    Reply   CVBG stretching / Fiber Injection , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics | software 
closing series




Manar
Amer wrote:



Before injecting into the amplifier, the pulse needs to be stretched
Entry   OEwaves CW Laser - Phase Noise , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 20210207_OEwaves_laser.jpg20210207_Self_coupling_setup.jpgSchematic-setup-for-optical-delayed-self-coupling-detection.png

We started measuring the phase noise on the OEwaves CW laser.

Class 3b
wavelength 1.5 um


The
procedure is done using self coupling of the laser

splitter 50%-50%\
delay line 100 m 
all fibers are PM type
(polarity maintained)
Photodetector is "lab buddy", very fast diode.
Note: différance from schematic (we did not
    Reply   OEwaves CW Laser - Phase Noise , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
a correction on the wavelength of the laser  it is 1030 um 




Manar
Amer wrote:




We started measuring the phase noise on the OEwaves CW laser.

Class
    Reply   OEwaves CW Laser - Phase Noise , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
correction on unit 1030 nm




Manar
Amer wrote:



a correction on the wavelength of the laser  it is 1030 um 
Entry   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 20220706_Setup.jpgScreenshot_2022-07-06_1_181116.pngFinesse_Fit.jpg00mode.jpg00mode_diameter.jpg
The SBox cavity setup was changed to have only 2 mirrors M1 plane and M2 spherical, both from ThomX

Distance between the mirror ~ 72 cm , increased from 70 cm to take into account the thickness of the ThomX mirrors

Two lenses (300 mm @ 50 cm , 200 @ 104 cm) were placed to have the beam radius ~ 0.55 mm.
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpgScreenshot_2022-07-08_0_164115.pngSlide1.JPGSlide2.JPG
The cavity was realigned using irises instead of pinholes, gave a better alignment.

The inside of the box, the spherical and the injection mirror were cleaned and placed back inside the box.

we see beating of fundamental mode, previously at the transmission point we placed a wedge to split the beam which resulted in an elliptical
    Reply   2 Mirror Setup @ 216.6 MHz, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-08_2_182405.png
Update for Finesse measurement, The cavity was put under vacuum ~ 1.1*10^-1 mbar

and the alignment and coupling improved.

FSR = 210.1 MHz
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 00mode.jpg00mode_diameter.jpg00mode_diameter_fit.jpg
The FSR of the 2 mirror (plan-spherical) Cavity was adjusted from 210 MHz to reach 216.643 MHz

it was done by having two reference irises, one at the injection point and one at the reflection 

then changing the position of injection plan mirror to slightly closer distance and monitoring the reflection on the oscilloscope to be max.
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics Screenshot_2022-07-11_1_204143.pngScreenshot_2022-07-11_0_203646.png
Yesterday evening the cavity was Vacuum pumped up to pressure of 5.5*10^-2 and locked 

changed FSR to be 216.662 MHz and alignment a little and measured the Finesse

in Vacuum we have average Finesse = 30341.6265
    Reply   FSR change & Finesse Measurements , posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
a Finesse of 30k with the present mirrors :

T1=120 ppm ;A1=(2.6+1) ppm;
T2=1.5 ppm ;A2=(4.5+0.27) ppm;
    Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
To prepare for the amplifier. I installed the D-shapped mirrors after cleaning (using aceton and ethanol) between the cavity 2 mirrors.

Before closing, I observed the back reflection from M1 (injection mirror). both the injection and reflection lines were off, due to that there
was an internal reflection hitting the walls of the cavity.
    Reply   Installation of D-shaped mirror / Alignment, posted by Manar Amer at Optical room about lasers and optics | detectors and electronics 
The D-shaped mirrors are installed properly and not cutting the path of the beam.

The cavity has been aligned again and 00 modes beating observed, and external reference points has been placed.




Manar
Entry   Koheras CW laser lock on FP cavity, posted by Ronic Chiche at Optical room about lasers and optics | detectors and electronics 
I locked the Koheras CW on the FP cavity but the lock was pretty noisy and very difficult to acquire.

I tried to produce some modulation sidebands close to 216MHz to measure the Finesse but the power loss was very small so, the signal to extract
the Finesse would be unreadable !
Entry   100W CELIA laser amplifier "Power vs Pump current" curve, posted by Ronic Chiche at Optical room about lasers and optics | detectors and electronics CELIA_100W_amplifier_Power_vs_Current.png
We measured again the 100W CELIA laser amplifier with a pump current until 8A.

as the first current pump of the amplifier has a Peltier issue, we don't exceeded 6A on this stage and we compensated with the 3 other stages.

7A average current is obtained with 6A / 7.3A / 7.3A / 7.4A
Entry   Installation of the avalanche photodiode, posted by Ronic Chiche at Optical room about lasers and optics | detectors and electronics 
After installing the 2nd EOM, we had some trouble to be able to lock again.
One possible reason was the very low signal level in transmission, which is important to trigger the locking system (and stop it).

See the Alice post for details, but we were able to measure only once the Finesse of the cavity at around 2600.
Entry   Mightylaser Amplifier , posted by Manar Amer at Optical room about lasers and optics | cabling 
Migthylaser amplifier has been moved from the SBox table to the PLIC table.

 
Entry   Cavity polarization states (Koheras), Finesse of 2 polarization states, posted by Loïc Amoudry at Optical room about lasers and optics Finesse_higher.isfFinesse_lower.isfThe2polarizations_states_direct_trans.isfThe2polarizations_states_direct_trans.png
Measurments of Finesse with the 2 polarization states, let's call them H (higher) and L (lower): 24500 for the H and 23500 for the L.

We checked the polarization states in transmission of the FP cavity after a PBS. The H was stronger in PBS trans and the L stronger in PBS ref.

We measured the power in reflection of the PBS and added a half WP that we aligned with the PBS polarization. Then, to get the maximum power
Entry   Phase measurement with HASO, posted by Loïc Amoudry at Optical room about lasers and optics 180928_M2_0A.has1801001_input_0A.has180928_M2_trans_0A.txt
2 measurement.

First one locked, in transmission of M2 with 2nd stage 0A.Total 89 cm from the big waist (planar mirrors). 2 wedges used.

Second one at input beam with the same power. Datas taken at the same equivalent position than the first one. 3 wedges used.
    Reply   Phase measurement with HASO, posted by Loïc Amoudry at Optical room about lasers and optics 8x
* Loic has to fix the number of files (3) regarding the number of measurements (2)

* splitted Intensity and phase HASO files

* image for each file
    Reply   Phase measurement with HASO, posted by Loïc Amoudry at Optical room about lasers and optics 
with just intensity, the coupling is 98%, and with phase, x direction coupling is 95%, y direction 97%, so the telescope is good.




Loïc
Amoudry wrote:



* Loic has to fix the number of files (3) regarding the number of