Entry   Entered by Super Team from 127.0.0.1 on Wed Mar 25 07:28:09 2026; Ring studies 
7h30 : mise en chauffe en remote (frigo/chiller, modulateur, laser, cyclage)

08h40 HV ON

==> 50 MeV, Manual phase shifter value set to 3209. Sect. temperatute set to 30C at clarinette, (consigne = 29.2C).
Entry   7h50 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage); , entered from 127.0.0.1 
7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

8h30 HV is ON

recipe_recipe_LI_TL_RI_all_20260402_14_37_41.txt loaded
Entry   IC,VM; Beam studies. preparation for 40 MeV 
8h00 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

10h Problem with modulator; It went to OFF and it does not start. Need help;

12h40 Fixed by Maher
Entry   Entered by Super Team from 127.0.0.1 on Thu Apr 16 07:32:14 2026; , entered from 127.0.0.1 Screenshot_from_2026-04-16_20-53-14.pngScreenshot_from_2026-04-16_20-53-34.png
7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

9h00 HV is ON

10h33 Energy = 50 MeV, Laser Phase 77 dg., Sect. Phase 217 dg., Sect. Att. 2.546 dB, I_Gun -98.9021 pC, I_Linac -131.1291 pC, I_TL -120.2702
Entry   IC,VM, HG, RC, DN; beam studies. FPC.  
7h30 : mise en chauffe en remote (frigo/chillers, modulateur, laser, cyclage)

08h45 HV is on

Laser camera does not work. Help!!!
Entry   IC;  
10h30 : mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

All rondes are broken, THOMX key is turned. What is the reason of this intervention?,  There is nobody around. Jean-Noel came and helped
to solve the problems.
Entry   IC,VM;  
Dalkia solved the problem with vooling circuit in the morning

10h15 mise en chauffe  (frigo/chillers, modulateur, laser, cyclage)

11h16 HV is ON
Entry   IC, VM;  
9h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
Entry   Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026; , entered from 127.0.0.1 
8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)
Entry   IC, HG, JNC; Restart of the accelerator 
02/06/2026

~15h30 Starting all system

16h Start up of the modulator, laser, magnets
Entry   Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026;  
10h02 Start-up modulator, laser, fridge, chillers

The SF6 pressure is low. Magnet power supplies filed to start.

11h17 Stop ThomX