.
the amplitude is roughly 1Vpp (when the oscillation is at its maximum) on the laser PZT <=> length oscillation of ~20nm pp
could it come :
- from the air cooling regulation with pressure variation ?
- from vibrations of the hexapod below the table ?
or is it from inside of the laser or FP cavities ?
see these posts for the first measurements on this issue: https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/257
|
|
|
|
|
|
|
382
|
Fri Nov 22 10:23:33 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
383
|
Tue Nov 26 18:00:14 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
| Attachment 1: Capture.JPG
|  |
|
384
|
Wed Dec 4 12:26:03 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
385
|
Wed Dec 4 17:11:50 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see "peaks" in the picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
| Attachment 1: 20241204_125955.jpg
|  |
|
386
|
Wed Dec 4 17:53:49 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
387
|
Wed Dec 11 18:51:35 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
| Attachment 1: Capture.JPG
|  |
|
388
|
Thu Dec 12 18:28:02 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | major result of the day: X-ray vertical scan by moving the hexapod
abscise : hexapod position
ordinate : xray flux in asynchronous condition
red curve : continuous injection at 10Hz (the scan lasts for ~5 minutes)
green curve : one single injection (the beam is not extracted).
blue curve : one single injection, ~ 10-15 minutes later
| Ronic Chiche wrote: |
|
This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
|
| Attachment 1: Capture.JPG
|  |
|
389
|
Tue Dec 17 16:28:32 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, Kevin reduced the steering current in the IcePap controllers of the FP cavity motors.
the motor MOT.06 was producing a pattern in the Transmission signal when it was moved and doing a lock loss very often.
so, we changed its current from 0.8A to 0.4A and it fixes the problem => no more systematic lock loss.
so, we changed also the MOT.03 steering current from 0.8A to 0.7A.
on this motor, we have also a false warning about the Low limit switch which seems to be activated (strange because, we are always using it in the positive direction)
Kevin reverted the logic to remove the message.
we obtained 91kW in the FPC for 33% amplifier ratio after CEP and alignment tuning.
we did synchronized xray production with a relative delay between laser 33MHz and trigger (CH2-CH4) of +4 ns
| Ronic Chiche wrote: |
|
major result of the day: X-ray vertical scan by moving the hexapod
abscise : hexapod position
ordinate : xray flux in asynchronous condition
red curve : continuous injection at 10Hz (the scan lasts for ~5 minutes)
green curve : one single injection (the beam is not extracted).
blue curve : one single injection, ~ 10-15 minutes later
| Ronic Chiche wrote: |
|
This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
|
|
|
390
|
Tue Jan 7 10:18:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the cavity after the Christmas shutdown.
everything went fine.
I got ~ 86kW for 33% laser amplifier ratio after optimization of the CEP and alignment with walking procedure.
IcePap controllers are OK and the displacements (MOT.03 and MOT.06) let the CFP locked.
I locked also on the RF frequency (I tuned the laser and CFP cavity length) => +4.1ns (C2-C4) between the 10Hz trig (C2) and the 33MHz laser signal (C4)
I observed that the search & relock range on the regulator B plays an important role on the RF locking stability.
so, I increased the previous range +/-0.25V to +/-0.5V.
we have always the 20Hz noise which can be increasing some time but the lock seems more robust.
| Ronic Chiche wrote: |
|
this morning, Kevin reduced the steering current in the IcePap controllers of the FP cavity motors.
the motor MOT.06 was producing a pattern in the Transmission signal when it was moved and doing a lock loss very often.
so, we changed its current from 0.8A to 0.4A and it fixes the problem => no more systematic lock loss.
so, we changed also the MOT.03 steering current from 0.8A to 0.7A.
on this motor, we have also a false warning about the Low limit switch which seems to be activated (strange because, we are always using it in the positive direction)
Kevin reverted the logic to remove the message.
we obtained 91kW in the FPC for 33% amplifier ratio after CEP and alignment tuning.
we did synchronized xray production with a relative delay between laser 33MHz and trigger (CH2-CH4) of +4 ns
| Ronic Chiche wrote: |
|
major result of the day: X-ray vertical scan by moving the hexapod
abscise : hexapod position
ordinate : xray flux in asynchronous condition
red curve : continuous injection at 10Hz (the scan lasts for ~5 minutes)
green curve : one single injection (the beam is not extracted).
blue curve : one single injection, ~ 10-15 minutes later
| Ronic Chiche wrote: |
|
This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
|
|
|
|
394
|
Thu Jan 23 17:55:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today we did x-rays => we got 41 000 pA at maximum and 90kW in the FPC for 33% amplifier ratio.
finally, I changed the strategy for the feeback on RF.
i removed the integration and derivative parameters and reduced the gain parameter :
P=0.25 / I=D=0 => it seems to be more stable => less low frequency oscillations becoming larger and larger during a perturbation.
| Ronic Chiche wrote: |
|
this morning, I restarted the cavity after the Christmas shutdown.
everything went fine.
I got ~ 86kW for 33% laser amplifier ratio after optimization of the CEP and alignment with walking procedure.
IcePap controllers are OK and the displacements (MOT.03 and MOT.06) let the CFP locked.
I locked also on the RF frequency (I tuned the laser and CFP cavity length) => +4.1ns (C2-C4) between the 10Hz trig (C2) and the 33MHz laser signal (C4)
I observed that the search & relock range on the regulator B plays an important role on the RF locking stability.
so, I increased the previous range +/-0.25V to +/-0.5V.
we have always the 20Hz noise which can be increasing some time but the lock seems more robust.
| Ronic Chiche wrote: |
|
this morning, Kevin reduced the steering current in the IcePap controllers of the FP cavity motors.
the motor MOT.06 was producing a pattern in the Transmission signal when it was moved and doing a lock loss very often.
so, we changed its current from 0.8A to 0.4A and it fixes the problem => no more systematic lock loss.
so, we changed also the MOT.03 steering current from 0.8A to 0.7A.
on this motor, we have also a false warning about the Low limit switch which seems to be activated (strange because, we are always using it in the positive direction)
Kevin reverted the logic to remove the message.
we obtained 91kW in the FPC for 33% amplifier ratio after CEP and alignment tuning.
we did synchronized xray production with a relative delay between laser 33MHz and trigger (CH2-CH4) of +4 ns
| Ronic Chiche wrote: |
|
major result of the day: X-ray vertical scan by moving the hexapod
abscise : hexapod position
ordinate : xray flux in asynchronous condition
red curve : continuous injection at 10Hz (the scan lasts for ~5 minutes)
green curve : one single injection (the beam is not extracted).
blue curve : one single injection, ~ 10-15 minutes later
| Ronic Chiche wrote: |
|
This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
|
|
|
|
|
395
|
Thu Feb 6 10:29:36 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the lock of the CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning, I got 88kW for 33% ratio for the laser amplifier.
the FPC seems pretty far from the RF frequency (2.8kHz @ 33MHz) but it's possible the present RF frequency has been tuned for 61.5 or 70MeV (the present FPC length is tuned for 50MeV).
Jean-Noel had to reinject some SF6 gas in the section pipe => it immediately produces some lock losses during the whole filling process and even several minutes after he finishes.
this is an interesting correlation with the vibrations from the beam pipe => one needs to install the accelerometer to check the behavior.
but the lock losses were not related to "high frequency" or "20Hz oscillations" noises which are the 2 main processes for lock losses, it was just like some "cuts" in the signals.
I finally got 90kW in the FPC for 33% ratio for the laser amplifier after walking alignment procedure.
| Ronic Chiche wrote: |
|
today we did x-rays => we got 41 000 pA at maximum and 90kW in the FPC for 33% amplifier ratio.
finally, I changed the strategy for the feeback on RF.
i removed the integration and derivative parameters and reduced the gain parameter :
P=0.25 / I=D=0 => it seems to be more stable => less low frequency oscillations becoming larger and larger during a perturbation.
| Ronic Chiche wrote: |
|
this morning, I restarted the cavity after the Christmas shutdown.
everything went fine.
I got ~ 86kW for 33% laser amplifier ratio after optimization of the CEP and alignment with walking procedure.
IcePap controllers are OK and the displacements (MOT.03 and MOT.06) let the CFP locked.
I locked also on the RF frequency (I tuned the laser and CFP cavity length) => +4.1ns (C2-C4) between the 10Hz trig (C2) and the 33MHz laser signal (C4)
I observed that the search & relock range on the regulator B plays an important role on the RF locking stability.
so, I increased the previous range +/-0.25V to +/-0.5V.
we have always the 20Hz noise which can be increasing some time but the lock seems more robust.
| Ronic Chiche wrote: |
|
this morning, Kevin reduced the steering current in the IcePap controllers of the FP cavity motors.
the motor MOT.06 was producing a pattern in the Transmission signal when it was moved and doing a lock loss very often.
so, we changed its current from 0.8A to 0.4A and it fixes the problem => no more systematic lock loss.
so, we changed also the MOT.03 steering current from 0.8A to 0.7A.
on this motor, we have also a false warning about the Low limit switch which seems to be activated (strange because, we are always using it in the positive direction)
Kevin reverted the logic to remove the message.
we obtained 91kW in the FPC for 33% amplifier ratio after CEP and alignment tuning.
we did synchronized xray production with a relative delay between laser 33MHz and trigger (CH2-CH4) of +4 ns
| Ronic Chiche wrote: |
|
major result of the day: X-ray vertical scan by moving the hexapod
abscise : hexapod position
ordinate : xray flux in asynchronous condition
red curve : continuous injection at 10Hz (the scan lasts for ~5 minutes)
green curve : one single injection (the beam is not extracted).
blue curve : one single injection, ~ 10-15 minutes later
| Ronic Chiche wrote: |
|
This morning, I added an amplifier on the 33MHz beating signal in between the mixer+LPF and the scope/Laselock.
it seems to improve the robustness of the RF/FPC lock.
because of this gain, I increased the upper and lower thresholds on the search criterion of the RF/FPC lock from +/-50mV to +250mV/-200mV
=> see the picture of the Laselock parameters.
the optimum phase for X-ray production is roughly +3.6ns between C2 (machine trigger) and C4 (33MHz laser signal).
we have to use the machine at 70MeV with a new frequency at 500.0325MHz / 33.3355MHz.
=> we need to move the FPC tomorrow by roughly 60kHz @ 500MHz.
| Ronic Chiche wrote: |
|
last thing we tried :
we removed the threshold on the FPC/RF error signal.
=> we cannot choose automatically the RF bucket anymore (we need to manually let the phase drift slowly and start the lock at the right moment).
=> but the FPC/RF lock seems more robust.
in that case, we have 2 different sources of lock losses:
- the ones dues to the laser or CFP motors move.
even at low speed or in "piezo scan" mode, one observes too fast mouvement that are not properly compensated and involving some phase shift.
- the ones not related to any action.
=> the 20Hz signal seems to increase until it makes the system losing the lock
| Ronic Chiche wrote: |
|
we observed that :
- the MOT.03 motor always exhibits some perturbations on the transmitted, reflected and PZT signals (see picture) in contrary to the MOT.06 motor.
does the differences come from the motor relative positions (-900 000 steps for MOT.06 and -100 000 steps for MOT.03) or from the controller configuration ?
- the stability limits (oscillations arise) of the PID for the RF/CFP locks are P = 1 / I = 0.0001 / D = 5
then we put the new PID parameters : P = 0.25 / I = 0.000025 / D = 1
- the 20Hz oscillations are stil arising from time to time
- the lock laser/CFP is pretty robust, one observes more RF/CFP lock losses.
- we removed the 250Hz filter on the RF/CFP error signal to increase the feedback BW but we didn't see a any improvement
- at 5pm, the laser/CFP lock seems as stable as in the morning, then we don't see any change in stability during time.
we loggued CFP power measurement and signals from the cavity (~ 1GB of data)
| Ronic Chiche wrote: |
|
today with Alice, we planned to do a long run with ~80kW in the FPC to check if the lock problems are coming from the interaction with the machine or not.
the goal is to check this assumption on a full day comparable with a day of X-ray production.
we started the amplifier at 10am.
during a move of MaY (injection mirrors of the FPC), we observed a sudden total loss of resonances...
the reason was an abnormal displacement of the motor despite the fact the measured position was reasonable.
we already observed an issue like that....
to fix the problem, one just had to move back MaY.
the cavity started to be locked at 11:15am
the RF frequency has been changed to 500.09595MHz equivalent to 33.33973MHz
but we don't have a beating signal @ 500MHz => one will ask to Vincent to fix the issue.
laser motor CH0 : 1.503453 mm
laser moror CH2 : - 50µm
~ 83kW at 12:30pm
| Ronic Chiche wrote: |
|
at the begining of the day, we started to get ~81kW in the FPC for 33% amplifier ratio and after ~1h, we got 84kW after CEP and alignment tuning.
at the end of the day, we got 89kW without walking alignment.
we tried to improve a bit the robustness of the FPC and RF locks:
see the capture for the new locking parameters.
| Ronic Chiche wrote: |
|
the RF frequency changed from 500.1003MHz to 500.0913MHz => it reduced by 9kHz @ 500MHz which is equivalent to 600Hz @ 33MHz (we measured 500Hz @ 33MHz). the electron orbit length increased, so we have to increase the cavities length => increase motor values by ~ 68µm.
for the laser cavity : 1.496 560 mm => 1.564 560 mm
the initial values for the motor of the FP cavity are : MOT.03=-130 000 steps and MOT.06=-900 000 steps.
68µm is roughly 11 000 steps (6nm/step) => MOT.03=-130 000 steps and MOT.06=-889 000 steps.
optimum CEP position : -210.8µm => -192µm
I got 80kW in the FP cavity after CEP and walking alignment
then, 82kW after waiting 3h.
then, 84kW after waiting 5h.
|
|
|
|
|
|
|
|
|
|
|
|
396
|
Fri Feb 7 15:35:37 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
| Attachment 1: Capture1.JPG
|  |
| Attachment 2: Capture.JPG
|  |
|
397
|
Tue Feb 11 10:55:21 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
398
|
Fri Feb 14 10:11:00 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
| Attachment 1: No_noise.JPG
|  |
| Attachment 2: Slaping_door.JPG
|  |
| Attachment 3: Noise1.JPG
|  |
| Attachment 4: Noise2.JPG
|  |
| Attachment 5: Noise3.JPG
|  |
|
399
|
Fri Feb 14 10:58:48 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | then, I moved the accelerometer on top of the "X-hutch side" vessel, placed directly on the metal top case, inside the housing.
- the "no noise same range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer.
on can compare the noise level on the accelerometer with the previous post when it was outside on top of the housing.
its noise is much much lower... which means the housing is properly dumping the acoustic noise at this frequency around 20-30Hz.
so, we increase the accelerometer measurement sensitivity to better measure its noise.
- the "no noise new range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer but with a smaller range.
- the "noise 1,2,3" images show the situation when the PZT start to compensate large noise with good correlation with accelerometer placed on top of the optical vessel.
- the "noise 1,2,3 not clear" images show the situation when the PZT start to compensate large noise with correlation with accelerometer but the signal level is not the same as before.
this make me think the origin of the noise is maybe not coming from the inside of the optical vessel.
=> conclusion : we see for the first time a correlation between the PZT noise and some vibration/acoustic noise.
now, we have to investigate the precise origin of this noise (or the different sources).
| Ronic Chiche wrote: |
|
this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
|
| Attachment 1: no_noise_same_range.JPG
|  |
| Attachment 2: no_noise_new_range.JPG
|  |
| Attachment 3: noise1.JPG
|  |
| Attachment 4: noise2.JPG
|  |
| Attachment 5: noise3.JPG
|  |
| Attachment 6: noise1_not_clear.JPG
|  |
| Attachment 7: noise2_not_clear.JPG
|  |
| Attachment 8: noise3_not_clear.JPG
|  |
|
400
|
Fri Feb 14 19:08:09 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | at the end of the day, I moved the accelerometer from the top of the cavity vessel to the top case of the Onefive laser.
I quickly saw again quite strong correlations between the vibrations compensated by the PZT and the accelerometer signal.
when one does a laser motor step which makes a systematic lock loss, one doesn't see any signal on the accelerometer.
=> more measurements have to be done.
I would like also to put also the accelerometer on the mechanics attached to the pipe at the IP.
=> to be discussed to find the best place as a lot of cables, the 2 dipoles and the aluminium sheets around the vacuum stufs don't let a lot of place to put the accelerometer....
| Ronic Chiche wrote: |
|
then, I moved the accelerometer on top of the "X-hutch side" vessel, placed directly on the metal top case, inside the housing.
- the "no noise same range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer.
on can compare the noise level on the accelerometer with the previous post when it was outside on top of the housing.
its noise is much much lower... which means the housing is properly dumping the acoustic noise at this frequency around 20-30Hz.
so, we increase the accelerometer measurement sensitivity to better measure its noise.
- the "no noise new range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer but with a smaller range.
- the "noise 1,2,3" images show the situation when the PZT start to compensate large noise with good correlation with accelerometer placed on top of the optical vessel.
- the "noise 1,2,3 not clear" images show the situation when the PZT start to compensate large noise with correlation with accelerometer but the signal level is not the same as before.
this make me think the origin of the noise is maybe not coming from the inside of the optical vessel.
=> conclusion : we see for the first time a correlation between the PZT noise and some vibration/acoustic noise.
now, we have to investigate the precise origin of this noise (or the different sources).
| Ronic Chiche wrote: |
|
this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
|
|
|
401
|
Mon Feb 17 09:52:21 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | this morning, I did some new plots with the accelerometer placed on the top of the case of the OneFive laser.
I previously observed with the accelerometer placed on the top of one cavity vessel, the correlation between the accelerometer signal and the PZT noise is pretty good but not 100%.
I will move the accelerometer on the optical cavity table.
| Ronic Chiche wrote: |
|
at the end of the day, I moved the accelerometer from the top of the cavity vessel to the top case of the Onefive laser.
I quickly saw again quite strong correlations between the vibrations compensated by the PZT and the accelerometer signal.
when one does a laser motor step which makes a systematic lock loss, one doesn't see any signal on the accelerometer.
=> more measurements have to be done.
I would like also to put also the accelerometer on the mechanics attached to the pipe at the IP.
=> to be discussed to find the best place as a lot of cables, the 2 dipoles and the aluminium sheets around the vacuum stufs don't let a lot of place to put the accelerometer....
| Ronic Chiche wrote: |
|
then, I moved the accelerometer on top of the "X-hutch side" vessel, placed directly on the metal top case, inside the housing.
- the "no noise same range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer.
on can compare the noise level on the accelerometer with the previous post when it was outside on top of the housing.
its noise is much much lower... which means the housing is properly dumping the acoustic noise at this frequency around 20-30Hz.
so, we increase the accelerometer measurement sensitivity to better measure its noise.
- the "no noise new range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer but with a smaller range.
- the "noise 1,2,3" images show the situation when the PZT start to compensate large noise with good correlation with accelerometer placed on top of the optical vessel.
- the "noise 1,2,3 not clear" images show the situation when the PZT start to compensate large noise with correlation with accelerometer but the signal level is not the same as before.
this make me think the origin of the noise is maybe not coming from the inside of the optical vessel.
=> conclusion : we see for the first time a correlation between the PZT noise and some vibration/acoustic noise.
now, we have to investigate the precise origin of this noise (or the different sources).
| Ronic Chiche wrote: |
|
this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
|
|
|
| Attachment 1: no_noise.JPG
|  |
| Attachment 2: Capture6.JPG
|  |
| Attachment 3: Capture2.JPG
|  |
| Attachment 4: Capture3.JPG
|  |
| Attachment 5: Capture4.JPG
|  |
| Attachment 6: Capture5.JPG
|  |
|
402
|
Mon Feb 17 10:48:00 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | new plots, with the accelerometer placed directly on the optical cavity table (on the marble part), close to the oscillator.
the correlation seems a bit better....
we would need to put the accelerometer on one foot of the table to check if the table has not some micro-movement or at the IP to check if the water in the dipole are doing some vibrations.
| Ronic Chiche wrote: |
|
this morning, I did some new plots with the accelerometer placed on the top of the case of the OneFive laser.
I previously observed with the accelerometer placed on the top of one cavity vessel, the correlation between the accelerometer signal and the PZT noise is pretty good but not 100%.
I will move the accelerometer on the optical cavity table.
| Ronic Chiche wrote: |
|
at the end of the day, I moved the accelerometer from the top of the cavity vessel to the top case of the Onefive laser.
I quickly saw again quite strong correlations between the vibrations compensated by the PZT and the accelerometer signal.
when one does a laser motor step which makes a systematic lock loss, one doesn't see any signal on the accelerometer.
=> more measurements have to be done.
I would like also to put also the accelerometer on the mechanics attached to the pipe at the IP.
=> to be discussed to find the best place as a lot of cables, the 2 dipoles and the aluminium sheets around the vacuum stufs don't let a lot of place to put the accelerometer....
| Ronic Chiche wrote: |
|
then, I moved the accelerometer on top of the "X-hutch side" vessel, placed directly on the metal top case, inside the housing.
- the "no noise same range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer.
on can compare the noise level on the accelerometer with the previous post when it was outside on top of the housing.
its noise is much much lower... which means the housing is properly dumping the acoustic noise at this frequency around 20-30Hz.
so, we increase the accelerometer measurement sensitivity to better measure its noise.
- the "no noise new range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer but with a smaller range.
- the "noise 1,2,3" images show the situation when the PZT start to compensate large noise with good correlation with accelerometer placed on top of the optical vessel.
- the "noise 1,2,3 not clear" images show the situation when the PZT start to compensate large noise with correlation with accelerometer but the signal level is not the same as before.
this make me think the origin of the noise is maybe not coming from the inside of the optical vessel.
=> conclusion : we see for the first time a correlation between the PZT noise and some vibration/acoustic noise.
now, we have to investigate the precise origin of this noise (or the different sources).
| Ronic Chiche wrote: |
|
this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
|
|
|
|
| Attachment 1: no_noise.JPG
|  |
| Attachment 2: Capture5.JPG
|  |
| Attachment 3: Capture6.JPG
|  |
| Attachment 4: Capture7.JPG
|  |
| Attachment 5: Capture2.JPG
|  |
| Attachment 6: Capture3.JPG
|  |
| Attachment 7: Capture4.JPG
|  |
|
404
|
Mon Feb 17 17:37:27 2025 |
Ronic Chiche | Under Process | info | mechanics | lasers and optics | detectors and electronics | ThomX igloo | correlations between accelerometer and lock losses @ 20Hz | one possible source for this acoustic noise was the vibrations coming from the water cooling of the dipoles which is normally never turned off even when the machine is off.
this afternoon, Kevin turned off the main valve of the water cooling of half of the dipoles (the half on the FPC side), and we recorded the peak-peak value of accelerometer signal on a long trend (~20mn) but we didn't see a clear difference before and after.
I keep recording the accelerometer pk-pk signal during the night in case of one could see something different...
| Ronic Chiche wrote: |
|
new plots, with the accelerometer placed directly on the optical cavity table (on the marble part), close to the oscillator.
the correlation seems a bit better....
we would need to put the accelerometer on one foot of the table to check if the table has not some micro-movement or at the IP to check if the water in the dipole are doing some vibrations.
| Ronic Chiche wrote: |
|
this morning, I did some new plots with the accelerometer placed on the top of the case of the OneFive laser.
I previously observed with the accelerometer placed on the top of one cavity vessel, the correlation between the accelerometer signal and the PZT noise is pretty good but not 100%.
I will move the accelerometer on the optical cavity table.
| Ronic Chiche wrote: |
|
at the end of the day, I moved the accelerometer from the top of the cavity vessel to the top case of the Onefive laser.
I quickly saw again quite strong correlations between the vibrations compensated by the PZT and the accelerometer signal.
when one does a laser motor step which makes a systematic lock loss, one doesn't see any signal on the accelerometer.
=> more measurements have to be done.
I would like also to put also the accelerometer on the mechanics attached to the pipe at the IP.
=> to be discussed to find the best place as a lot of cables, the 2 dipoles and the aluminium sheets around the vacuum stufs don't let a lot of place to put the accelerometer....
| Ronic Chiche wrote: |
|
then, I moved the accelerometer on top of the "X-hutch side" vessel, placed directly on the metal top case, inside the housing.
- the "no noise same range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer.
on can compare the noise level on the accelerometer with the previous post when it was outside on top of the housing.
its noise is much much lower... which means the housing is properly dumping the acoustic noise at this frequency around 20-30Hz.
so, we increase the accelerometer measurement sensitivity to better measure its noise.
- the "no noise new range" image shows a standard situation during 10s when there no noise either on PZT or Accelerometer but with a smaller range.
- the "noise 1,2,3" images show the situation when the PZT start to compensate large noise with good correlation with accelerometer placed on top of the optical vessel.
- the "noise 1,2,3 not clear" images show the situation when the PZT start to compensate large noise with correlation with accelerometer but the signal level is not the same as before.
this make me think the origin of the noise is maybe not coming from the inside of the optical vessel.
=> conclusion : we see for the first time a correlation between the PZT noise and some vibration/acoustic noise.
now, we have to investigate the precise origin of this noise (or the different sources).
| Ronic Chiche wrote: |
|
this morning, I did some measurement with nobody interfering with the tests.
- the "no noise" image shows a standard situation during 10s when there is no noise either on PZT or Accelerometer.
most of the time, we are in this situation.
- the "slaping door" image shows the case where the large igloo door is opened and slaping when it closes.
the accelerometer and the PZT exhibit correlated noise when the door is slaping.
we can see a PZT "recovery" time longer than the perturbation.
but these events are rare and are not the source of the problematic perturbations.
- "noise 1,2,3" images show the typical situation when the PZT start to compensate large noise without any correlation with accelerometer placed on top of the housing.
=> conclusion, some external noise (to the housing) should not be the source of the perturbations on the PZT.
| Ronic Chiche wrote: |
|
today I connected a copy of the laser PZT signal to the 2nd scope CH2 (with AC coupling to remove the DC offset) to be able to monitor synchronously the Accelerometer and laser PZT signals.
the accelerometer is still connected to the 2nd scope CH4 and placed on top of the housing.
I filtered both signals in the Labview Signal Express software with a low-pass filter at 30Hz to focus on low frequencies noise (~20Hz).
now, I need to wait to work with the bunker closed to compare with normal operation (if some people work in the same time in the bunker, obviously, we will get some correlation between the accelerometer and laser PZT signals.....)
| Ronic Chiche wrote: |
|
I installed an accelerometer setup in the bunker.
presently, the accelerometer is placed on top of the housing and its signal is connected to the 2nd scope (33MHz and 500MHz RF beating) on channel 4.
the FPC is locked to ~90kW.
the accelerometer noise is filtered on the Labview Signal Express software in order to focus on the 20Hz noise.
one applied a RII elliptic 5th order low pass filter at 30Hz.
the 20Hz noise can be seen on the PZT which always compensate for CFP frequency drifts.
figure 1 : example of typical accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) is quite (measurement on 4 seconds)
figure 2 : example of accelerometer filtered noise (yellow curve) when the PZT compensation (green curve) exhibits some 20Hz noise (measurement on 10 seconds)
conclusion : there is no clear evidence of a correlation between accoustic noise outside of the housing (measured by the accelerometer) and the 20Hz noise in the laser PZT compensation.
=> putting the 2 signals on 2 different scopes doesn't help because the slow acquisition done is not synchronous.
next try : use the same scope and put the accelerometer inside the housing, for example on top of one of the FPC vessel.
|
|
|
|
|
|
|
|
|