  Toutes les notes concernant les Commissionning de ThomX, Page 5 of 62  Not logged in ThomX    logo
Entry   IC, VM, VK, AL, JH; Optimization of the ring 6x
Entry   VC VK IC; Commissionning 
Entry   VK, VM, IC, KD; Ring commissioning 7x
Entry   KD; shift du 9 decembre 2022 
Entry   SC/ND/IC/VK/VM; Faisceau  11x
Entry   ND, VK, VM; Shift 23/2 9x
Entry   ND, Enzo Crou, Noé Idesheim, Jean-Nicolas Quenot; Prise de donnee 16/3/2023 17x
Entry   IC, VM, VK, ND; RIng commissioning 10x
Entry   VK, VM, IC, LS; Restart storage in the Ring 
Entry   KD VM VK JN SL; shift du 5 mai 2023 Screenshot_from_2023-05-05_17-25-28.pngScreenshot_from_2023-05-05_17-13-31.pngScreenshot_from_2023-05-05_17-13-41.pngScreenshot_from_2023-05-05_17-52-52.pngScreenshot_from_2023-05-05_17-50-31.png
Entry   ND, LS, IC, VK, VM, SW; Ring operation 15/5 7x
Entry   LS, ND, IC, VK; Ring operation 16/5 health_check_2023_05_16_12_02.pngscan_charge_phase_min_0.0_max_360.0_12_8_7.png2023-05-16_12_13_52_tl_dg_sst_02-ccd_01_log_scale_False_despeckle_False_min_scale_0_max_scale_100.pngring_storage_quality__2023_05_16_16_06.png
Entry   VK, IC. AL; Understanding of the shift in RF frequency 18x
Entry   VK, IC; RF frequency of the Ring scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png
Entry   VK, IC. VM, LS; Studies on the beam revolution frequency 12x
Entry   ND, LS, IC, VK, VM; Studies on the Ring revolution frequency 8x
    Reply   ND, LS, IC, VK, VM; RE: Studies on the Ring revolution frequency 
Entry   VK, IC. VM; Reestablishing running conditions at 500.38 MHz scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png
Entry   VK, IC. VM, ND, LS; beam storage closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png
Entry   VK, IC. VM; Srart of the beam physics measurements 14x