HOME SBOX THOMX MINICAV Utilities
SBOX orders SBOX installation SBOX commissioning SBOX control command
  Status of commissioning, report also here plots are reports., Page 1 of 13  Not logged in ELOG logo
Entry   Dust Cleaning of SBox, posted by Manar Amer at Optical room about utilities Log_Top_window.jpgLog_Reflection_window.jpgLog_Injection_Side_window.jpgLog_Injection_side_window2.jpg
An Initial cleaning of the KBoX outside was done, All the optics and mechanics placed that were on the table were removed.

Only the old Mitylaser amplifier remains on the table.

Since we will be using the ThomX Celia amplifier, we will remove it and place it in a secure location (to be decided).
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about utilities 
The cleaning was done twice with half an hour interval between the two times
reading on the dust meter was taken after each time, and it was zero averaged over a 10-min




Manar
Entry   Spincoater - Mirrror cleaning , posted by Manar Amer at Optical room about utilities 
In preparation for cleaning the mirrors.

The spincoater has been moved with its bump into the sas of the SBox.

The pure water used will be provided by Alice, as the previous source in the workshop is not available.
Entry   chiller for CELIA amplifier, posted by Aurélien Martens at Optical room about utilities 
The chiller of CELIA amplifier has been moved from the corridor to the changing room in front of PLIC. 

It was not functionning well (quick drop of flow below 0.9l/min). After several cleanings of the filter, shorting the water circuit a stable
2.1l/min flow was obtained. Then the water circuit was elongated to go close to the amplifier but not into it. Allowing to get about 1.3l/min stable. Now
    Reply   chiller for CELIA amplifier, posted by Aurélien Martens at Optical room about utilities 
today, temperature of the chiller has been set to 23°C.

measured temperature in the chiller reaches 23°C after approximatively 10 minutes




Aurélien
Entry   optical table cleaning, posted by Ronic Chiche at Optical room about utilities Oxydation.jpg20241203_113105.jpg20241203_125359.jpg
this morning with Alice and Daniele, we removed all the optics elements and equipments from the SBOX optical table and started to clean it.
the dust meter count 0 on all particle sizes after the cleaning.

we observed a small part of the SBOX which seems to be oxydised (see picture).
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
this afternoon, we checked the dust meter which is at 0 for 1 and 5µm dust particles but ~ 2000-3000 for 0.3µm particles.

we opened the two top panels to let the air flow clean the inside of the vessel.

we observed some other minor oxydised regions (than the one taken in picture) on the external parts of the inox panels but at first sight, nothing
    Reply   optical table cleaning, posted by Ronic Chiche at Optical room about utilities 
now, it seems the table is clean enough (dust meter counts 0 particles) to install a 2 mirrors FP-cavity.




Ronic
Chiche wrote:



this afternoon, we checked the dust meter which is at 0 for 1 and
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about mechanics | lasers and optics | utilities 6x
The inside of the cavity was cleaned today. It was very dirty and had big dust particles and fibers inside.

Cleaning was done for everything; wall, floor, fixed mounts, wires (still have some dust difficult to remove), edges.

The dust meter average was measured outside the cavity (2471 p/m3 av 6 min)  and inside after cleaning (1424 p/m3 av 10 min).
    Reply   Dust Cleaning of SBox, posted by Manar Amer at Optical room about mechanics | lasers and optics | utilities 20220331_Dust_Meter_Outside_cavity_Av10min.jpg20220331_Dust_Meter_Inside_cavity_Av10min.jpg
After an overnight where the cavity box was left open, a measurement of the Dust meter was taken:

Outside on the optical table on direct air flux (1701 p/m3 Av 10 min) and

Inside the cavity box (998 p/m3 Av 10 min)
Entry   new setup for the 160MHz Menhir oscillator, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics | software Plan_SBOX_@_160MHz.pptxImplantation_disymmetric.mIMG_20210519_155329.jpg
from the begining of the week, Xinyi, Aurélien, Viktor and myself started to install a new setup for the Menhir 160MHz oscillator.
the goal is to rich a record power in the FP-cavity.

- the 160MHz Menhir oscillator has been injected in a fiber.
Entry   Menhir Pulsed Laser, posted by Manar Amer at Optical room about mechanics | lasers and optics | detectors and electronics MENHIR_injection_into_fiber.jpgSBox_M.jpg20220620_SBox_MENHIR.pptx
The SBox Length (FSR), was changed to match the repetition rate of the Menhir pulsed laser Frep = 216.6625 MHz

It was changed by removing the 2 D-shaped mirrors placed between M1 and M2, distance between M1-M2 ~= 169 mm 

it was still needed to be adjusted with M1 motor to reach the correct FSR.
Entry   D-shape mirrors positionning status, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 
This afternoon we opened the cavity and put the D-shape mirrors at their correct place, close to the beam.
we checked the relative position of the mirrors to the beam using the 2nd stage of the amplifier (<1W) and with the sensitive (and cleaned) orange
optical card.
    Reply   D-shape mirrors positionning status, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 
The cavity box is vacuum pumped at 6*10^-2 mbar.




Ronic
Chiche wrote:



This afternoon we opened the cavity and put the D-shape mirrors at
    Reply   D-shape mirrors positionning status, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 
summary:

- the motors used to move the D-shape are the Newport Picomotors 8303-V
the sensitivity is roughly 30nm/step
Entry   first attempt to lock, posted by Ronic Chiche at Optical room about mechanics | lasers and optics | detectors and electronics 20250623_123816.jpg20250623_123833.jpg20250623_123908.jpg
With Alice, we installed the EOWaves oscillator to be locked on the FP-cavity (T1 ~ 2500ppm, T2 ~ 10ppm => F ~ 2500)
FSR = 216MHz => LW = 86kHz.

We installed the PDH box, and we got some error signal, but the shape of the transmission signal and error signal is a bit strange...
Entry   Motors for D-shaped mirrors, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics tek00000.pngtek0000CH1.isftek0000CH2.isftek0000CH3.isftek0000CH4.isf
Motors have been installed on 16/10/18. No problem with them.

Effect of the motors tested on 17/10/18. No improvement. But they give the possibility to perfectly cut HOM or let them go through as show
the following picture of a 2.2 mode at ~340 mW in trans and 70% coupling @4A.
Entry   Power measurement with D-shape, posted by Loïc Amoudry at Optical room about mechanics | lasers and optics 
Measurements of lot of points with D-shape mirrors well positionned.

Power not optimized to the best but almost. (@4A could have 350 mW).




I (A)
Ptrans (mW)
 Coupling
Entry   Alignment of a 2-mirror FP cavity, posted by Ronic Chiche at Optical room about mechanics | lasers and optics 
today with Alice,

- we measured the height of the SBOX windows center : 140mm from the optical table.
- we set the laser fiber colimator exactly at this height.
Entry   2-mirror cavity alignment, posted by Alice Renaux at Optical room about mechanics | lasers and optics 2-mirror_cavity_alignment.zip
At the beginning of the week, I installed a half-wave plate, a beamsplitter cube and a quarter-wave plate, as well as the end-of-cavity mirror, which
I unsuccessfully tried to align.

I removed the end-of-cavity mirror and started the laser injection over again with the two motorized mirrors placed in front of the vacuum chamber
ELOG V3.1.4-395e101