  323   Wed Feb 7 18:33:42 2024 Ronic ChicheFixedinfodetectors and electronicsOptical roomlock oscillateur 33MHz - synthé 500MHzThis morning with Daniele, we changed the
laser/RF locking scheme :

1) we use the laser 33MHz internal
  
  447   Fri Jul 18 15:56:40 2025 Ronic ChicheUnder Processinfolasers and opticsThomX igloolaser operation again with machine OFFThe laser start at 33% with 92 KW optimized
and

P=0.03
  
  441   Thu Jul 10 18:02:54 2025 Ronic ChicheFixedinfodetectors and electronicsThomX igloolaser PZT amplifierthis afternoon, I added the Gain = 2.8
amplifier at the output of the Laselock to
drive the laser PZT.
  
  355   Thu Sep 5 09:51:22 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethe CVBG of the compressor module seems
to have an issue.

here is the plan of the work :
  
  356   Thu Sep 5 09:53:10 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issue1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio.
 12x 
  357   Fri Sep 6 11:56:53 2024 Ronic ChicheFixedissuelasers and optics | detectors and electronicsThomX igloofixing CVBG issuethis morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we
 20240906_151100.jpg 
  262   Fri Sep 15 19:13:44 2023 Ronic ChicheFixedinfolasers and opticsThomX igloodrift calculation for the SMA100Athe goal is to estimate what could be the
frequency drift at 500MHz for the SMA100A:
see phase noise datasheet in attachement
 Capture1.PNGCapture2.PNG 
  382   Fri Nov 22 10:23:33 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthe RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz
  
  383   Tue Nov 26 18:00:14 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionat the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP
 Capture.JPG 
  384   Wed Dec 4 12:26:03 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction
  
  385   Wed Dec 4 17:11:50 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionwe observed that :

- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected
 20241204_125955.jpg 
  386   Wed Dec 4 17:53:49 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionlast thing we tried :

we removed the threshold on the
FPC/RF error signal.
  
  387   Wed Dec 11 18:51:35 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionThis morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock.
 Capture.JPG 
  388   Thu Dec 12 18:28:02 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionmajor result of the day: X-ray vertical
scan by moving the hexapod

abscise : hexapod position
 Capture.JPG 
  389   Tue Dec 17 16:28:32 2024 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors.
  
  390   Tue Jan 7 10:18:08 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the cavity after
the Christmas shutdown.
everything went fine.
  
  394   Thu Jan 23 17:55:41 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio.
  
  395   Thu Feb 6 10:29:36 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning,
  
  417   Tue Mar 18 11:25:07 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productionthis morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio.
  
  419   Mon Mar 31 17:12:56 2025 Ronic ChicheUnder Processreportmechanics | lasers and optics | detectors and electronicsThomX iglooday by day run for X-ray productiontoday, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)...  insead of the 00
  