HOME SBOX THOMX MINICAV Utilities
THOMX orders THOMX installation THOMX commissioning THOMX control command
  Status of commissioning, report also here plots are reports., Page 19 of 24  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Statusdown Type Category Location Title Text Attachments
  304   Thu Dec 7 14:59:02 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthon last tuesday, I did a long-term measurement
of the frequency drift when the heating cable
is powered ON at 20V (2x 10V) @ t=0mn.
 untitled.png 
  305   Fri Dec 8 12:21:25 2023 Ronic ChicheFixedinfolasers and opticsThomX iglooStrecher and fiber injection alignmenttoday, the Alphanov amplifier stopped because
of the too low injected power : ~2.5mW (measured
by the Alphanov software)
  
  306   Mon Dec 11 17:21:32 2023 Ronic ChicheFixedissuemechanics | lasers and optics | detectors and electronicsThomX iglooTemperature control of the FP-cavity lengthtoday with Fatematuj, we did a long-term
frequency drift measurement between the FP-cavity
loaded with 50kW and the RF reference frequency...
 frequency_drift.png 
  307   Fri Dec 22 09:46:18 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis morning, I shut off all the equipements
(especially the computer) except the ones
powered by the UPS : laser controller, laser
  
  308   Fri Dec 22 16:13:27 2023 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooChristmas shutdownthis afternoon, I checked visually what
happens when the AC power of the UPS is broken
down => the laser controller has still
  
  309   Wed Jan 10 14:52:22 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthis morning, I plugged back the 4 power
cables which supply all the equipments.

all the equipments have restarted
  
  311   Wed Jan 10 18:43:03 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthe laser coupled into the amplifier is
still measured at ~3mW at the input, on the
Alphanov software, once the Amp stage are
  
  312   Thu Jan 11 13:42:16 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownthis morning, I set the Ring frequency
at 500.25MHz and after switching ON the power
supply of the amplifiers for the RF signal
  
  313   Tue Jan 16 12:19:35 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronics | softwareThomX iglooRestarting equipements after Christmas shutdownon last friday (12/01/2024), the IcePap
DS issue was solved and I was able to control
the FP-cavity motors properly.
  
  314   Tue Jan 16 12:26:12 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloo33MHz (FP-cavity vs RF) phase stabilitythis morning, with Vincent Chaumat, we
made a beating (phase detection) between
the laser 33MHz and the 33MHz coming from
  
  315   Fri Jan 19 18:05:42 2024 Ronic ChicheFixedinfodetectors and electronicsThomX iglooAdding one photodiode in reflectionthis morning, I added a DET36 photodiode
in reflection (I used a thin beam splitter)
to better measure the coupling over the full
  
  316   Thu Jan 25 10:15:28 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllerspreviously, we have connected motor M4
with an IcePap controller.
see this post : https://elog.lal.in2p3.fr/FPC/THOMX+commissioning/278
  
  317   Thu Jan 25 12:45:41 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllersthis double motors scheme works good.

if motor P4 is used by increasing
value, the FP-cavityPZT signal (pink signal
  
  318   Thu Jan 25 13:36:35 2024 Ronic ChicheFixedinfodetectors and electronicsThomX iglooFirst stable X-rays productionthis morning, we locked the laser on the
FP-cavity with about 48-49kW stable in the
FP-cavity (for 32% of amplifier ratio).
  
  319   Fri Jan 26 11:05:27 2024 Ronic ChicheFixedinfomechanics | lasers and optics | cablingThomX igloocontroller M1 & M4 (plan mirrors) with IcePap controllersat the begining of each session, it will
be mandatory to avoid any backlash for the
motors :
  
  320   Fri Jan 26 13:04:56 2024 Ronic ChicheFixedinfolasers and optics | detectors and electronicsThomX igloo33MHz (FP-cavity vs RF) phase stability today, I locked the laser on the
FP-cavity and the FP-cavity on the RF reference
with 47kW inside the FP-cavity.
  
  321   Thu Feb 1 17:23:23 2024 Ronic ChicheFixedinfodetectors and electronicsThomX igloolockingduring the last days we changed the FP-cavity
- RF reference locking system to force the
right bucket:
 Capture.JPGCapture.JPG 
  322   Fri Feb 2 11:53:40 2024 Ronic ChicheFixedinfomechanics | lasers and opticsThomX iglooLaser cavity temperature/pressure sensitivitythis morning, I did a 500MHz beating frequency
(Laser vs RF) drift test with the Smaract
motors configured with "Sensor Mode"
 Capture.JPG 
  323   Wed Feb 7 18:33:42 2024 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzThis morning with Daniele, we changed the
laser/RF locking scheme :

1) we use the laser 33MHz internal
  
  327   Fri Mar 1 18:38:17 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavityToday, we restarted the FP-cavity locking,
after 3 weeks without using it.
those 3 weeks have been used to set
 good_parameters.png 
ELOG V3.1.4-395e101