  361   Fri Sep 6 17:27:20 2024 Ronic ChicheUnder Processissuemechanics | lasers and optics | detectors and electronicsThomX igloo20Hz oscillation in the locking between Laser and FP-cavitycould it be possible this 20Hz oscillations
comes from anouncements in the bunker, puting
the housing+table in vibration ?
  
  382   Fri Nov 22 10:23:33 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthe RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz
  
  383   Tue Nov 26 18:00:14 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionat the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP
 Capture.JPG 
  384   Wed Dec 4 12:26:03 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction
  
  385   Wed Dec 4 17:11:50 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionwe observed that :

- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected
 20241204_125955.jpg 
  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  396   Fri Feb 7 15:35:37 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20HzI installed an accelerometer setup in the
bunker.
presently, the accelerometer is placed
 Capture1.JPGCapture.JPG 
  397   Tue Feb 11 10:55:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hztoday I connected a copy of the laser PZT
signal to the 2nd scope CH2 (with AC coupling
to remove the DC offset) to be able to monitor
  
  398   Fri Feb 14 10:11:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some measurement with
nobody interfering with the tests.

- the "no noise" image
 No_noise.JPGSlaping_door.JPGNoise1.JPGNoise2.JPGNoise3.JPG 
  399   Fri Feb 14 10:58:48 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthen, I moved the accelerometer on top
of the "X-hutch side" vessel, placed
directly on the metal top case, inside the
 8x 
  400   Fri Feb 14 19:08:09 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzat the end of the day, I moved the accelerometer
from the top of the cavity vessel to the
top case of the Onefive laser.
  
  401   Mon Feb 17 09:52:21 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzthis morning, I did some new plots with
the accelerometer placed on the top of the
case of the OneFive laser.
 6x 
  402   Mon Feb 17 10:48:00 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hznew plots, with the accelerometer placed
directly on the optical cavity table (on
the marble part), close to the oscillator.
 7x 
  404   Mon Feb 17 17:37:27 2025 Ronic ChicheUnder Processinfomechanics | lasers and optics | detectors and electronicsThomX igloocorrelations between accelerometer and lock losses @ 20Hzone possible source for this acoustic noise
was the vibrations coming from the water
cooling of the dipoles which is normally
  