8H15 demarrage chauffage Klystron et chiller
9h15 bunker ouvert (intervention société extérieure jusqu'à 9H30)
10H injection dans l'anneau avec recette 20221020-1420
14.20 come back to shift after seminar
-adjust TL 154.7 and Ring dipoles 156.56
- injection optimization with RCDS . 7parameters: dpi, Kicker, Septum, H,V steeres 3 and 4 of TL
- orbit correction
-data taking
ri-c2 /BPM 01-Lib04, need to be checked. Horizontal Orbit is always around 4 mm at that position.
|