  Toutes les notes concernant les Commissionning de ThomX, Page 10 of 62  Not logged in ThomX    logo
ID Date Author Status Type Category Important Subject Icon Text Attachments
  Draft   Fri May 2 08:23:50 2025 VMUnder ProcessShift summaryRing Commissioning   08h22 ThomX was started: modulator, frig,
laser

08h28 Chillers was started, all
  
  1062   Wed Apr 30 08:51:08 2025 VC, DN, MJ, IC, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning Recherche position image camera MRSV Start chauffage 9H

There were some problems: the phase
section motor was in the wrong position,
 2025-04-30_16-23-33_MRSV_fwhm_trends.png2025-04-30_17-14-26_total_beam.png2025-04-30_17-15-03_coupe_moitie_basse.png2025-04-30_17-15-54_coupe_moitie_haute.png 
  1061   Tue Apr 29 11:03:14 2025 Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025Under ProcessInfoLI | TL Data taking for ML  Demarrage ACQ pour ML 

Random : Phi_GUN, Phi_Section,
ST1, ST2, Solenoid, QP1, QP2, QP3 
  
  1060   Mon Apr 28 17:13:58 2025 Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025Under ProcessInfoLI | TL Hayg / Thibault  

Position moteur actuels (on ne
les vois pas dans le log du shift Sophie/Vincent)
  
  1059   Fri Apr 18 08:23:13 2025 VM, IC, NDFixedProblemLI Measurements 18/4 08h21 Thomx Started: modulator, frig, laser

08h27 Chillers started, cycling
all magnets
 Screenshot_from_2025-04-18_09-42-24.pnginjection_sequence_blank2ms_009.pnginjection_sequence_blank2ms_003.pnginjection_sequence_blank2ms_002.pnginjection_sequence_blank2ms_036.png 
  1058   Thu Apr 17 08:16:04 2025 VM, RC, DN, NDUnder ProcessShift summaryRing Commissioning   08h15 Start Thomx: modulator, frig, laser

08h21 Chillers started, all magnets
cycling
 health_check_Vide_Jauge_2025_04_17_09_25.pnghealth_check_RF_Redpitaya_2025_04_17_09_27.pngbpm_1_vs_kicker_second.pngviewer_2025_04_17_12_44_06.png20250417_175615.jpg 
  1057   Wed Apr 16 13:48:05 2025 Entered by Super Team from 134.158.195.142 on Wed Apr 16 13:47:52 2025Under ProcessShift summaryLI Beam study  Mesures du jour : prendre des images pour
refaire le calcul d'émittance
en tenant compte des corrélations
 Coil_Scan_BeamSize_Align_Ring_Ref_50MeV_Charge.pngCoil_Scan_BeamSize_Align_Ring_Ref_50MeV_YagTL1.pngSize_vs_SolenoScan_14-07-49.pngQ_vs_SolenoScan_14-07-50.pngFigure_2025-04-16_163405.png 
  Draft   Tue Apr 15 08:10:35 2025 KDUnder ProcessShift summaryDiag | Laser | Opt | Linac Commissionning | Ring Commissioning shift du 15 avril 2025 8h10 : mise en chauffe de la machine à
distance (modulateur, chiller/frigo, cyclage)

* redémarrage des DS client5
  
  1055   Fri Apr 11 08:52:07 2025 VC SC HGUnder ProcessShift summaryLI | Linac Commissionning | Ring Commissioning shift du 11 avril  demarrage chauffage 8hh50

faisceau sur Yag 1 depuis 1heure....

le script d'alignement solenoide
 align_soir.png 
  Draft   Thu Apr 10 09:03:35 2025 KD, HG, ND, ML, VMUnder ProcessShift summaryDiag | Linac Commissionning | Ring Commissioning shift du 10 avril 2025 9h : mise en chauffe en remote (frigo/Chiller,
Modulateur, laser, cyclage)

 
 Screenshot_from_2025-04-10_17-10-09.pngScreenshot_from_2025-04-10_17-09-56.png 
  1053   Tue Apr 8 10:11:31 2025 KDUnder ProcessShift summaryLI | TL | LE | Opt | Linac Commissionning shift du 8 avril 2024 10h10 : mise en chauffe machine (frigo/chiller,
modulateur, laser) + remise de SF6

recette sauvé pour 7MeV
 2025-04-08_17_34_45_tl_dg_sst_03-ccd_01_log_scale_False_despeckle_False_Auto_scale_True.pngcharge_transportee_7MeV.pngNote_technique_atténuateur_MEGA_industries_V3.pdf 
  Draft   Fri Apr 4 09:05:06 2025 ML, VM, DN, NDUnder ProcessShift summaryRing Prise de données 4/04 8:59 Mise en chauffe

9:15 Installation laser alignement
SR
 10x 
  1051   Thu Apr 3 09:08:03 2025 KDUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 3 avril 2025 9h: mise en chauffe machine en remote (Modulateur,
frigo/chiller, laser, cyclage aimants).
  
  Draft   Wed Apr 2 08:25:07 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025Under ProcessShift summaryLinac Commissionning | Ring Commissioning Programme mercredi 2/04 9h: mise en chauffe machine depuis bureau
(Modulateur, laser, frigo/chiller, cyclage
aimants)
 spectres_synchro_desynchro.png 
  Draft   Tue Apr 1 08:43:53 2025 VM, IC, DNUnder ProcessShift summaryRing Commissioning   08h42 Start ThomX: Morulator, firg, laser

08h47 Chillers, cycling all magnets

10h40 HV is 'ON'
  
  1048   Mon Mar 31 09:53:26 2025 VM, IC, RCUnder ProcessShift summaryRing Commissioning   08h00 ThomX started by Maher

09h50 Problem with vacuum in the
septum. TL-V3 and EL-V1 are closed.
 Screenshot_from_2025-03-31_18-06-59.pngScreenshot_from_2025-03-31_17-52-04.pngScreenshot_from_2025-03-31_17-14-56.png2025-03-31_10_40_04_li_dg_sst_01-ccd_01_RAW.png 
  1047   Mon Mar 31 09:46:56 2025 Entered by Super Team from 134.158.195.141 on Mon Mar 31 09:46:30 2025Not FixedProblemVide Problem with vacuum in the septum. TL-V3 and EL-V1 are closed. 09h45 Problem
with vacuum in the septum. TL-V3 and EL-V1
are closed.
  
  1046   Fri Mar 28 14:27:01 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025 LinacLI Prep faisceau pour lundi 12h47 Mise en chauffe modulateur

Zone de stockage en rouge

Mise en route frigo, chillers :
  
  1045   Fri Mar 21 17:57:40 2025 Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025 Shift summaryLinac Commissionning | Ring Commissioning 21 mars - Mesures X-rays - Bravin & co Det
Photonic fond de la X-hutch


Tomo : un
  
  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help
  