580
|
Fri Oct 7 11:57:24 2022 |
IC, VM, VK, AL, JH | Under Process | Shift summary | Ring Commissioning |
|
Optimization of the ring | | Start of the modulator at 9h45
11h30 Problem with water regulation.
Probably falseread of GUN PT100. Hayg and |
6x | |
599
|
Fri Oct 21 08:12:27 2022 |
VC VK IC | Under Process | Shift summary | Ring Commissioning |
|
Commissionning | | 8H15 demarrage chauffage Klystron et chiller
9h15 bunker ouvert (intervention
société extérieure jusqu'à |
| |
624
|
Fri Nov 4 18:28:58 2022 |
VK, VM, IC, KD | | Shift summary | Ring Commissioning |
|
Ring commissioning | | Start of the machine by KD
11h20 The beam is in the ring
Optimization of the injection with |
7x | |
648
|
Fri Dec 9 08:24:20 2022 |
KD | Under Process | Shift summary | Ring Commissioning |
|
shift du 9 decembre 2022 | | 8h25 : Mise en chauffe (pression eau toujours
OK)
Intervention casemate : |
| |
666
|
Thu Jan 12 08:55:33 2023 |
SC/ND/IC/VK/VM | | Anneau | Ring Commissioning |
|
Faisceau | | Mise en chauffe modulateur et refroidissements
Résistivité : 3.53
MOhm et Pression eau : 3.7 |
11x | |
Draft
|
Thu Feb 23 10:08:35 2023 |
ND, VK, VM | Under Process | Shift summary | Ring Commissioning |
|
Shift 23/2 | | 9h22 mise en chauffe
Pb site elog; autres sites web |
9x | |
716
|
Thu Mar 16 10:15:13 2023 |
ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot | New Solution | Shift summary | Ring Commissioning |
|
Prise de donnee 16/3/2023 | | 9:15 Mise en chauffe
10:30 Ronde casemate
10:40 Start beam |
17x | |
717
|
Fri Mar 17 08:55:42 2023 |
IC, VM, VK, ND | | Shift summary | Ring Commissioning |
|
RIng commissioning | | 8:50 Mise en chauffe
10h Starting the beam
Tuning of the TL |
10x | |
748
|
Thu May 4 11:41:53 2023 |
VK, VM, IC, LS | | Shift summary | Ring Commissioning |
|
Restart storage in the Ring | | ~9h Start of the modulator
10h Tuning of the injector with
KD |
| |
750
|
Fri May 5 08:47:28 2023 |
KD VM VK JN SL | Under Process | Shift summary | Ring Commissioning |
|
shift du 5 mai 2023 | | 8h30 : accès casemate controlé
==> septum et kickers OFF et
cavité RF OFF |
    | |
751
|
Mon May 15 11:31:43 2023 |
ND, LS, IC, VK, VM, SW | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 15/5 | | 10:00 Machine warm up
Magnets cycling
11:00 Start machine |
7x | |
752
|
Tue May 16 10:28:43 2023 |
LS, ND, IC, VK | Under Process | Shift summary | Ring Commissioning |
|
Ring operation 16/5 | | 9:33 Start warming up
9:45 Ducre is working on the plumbing
but it shuld not affect operations |
   | |
753
|
Wed May 17 09:16:47 2023 |
VK, IC. AL | | Shift summary | Ring Commissioning |
|
Understanding of the shift in RF frequency | | 8:40 Start warming up, problem with PSS.
It was restarted.
Problems to start and tune the |
18x | |
754
|
Fri May 19 18:05:29 2023 |
VK, IC | | Shift summary | Ring Commissioning |
|
RF frequency of the Ring | | In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the |
   | |
758
|
Fri May 26 13:56:17 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Studies on the beam revolution frequency | | The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer. |
12x | |
760
|
Wed May 31 14:46:21 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
Studies on the Ring revolution frequency | | Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles. |
8x | |
761
|
Wed May 31 21:36:49 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
RE: Studies on the Ring revolution frequency | | Bonjour,
Pouvez vous enregistrer les images
de l'oscilloscope et le donnée |
| |
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | | Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit. |
    | |
769
|
Tue Jun 13 18:06:14 2023 |
VK, IC. VM, ND, LS | | Shift summary | Ring Commissioning |
|
beam storage | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
   | |
770
|
Wed Jun 14 18:18:32 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Srart of the beam physics measurements | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
14x |
|