Entry   Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025; Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) 10x
*** Spectres des 4 Echantillons Bazin + Backgroung avec :


Cone en plomb pour pieger le faisceau - Ouverture : diametre hori ~ 1.5 , vert ~ 1.8 cm  (Ouverture fentes 2 :
hori =15 mm , vert =14 mm)
Beaucoup plus de stat


*** Trends de galerienne (trentaine
Entry   SC, ND;  pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png
8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images jointes.
Entry   ND; Prise donnees 4/7 temp_vs_time.pngtp2spX_vs_time.pngtp2spY_vs_time.pngpos_TL2_spX_vs_temp.png
Les aimants et les chillers etaient restes allumes.

11h59 Mise en chauffe

12h05 Cyclage aimants
Entry   IC, VM; BBA 
08h50 Warm up of the modulator
Entry   IC, VM; BBA Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png
8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase is 243 dg. Sect. Att. 0.119 dB, Charges: -112 pC, -113. pC, -140 pC. Linac steeres: H [1.00 -3.49], V[1.92
Entry   ND; Verifications IHM_cyclage 
9:00 Accès pour FPC

Recherche des problemes de plantage de l'IHM cyclage.

Plantages difficiles a reproduire (pas de plantage quand j'essaie).
Entry   ND, VM; Prise de données 10/10  7x
9:00 Mise en chauffe

9:20 Intervention de deux personnes de Dalkia dans l'igloo. 

9h30 Cyclage aimants
Entry   MO VC ND VM; Shift summary 
demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
Entry   HG, DN. VM, MJ;  mrsv_2_positions_fente.png
11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
Entry   Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025;  Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png
Matin :

Soucis synchro :
- Nicolas les a redémarré
Entry   Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025; Preparation/check of the 70 MeV WP for X-ray run Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png
Goal: preparation and checking the machine operation at 70 MeV and 40 MeV (ideally with X-rays)

8h54 Warming up
RF section 29.20 C -> 28.5 C
Entry   Marie Julien Hayg Sophie; Matching ring-TL - Recherche des bons twiss pour la TL Screenshot_from_2025-12-05_18-26-56.png
Programme shift : etudes matching anneau-TL - Recherche param twiss TL

Valeurs ideales TL "de Julien" : betaX = 36   betaY = 36   alphaX = -4.5   alphaY
= -4.5  ( = figure of merit tres petit)
Entry   DN, IC, HG, KD, MJ, and Co; X-ray measurement/characterization campaign Q_missed_2025-12-18_13-50-19.png
The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
Entry   MJ; shift twiss Q1 versus soleno 
Modulateur en chauffe
Alarme rendant impossible clim casemate . Maher envoie un mail a urgencevc
Check Sf6 : 2 bar ==> Appel JN ==> ajout sf6 2.5 bar
Entry   IC; Ring studies 
9h40: mise en chauffe (chillers/frigo, modulateur, cyclage)

HV ON

The ICT signal (GUN) is frozen. Need help to restart it. Use the BPM SpSum instead.
Entry   IC, VM;  
08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

08h15: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

09h19 HV is on
icon1.gif   MJ VM DN RC HG; Etudes matching  
Mesures : Spectres et taille source X + Quads scans associées, @ 

** Sol 230 100pC 

** Sol 242 100pC
Entry   Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026; Restart after strange last shift  
12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen put last motor positions (2266 && 4158) --> No spot on screen :(
13h05 : Gun activities incresed (Vac > 1e-7 && reflected power)
Entry   Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026;  
08h32 Warm-up ThomX: Modulator, Laser, Fridge

08h37 Chillers were started, cycling all magnets

09h48 HV is ON
Entry   Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026; , entered from 127.0.0.1 
7h45: mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

8h46 The photocathode laser image on the camera is very weak, I can't initiate feedback. Help needed.

08h56 HV is on