  Status of commissioning, report also here plots are reports., Page 1 of 24  Not logged in ELOG logo
ID Date Author Status Type Categorydown Location Title Text Attachments
  7   Mon Oct 22 11:03:22 2018 Ronic ChicheFixedinfovacuumOptical roomDétection de fuiteMail de Bruno Mercier du 18/10/2018 :

Un petit CR
de la journée:
  
  10   Mon Nov 26 15:18:49 2018 Ronic ChicheFixedinfovacuumOptical roomEtuvage cavité THOMXMail de Bruno Mercier
du 19/11/2018 :


Une première cavité
  
  11   Fri Dec 21 13:55:09 2018 Loïc AmoudryFixedinfovacuumOptical roomEnd of vacuum test and cavity ready for cleaningVacuum tests finished on 19 december
2018.

Spent last two days to discuss
 IMG_20181221_1110152.jpgIMG_20181221_1119082.jpgIMG_20181221_1113122.jpgIMG_20181221_1124492.jpg 
  65   Thu Oct 3 13:53:44 2019 Loïc AmoudryFixedreportvacuumOptical roomCavity under vacuum The cavity is right now at 6.5e-8 mbar
(turbo pumps on for 1 night and ionic pumps
for 3h), primary pumps and turbo pumps are
  
  83   Tue Nov 26 16:21:27 2019 Loïc AmoudryFixedissuevacuumOptical roomPneumatic valvesThe pneumatic valves are now plugged on
the university air network.
The air valve is fully openned for
  
  151   Tue Jun 14 10:43:07 2022 Ronic ChicheFixedinfovacuumThomX iglooVessels vacuum at ambiant pressureLast Friday and this morning, with Bruno,
we close the ring/cavity valves and put some
dry air in the two vessels through a filter
  
  13   Fri Feb 1 13:20:47 2019 Loïc AmoudryFixedreportutilitiesOptical roomEnd of cleaning, plastic fixed on cavity08/02/19 - End of the cleaning process.  covered_by_plastic.pngcovered_by_plastic2.png 
  199   Mon Mar 20 09:33:54 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thAll the equipments have been switched off
on Friday 17th due to a power shut down on
Saturday 18th :
  
  201   Mon Mar 20 17:39:28 2023 Ronic ChicheFixedinfoutilitiesThomX iglooPower shut down on Saturday the 18thToday, I restarted all the equipements
:

Chiller                                                
  
  327   Fri Mar 1 18:38:17 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavityToday, we restarted the FP-cavity locking,
after 3 weeks without using it.
those 3 weeks have been used to set
 good_parameters.png 
  328   Mon Mar 4 09:32:06 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning I solved the problem of the
33MHz frequency beating which should be ~12kHz
between the generator (at the new frequency
  
  331   Tue Mar 5 11:20:43 2024 Ronic ChicheFixedinfosoftwareThomX igloocorrect parameters for locking the FP-cavitythis morning, I finished the FP-cavity
alignment with the new ring RF frequency.
I get back 50kW @ 33% amplifier ratio.
 Correct_lock_parameters.png 
  344   Wed Jun 19 09:07:56 2024 Ronic ChicheFixedinfosoftwareThomX iglooNew password for login on the ThomX computerthe previous password has expired.

the new access from the computer
:
  
  412   Fri Feb 21 19:40:50 2025 Ronic ChicheFixedissuesoftwareThomX igloostrange drift (new effect !?!)today, we had a strange effect :
both the laser and the FP cavity were
locked on the RF frequency (500.10045 MHz),
  
  56   Fri Sep 6 14:48:14 2019 Loïc AmoudryFixedreportmechanics | vacuumOptical roomPrimary vacuum to check dustThe cavity has been cleaned then put under
primary vacuum (primary pump without vacuum
flow control). Dusts presence was checked
 Image3.jpgImage6.jpg 
  414   Tue Mar 4 14:54:31 2025 Ronic ChicheFixedinfomechanics | softwareThomX iglooNew direction for cavity motorsfrom now on, one reverts the FP cavity
motors direction to compensate the long drift
from the begining of the project.
  
  453   Thu Sep 18 18:29:04 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23thto anticipate the power shut down on next
tuesday 23/09,
this afternoon, I switched off all
  
  454   Fri Sep 26 11:08:21 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23ththis morning, I restarted all the equipments
of the FPC.

everything was fine after being
  
  455   Fri Sep 26 11:13:35 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23ththe 33MHz/500MHz RF frequencies from the
Ring seems different from the previous state
(maybe working at an energy of 50MeV instead
  
  456   Mon Sep 29 10:22:32 2025 Ronic ChicheFixedinfomechanics | lasers and optics | vacuum | detectors and electronics | cabling | software | utilitiesThomX iglooPower shut down on September 23thThis morning I did a phase alignment on
the PDH signal generator (Rigol DG4102)
this procedure ensure that both phases
 img1.jpg 