  580   Fri Oct 7 11:57:24 2022 IC, VM, VK, AL, JHUnder ProcessShift summaryRing Commissioning Optimization of the ring Start of the modulator at 9h45

11h30 Problem with water regulation.
Probably falseread of GUN PT100. Hayg and
 6x 
  599   Fri Oct 21 08:12:27 2022 VC VK ICUnder ProcessShift summaryRing Commissioning Commissionning 8H15 demarrage chauffage Klystron et chiller

9h15 bunker ouvert (intervention
société extérieure jusqu'à
  
  624   Fri Nov 4 18:28:58 2022 VK, VM, IC, KD Shift summaryRing Commissioning Ring commissioning Start of the machine by KD

11h20 The beam is in the ring

Optimization of the injection with
 7x 
  648   Fri Dec 9 08:24:20 2022 KDUnder ProcessShift summaryRing Commissioning shift du 9 decembre 2022 8h25 : Mise en chauffe (pression eau toujours
OK)

 Intervention casemate :
  
  666   Thu Jan 12 08:55:33 2023 SC/ND/IC/VK/VM AnneauRing Commissioning Faisceau  Mise en chauffe modulateur et refroidissements

Résistivité : 3.53
MOhm et Pression eau : 3.7
 11x 
  Draft   Thu Feb 23 10:08:35 2023 ND, VK, VMUnder ProcessShift summaryRing Commissioning Shift 23/2 9h22 mise en chauffe

 

Pb site elog; autres sites web
 9x 
  716   Thu Mar 16 10:15:13 2023 ND, Enzo Crou, Noé Idesheim, Jean-Nicolas QuenotNew SolutionShift summaryRing Commissioning Prise de donnee 16/3/2023 9:15 Mise en chauffe

10:30 Ronde casemate

10:40 Start beam
 17x 
  717   Fri Mar 17 08:55:42 2023 IC, VM, VK, ND Shift summaryRing Commissioning RIng commissioning 8:50 Mise en chauffe

10h Starting the beam

Tuning of the TL
 10x 
  748   Thu May 4 11:41:53 2023 VK, VM, IC, LS Shift summaryRing Commissioning Restart storage in the Ring ~9h Start of the modulator

10h Tuning of the injector with
KD
  
  750   Fri May 5 08:47:28 2023 KD VM VK JN SLUnder ProcessShift summaryRing Commissioning shift du 5 mai 2023 8h30 : accès casemate controlé 

==> septum et kickers OFF et
cavité RF OFF
 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png 
  751   Mon May 15 11:31:43 2023 ND, LS, IC, VK, VM, SWUnder ProcessShift summaryRing Commissioning Ring operation 15/5 10:00 Machine warm up

Magnets cycling

11:00 Start machine
 7x 
  752   Tue May 16 10:28:43 2023 LS, ND, IC, VKUnder ProcessShift summaryRing Commissioning Ring operation 16/5 9:33 Start warming up

9:45 Ducre is working on the plumbing
but it shuld not affect operations
 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png 
  753   Wed May 17 09:16:47 2023 VK, IC. AL Shift summaryRing Commissioning Understanding of the shift in RF frequency 8:40 Start warming up, problem with PSS.
It was restarted.

Problems to start and tune the
 18x 
  754   Fri May 19 18:05:29 2023 VK, IC Shift summaryRing Commissioning RF frequency of the Ring In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the
 scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png 
  758   Fri May 26 13:56:17 2023 VK, IC. VM, LS Shift summaryRing Commissioning Studies on the beam revolution frequency The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer.
 12x 
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  761   Wed May 31 21:36:49 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning RE: Studies on the Ring revolution frequency Bonjour,

Pouvez vous enregistrer les images
de l'oscilloscope et le donnée
  
  763   Mon Jun 12 14:52:39 2023 VK, IC. VM Shift summaryRing Commissioning Reestablishing running conditions at 500.38 MHz Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit.
 scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png 
  769   Tue Jun 13 18:06:14 2023 VK, IC. VM, ND, LS Shift summaryRing Commissioning beam storage The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png 
  770   Wed Jun 14 18:18:32 2023 VK, IC. VM Shift summaryRing Commissioning Srart of the beam physics measurements The main idea fo this week is to
prepare the beam for the search of the first
X-rays.