420
|
Mon Mar 31 18:19:30 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | today, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser |
|
|
428
|
Wed Jun 25 09:43:36 2025 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New power record in ThomX cavity | yesterday, we were able to store more than
98kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio |
|
|
344
|
Wed Jun 19 09:07:56 2024 |
Ronic Chiche | Fixed | info | software | ThomX igloo | New password for login on the ThomX computer | the previous password has expired.
the new access from the computer
: |
|
|
334
|
Tue Apr 2 08:51:21 2024 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New multiplication factor for the Fabry-Perot intra-cavity power | last week, we measured the transmission
of a plan mirror from the same batch than
the ThomX mirrors and we got ~ 1.75ppm instead |
|
|
303
|
Thu Dec 7 09:09:27 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | New mirrors batch informations | the 2 files describe the specfications
for the16 mirrors ordered (4 for ThomX
+ spare, 4 for SBOX + spare) and the measurements |
 |
|
75
|
Fri Oct 11 18:49:00 2019 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | New locking scheme | Before, the locking scheme was to produce
an error signal with the PDH box, send its
output to the electronic amplifier box and |
|
|
414
|
Tue Mar 4 14:54:31 2025 |
Ronic Chiche | Fixed | info | mechanics | software | ThomX igloo | New direction for cavity motors | from now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project. |
|
|
46
|
Thu Jul 4 10:17:46 2019 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | New design for PDH boxes | A new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser. |
|
|
36
|
Tue May 21 17:44:46 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | New Suprasil mirror from LMA | 14/05/19:
New Suprasil mirror received. It
will replace the S-BOX suprasil mirror on |
|
|
60
|
Fri Sep 27 10:43:17 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | New Suprasil mirror from LMA | 19/09/2019 : email from Chrisophe Michel
about AR coating of LMA mirrors after reading
that Ta2O5 layers can be damaged in vacuum |
|
|
198
|
Fri Mar 17 18:54:19 2023 |
Manar Amer | Fixed | report | lasers and optics | Optical room | New Mirrors from LMA _ Images | Today we tested a mirror from one patch
image is for the front face of
the mirror |
   |
|
17
|
Tue Feb 19 15:50:08 2019 |
Loïc Amoudry | Fixed | info | mechanics | Optical room | Motors connexions | Motors are connected. The true mirror's
name are P1 for injection mirrors, S2, S3
and P4. (S=spherical, P=planar). |
|
|
19
|
Tue Mar 19 17:01:52 2019 |
Loïc Amoudry | Fixed | issue | mechanics | Optical room | Motors Z axis reversed | S2 and S3 z-axis are initially at 1/4 (5mm/20mm) of
there range over ~20mm range. This is meant
to be able to spread them up to ~15mm in |
|
|
23
|
Thu Mar 28 09:25:58 2019 |
Loïc Amoudry | Fixed | issue | mechanics | Optical room | Motors Z axis reversed | All Z motors (for P1, S2, S3 and P4) have
been initialized again with a proper HOME
command with their own controller with |
|
|
52
|
Fri Aug 30 17:52:41 2019 |
Ronic Chiche | Fixed | issue | mechanics | detectors and electronics | Optical room | Motor issue | Today, Axis 9 (Z-axis of P1) has blocked
the software which drives all the motors.
impossible to bypass the problem. |
|
|
59
|
Wed Sep 25 15:49:28 2019 |
Ronic Chiche | Fixed | issue | mechanics | detectors and electronics | Optical room | Motor issue | Today again, same problem with axis 9 blocking
the controlling software during the mirror
alignment procedure. |
|
|
15
|
Fri Feb 1 14:10:25 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Other | Mirrors sent to LMA | 30/01/19 - As LMA people came, we discussed
about the spots on ThomX mirrors which should
be clean. As mentionned in "SBOX commissioning", |
|
|
55
|
Tue Sep 3 18:06:29 2019 |
Loïc Amoudry | Fixed | info | lasers and optics | Optical room | Mirrors sent to LMA | Mirrors have been sent today to LMA for
cleaning and maybe annealing (recuit). 3
ULE of ThomX and the fused silicate for injection |
|
|
14
|
Fri Feb 1 13:39:21 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirrors checked with binocular microscope | 29/01/19 - ThomX mirrors have also been
checked with binocular microscope. They shown
the same spots as S-BOX mirrors. |
 |
|
33
|
Wed Apr 10 13:11:46 2019 |
Loïc Amoudry | Fixed | report | lasers and optics | Optical room | Mirror's cleaning and finesse | Summary of what have been cleaned
the last week:
P1 with isopropanol, finesse 11000 |
|