  420   Mon Mar 31 18:19:30 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavitytoday, we were able
to store more than 97kW in the FP cavity,
always with the same parameter : 33% laser
 20250331_181029.jpg 
  422   Fri May 2 10:05:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerThe temperature slitly increase in thomx
Bunker from 23° to 24° during the
last day.
 temp.png 
  423   Tue May 6 09:29:43 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX Bunkerafter the new temperature setting for the
bunker air cooling (winter to summer transition),
the temperature drop from 24° to 20°C
 Sans_titre.png 
  424   Tue May 6 10:58:18 2025 Ronic ChicheUnder Processreportlasers and opticsThomX iglooair conditionning in ThomX BunkerI finally got 93-94kW for 33% amp ratio.

I had to move the FP-cavity length
to compensate the temperature change in the
  
  428   Wed Jun 25 09:43:36 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooNew power record in ThomX cavityyesterday, we were able to store more than
98kW in the FP cavity, always with the same
parameter : 33% laser amplifier ratio
 img1(3).jpg 
  431   Thu Jun 26 12:37:22 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 46kW power in the FP-cavity:


Alplhanov amplifier ratio
: 20%
  
  432   Tue Jul 1 12:13:18 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC powerFor ~ 23kW power in the FP-cavity:


Alplhanov amplifier ratio
: 15%
  
  436   Wed Jul 9 14:12:54 2025 Ronic ChicheFixedinfolasers and opticsThomX iglooRecipies for different FPC power

For ~ 66kW power in the
FP-cavity:
  
  444   Tue Jul 15 17:34:13 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooStability test Without and with The laser starts at 93 KW.

This morning I operated the laser
locked with the RF for 1h30 without any delock.
  
  445   Wed Jul 16 17:17:57 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooSuite tests stabilitéWe continue to find what gives high freq.
perturbation.

The laser starts at 92 KW it is
  
  446   Fri Jul 18 09:23:40 2025 Ronic ChicheUnder Processinfolasers and opticsThomX iglooXrays experiment with prostateToday we do XRays for experiment.

The laser start to 33% at 93 KW
but Pgain = 0.033
  
  447   Fri Jul 18 15:56:40 2025 Ronic ChicheUnder Processinfolasers and opticsThomX igloolaser operation again with machine OFFThe laser start at 33% with 92 KW optimized
and

P=0.03
  
  464   Mon Feb 2 15:29:45 2026 Ronic ChicheFixedinfolasers and opticsThomX iglooLaser Amplifier used at 70%today, I installed a laser dump just before
the telescope to avoid any high power (50W
instead of 17W usually) issue in the injection
 img1.jpg 
  465   Wed Apr 22 09:52:40 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last Friday, we tried to increase the FP-cavity
power by just increasing the amplifier ratio
from 35% to 70%.
 8x 
  466   Mon Apr 27 16:55:15 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power today with Alice and Daniele,

we checked the distance of the
optical setup :
  
  467   Wed Apr 29 09:38:20 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power new power increase after alignment of the
waveplates and iris.

amplifier ratio (%) => FPC cavity
 Measured_data_v2.png 
  468   Wed Apr 29 15:31:06 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power I installed a stronger optical filter on
the reflection photodiode and loaded it on
1kOhms.
 Sans_titre.png 
  469   Mon May 18 11:33:46 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power this morning with Daniele, we set the amplifier
ratio to 33% => 97kW

then, we set the amplifier ratio
  
  470   Thu May 28 10:31:23 2026 Ronic ChicheUnder Processreportlasers and opticsThomX iglooIncreasing the FP-cavity power Last friday, with Daniele, we did some
realignement on the 2nd CVBG of the compressor
: the beam shape seems better, now.
  
  46   Thu Jul 4 10:17:46 2019 Ronic ChicheFixedinfodetectors and electronicsOptical roomNew design for PDH boxesA new design has been studied for the 5
PDH boxes to better match the low (33MHz)
repetition rate of the ThomX laser.
 2019-06-14_-_PDH_Maurice_modifié.pdf 