323
|
Wed Feb 7 18:33:42 2024 |
Ronic Chiche | Fixed | info | detectors and electronics | Optical room | lock oscillateur 33MHz - synthé 500MHz | This morning with Daniele, we changed the
laser/RF locking scheme :
1) we use the laser 33MHz internal |
|
|
447
|
Fri Jul 18 15:56:40 2025 |
Ronic Chiche | Under Process | info | lasers and optics | ThomX igloo | laser operation again with machine OFF | The laser start at 33% with 92 KW optimized
and
P=0.03 |
|
|
441
|
Thu Jul 10 18:02:54 2025 |
Ronic Chiche | Fixed | info | detectors and electronics | ThomX igloo | laser PZT amplifier | this afternoon, I added the Gain = 2.8
amplifier at the output of the Laselock to
drive the laser PZT. |
|
|
355
|
Thu Sep 5 09:51:22 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | the CVBG of the compressor module seems
to have an issue.
here is the plan of the work : |
|
|
356
|
Thu Sep 5 09:53:10 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | 1) this morning, I aligned to CFP to get
back 82kW in the cavity for 33% of amplifier
ratio. |
12x |
|
357
|
Fri Sep 6 11:56:53 2024 |
Ronic Chiche | Fixed | issue | lasers and optics | detectors and electronics | ThomX igloo | fixing CVBG issue | this morning with Daniele, we realigned
the amplifier beam axis on the iris position.
it was pretty fast an easy => we |
|
|
262
|
Fri Sep 15 19:13:44 2023 |
Ronic Chiche | Fixed | info | lasers and optics | ThomX igloo | drift calculation for the SMA100A | the goal is to estimate what could be the
frequency drift at 500MHz for the SMA100A:
see phase noise datasheet in attachement |
 |
|
382
|
Fri Nov 22 10:23:33 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | the RF frequency changed from 500.1003MHz
to 500.0913MHz => it reduced by 9kHz @
500MHz which is equivalent to 600Hz @ 33MHz |
|
|
383
|
Tue Nov 26 18:00:14 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | at the begining of the day, we started
to get ~81kW in the FPC for 33% amplifier
ratio and after ~1h, we got 84kW after CEP |
|
|
384
|
Wed Dec 4 12:26:03 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today with Alice, we planned to do a long
run with ~80kW in the FPC to check if the
lock problems are coming from the interaction |
|
|
385
|
Wed Dec 4 17:11:50 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | we observed that :
- the MOT.03 motor always exhibits
some perturbations on the transmitted, reflected |
|
|
386
|
Wed Dec 4 17:53:49 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | last thing we tried :
we removed the threshold on the
FPC/RF error signal. |
|
|
387
|
Wed Dec 11 18:51:35 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | This morning, I added an amplifier on the
33MHz beating signal in between the mixer+LPF
and the scope/Laselock. |
|
|
388
|
Thu Dec 12 18:28:02 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | major result of the day: X-ray vertical
scan by moving the hexapod
abscise : hexapod position |
|
|
389
|
Tue Dec 17 16:28:32 2024 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, Kevin reduced the steering
current in the IcePap controllers of the
FP cavity motors. |
|
|
390
|
Tue Jan 7 10:18:08 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the cavity after
the Christmas shutdown.
everything went fine. |
|
|
394
|
Thu Jan 23 17:55:41 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today we did x-rays => we got 41 000
pA at maximum and 90kW in the FPC for 33%
amplifier ratio. |
|
|
395
|
Thu Feb 6 10:29:36 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, I restarted the lock of the
CFP after almost 2 weeks without operation.
after quick alignment and CEP tuning, |
|
|
417
|
Tue Mar 18 11:25:07 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | this morning, the cavity was pretty misaligned
=> basic alignment in y direction helps
a lot => 93kW for 33% amp ratio. |
|
|
419
|
Mon Mar 31 17:12:56 2025 |
Ronic Chiche | Under Process | report | mechanics | lasers and optics | detectors and electronics | ThomX igloo | day by day run for X-ray production | today, the alignment of FP cavity was so
bad that I tuned the 01 mode by error (CEP
and alignment)... insead of the 00 |
|