  Toutes les notes concernant les Commissionning de ThomX, Page 9 of 61  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subject Icon Text Attachments
  Draft   Fri May 2 08:23:50 2025 VMUnder ProcessShift summaryRing Commissioning   08h22 ThomX was started: modulator, frig,
laser

08h28 Chillers was started, all
  
  1062   Wed Apr 30 08:51:08 2025 VC, DN, MJ, IC, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Recherche position image camera MRSV Start chauffage 9H

There were some problems: the phase
section motor was in the wrong position,
 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png 
  1061   Tue Apr 29 11:03:14 2025 Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025Under ProcessInfoLI | TL Data taking for ML  Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section,
ST1, ST2, Solenoid, QP1, QP2, QP3 
  
  1060   Mon Apr 28 17:13:58 2025 Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025Under ProcessInfoLI | TL Hayg / Thibault  

Position moteur actuels (on ne
les vois pas dans le log du shift Sophie/Vincent)
  
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling
all magnets
 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png 
  1058   Thu Apr 17 08:16:04 2025 VM, RC, DN, NDUnder ProcessShift summaryRing Commissioning   08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets
cycling
 health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg 
  1057   Wed Apr 16 13:48:05 2025 Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025Under ProcessShift summaryLI Beam study  Mesures du jour : prendre des images pour
refaire le calcul d'émittance
en tenant compte des corrélations
 Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png 
  Draft   Tue Apr 15 08:10:35 2025 KDUnder ProcessShift summaryDiag | Laser | Opt | Linac Commissionning | Ring Commissioning shift du 15 avril 2025 8h10 : mise en chauffe de la machine à
distance (modulateur, chiller/frigo, cyclage)

* redémarrage des DS client5
  
  1055   Fri Apr 11 08:52:07 2025 VC SC HGUnder ProcessShift summaryLI | Linac Commissionning | Ring Commissioning shift du 11 avril  demarrage chauffage 8hh50

faisceau sur Yag 1 depuis 1heure....

le script d'alignement solenoide
 align_soir.png 
  Draft   Thu Apr 10 09:03:35 2025 KD, HG, ND, ML, VMUnder ProcessShift summaryDiag | Linac Commissionning | Ring Commissioning shift du 10 avril 2025 9h : mise en chauffe en remote (frigo/Chiller,
Modulateur, laser, cyclage)

 
 Screenshot_from_2025-04-10_17-10-09.pngScreenshot_from_2025-04-10_17-09-56.png 
  1053   Tue Apr 8 10:11:31 2025 KDUnder ProcessShift summaryLI | TL | LE | Opt | Linac Commissionning shift du 8 avril 2024 10h10 : mise en chauffe machine (frigo/chiller,
modulateur, laser) + remise de SF6

recette sauvé pour 7MeV
 2025-04-08_17_34_45_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.pngcharge_transportee_7MeV.pngNote_technique_atténuateur_MEGA_industries_V3.pdf 
  Draft   Fri Apr 4 09:05:06 2025 ML, VM, DN, NDUnder ProcessShift summaryRing Prise de données 4/04 8:59 Mise en chauffe

9:15 Installation laser alignement
SR
 10x 
  1051   Thu Apr 3 09:08:03 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 3 avril 2025 9h: mise en chauffe machine en remote (Modulateur,
frigo/chiller, laser, cyclage aimants).
  
  Draft   Wed Apr 2 08:25:07 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025Under ProcessShift summaryLinac Commissionning | Ring Commissioning Programme mercredi 2/04 9h: mise en chauffe machine depuis bureau
(Modulateur, laser, frigo/chiller, cyclage
aimants)
 spectres_synchro_desynchro.png 
  Draft   Tue Apr 1 08:43:53 2025 VM, IC, DNUnder ProcessShift summaryRing Commissioning   08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
  
  1048   Mon Mar 31 09:53:26 2025 VM, IC, RCUnder ProcessShift summaryRing Commissioning   08h00 ThomX started by Maher

09h50 Problem with vacuum in the
septum. TL-V3 and EL-V1 are closed.
 Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png 
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
  1046   Fri Mar 28 14:27:01 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025 LinacLI Prep faisceau pour lundi 12h47 Mise en chauffe modulateur

Zone de stockage en rouge

Mise en route frigo, chillers :
  
  1045   Fri Mar 21 17:57:40 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025 Shift summaryLinac Commissionning | Ring Commissioning 21 mars - Mesures X-rays - Bravin & co Det
Photonic fond de la X-hutch


Tomo : un
  
  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help
  