  754   Fri May 19 18:05:29 2023 VK, IC Shift summaryRing Commissioning RF frequency of the Ring In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the
 scan_charge_phase_min_0.0_max_360.0_10_43_35.pngScreenshot_from_2023-05-19_13-50-56.pngScreenshot_from_2023-05-19_13-56-41.pngScreenshot_from_2023-05-19_12-15-50.png 
  756   Tue May 23 11:36:24 2023 LS, ND Shift summaryLI | Diag Prise de donnees 23/05 9:30 Demarrage machine

Fin installation Cerenkov + tests
MRSV
 IMG_20230523_110343_8_copy_780x1040-20230523-164911728-20230523-164911770.jpg 
  757   Thu May 25 15:08:18 2023 NC,IC, VM,lS Shift summaryRing   9:10 warm up modulator

10:30: cycling of magnets

10:20 : scan charge phase
 ring_storage_quality__2023_05_25_15_10_phase_scan_frm_1000_atx300_to_2500_at_x360.pngring_storage_quality__2023_05_25_15_31_phase_scan_from_0_atx300_to_250_atx3230_30kV.pngring_storage_quality__2023_05_25_15_39_phase_scan_from_0_atx4320_to_2500_atx4470_35kV.png 
  758   Fri May 26 13:56:17 2023 VK, IC. VM, LS Shift summaryRing Commissioning Studies on the beam revolution frequency The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer.
 12x 
  760   Wed May 31 14:46:21 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning Studies on the Ring revolution frequency Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles.
 8x 
  761   Wed May 31 21:36:49 2023 ND, LS, IC, VK, VM Shift summaryRing Commissioning RE: Studies on the Ring revolution frequency Bonjour,

Pouvez vous enregistrer les images
de l'oscilloscope et le donnée
  
  763   Mon Jun 12 14:52:39 2023 VK, IC. VM Shift summaryRing Commissioning Reestablishing running conditions at 500.38 MHz Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit.
 scan_charge_phase_min_0.0_max_360.0_14_32_59.pngScreenshot_from_2023-06-12_15-23-07.pngScreenshot_from_2023-06-12_15-40-14.pngScreenshot_from_2023-06-12_17-38-24.pngScreenshot_from_2023-06-12_17-32-48.png 
  769   Tue Jun 13 18:06:14 2023 VK, IC. VM, ND, LS Shift summaryRing Commissioning beam storage The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 closed_orbit_13062023.pngScreenshot_from_2023-06-13_18-27-36.pngScreenshot_from_2023-06-13_18-25-45.pngScreenshot_from_2023-06-13_17-23-16_WO_RF.png 
  770   Wed Jun 14 18:18:32 2023 VK, IC. VM Shift summaryRing Commissioning Srart of the beam physics measurements The main idea fo this week is to
prepare the beam for the search of the first
X-rays.
 14x 
  771   Thu Jun 15 17:46:40 2023 VK, IC. VM Shift summaryRing Commissioning Orbit correction, BLM in the Ring The BLM detector boxes were installed in
the ring. We connected 3 fibers and 2 scintillator
detectors in th ring to be able to observe
 7x 
  772   Fri Jun 16 09:36:07 2023 VK, IC. VM, AL, ND, LS Shift summaryRing Commissioning Orbit correction, optimization of the storage, study of the RF frequency 9h30 Start of the modulator and lasser
(GATE is closed).

9h46 Data is taken as background.
 8x 
  774   Thu Jun 22 11:43:35 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023 Shift summaryLinac Commissionning | Ring Commissioning Bruit de fond diodes ligneX    2023-06-22-bruit-de-fond-diodes-ligneX.pdf 
  775   Thu Jun 22 19:39:58 2023 Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023 Shift summaryLinac Commissionning | Ring Commissioning recherche IP e-/laser ** Au vu de ce shift tres instructif
d'aujourd'hui, pour demain:

1)
  
  Draft   Fri Jun 23 09:47:54 2023 VK, IC, DN, RC, JN Shift summaryRing Commissioning search for X-rays 8h30 Start of the modumator, laser, magnet
cycling

9h45 Beam is ON. Scan charge vs.
  
  777   Fri Jun 23 13:56:03 2023 all Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning X detectes aujourd'hui Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec)
 2023-06-23-Shift.pdf 
  781   Mon Jul 3 14:54:09 2023 SC/CB/JNC Shift summaryLI run du 3 juillet 2023 9h30 Intervention Maher pour dosimètre

10h00 Mise en chauffe modulateur
et refroidissements
 coil2scan_18h06.pngcoil2scan_18h06.png 
  782   Tue Jul 4 08:56:04 2023 SC/CB/ME LinacLI | RF Anneau | Linac Commissionning Faisceau linac et cavite RF 8h55 Démarrage modulateur et refroidissements

Intervention SPR terminé

Solenoide = 190A, pas de quadrupoles,
  
  783   Mon Jul 24 16:29:07 2023 ND,LS, KD, JNC Shift summaryLI | TL Shift du 24/07/2023 10h: Accès casemate

Ajout de deux cables près
de TL/ICT.02, un jouant le role d'antenne
  
  786   Fri Jul 28 17:06:02 2023 VK, IC. VM, LS, JNC Shift summaryRing Commissioning Test of the new optics (27-28 July) Start of the modulator and laser at ~9h
and hour later start the beam.

Working at 500.38 MHz to retrieve
 6x 
  787   Mon Jul 31 16:57:11 2023 VK, IC. VM, LS Shift summaryRing Commissioning Work on the new optics 9h30 Start of the modulator and laser

Start of the beam. Problem with
charge, the max charge at the end of the
  