754
|
Fri May 19 18:05:29 2023 |
VK, IC | | Shift summary | Ring Commissioning |
|
RF frequency of the Ring | | In the morning, after the start-up pf the
machine, scan phase-charge and small tuning
it was possible to store the beam with the |
   | |
756
|
Tue May 23 11:36:24 2023 |
LS, ND | | Shift summary | LI | Diag |
|
Prise de donnees 23/05 | | 9:30 Demarrage machine
Fin installation Cerenkov + tests
MRSV |
| |
757
|
Thu May 25 15:08:18 2023 |
NC,IC, VM,lS | | Shift summary | Ring |
|
| | 9:10 warm up modulator
10:30: cycling of magnets
10:20 : scan charge phase |
  | |
758
|
Fri May 26 13:56:17 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Studies on the beam revolution frequency | | The main task for today is to measure the
revolution frequency without RF cavity with
the spectrum analyzer. |
12x | |
760
|
Wed May 31 14:46:21 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
Studies on the Ring revolution frequency | | Goal: understanding of teh beam natural
revolution frequency. Study the effect of
the dipoles. |
8x | |
761
|
Wed May 31 21:36:49 2023 |
ND, LS, IC, VK, VM | | Shift summary | Ring Commissioning |
|
RE: Studies on the Ring revolution frequency | | Bonjour,
Pouvez vous enregistrer les images
de l'oscilloscope et le donnée |
| |
763
|
Mon Jun 12 14:52:39 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Reestablishing running conditions at 500.38 MHz | | Goal of the shift: Reestablish the good
storage at 500.38 and then try to optimize
the storage and orbit. |
    | |
769
|
Tue Jun 13 18:06:14 2023 |
VK, IC. VM, ND, LS | | Shift summary | Ring Commissioning |
|
beam storage | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
   | |
770
|
Wed Jun 14 18:18:32 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Srart of the beam physics measurements | | The main idea fo this week is to
prepare the beam for the search of the first
X-rays. |
14x | |
771
|
Thu Jun 15 17:46:40 2023 |
VK, IC. VM | | Shift summary | Ring Commissioning |
|
Orbit correction, BLM in the Ring | | The BLM detector boxes were installed in
the ring. We connected 3 fibers and 2 scintillator
detectors in th ring to be able to observe |
7x | |
772
|
Fri Jun 16 09:36:07 2023 |
VK, IC. VM, AL, ND, LS | | Shift summary | Ring Commissioning |
|
Orbit correction, optimization of the storage, study of the RF frequency | | 9h30 Start of the modulator and lasser
(GATE is closed).
9h46 Data is taken as background. |
8x | |
774
|
Thu Jun 22 11:43:35 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 11:43:12 2023 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Bruit de fond diodes ligneX | | |
| |
775
|
Thu Jun 22 19:39:58 2023 |
Entered by Marie Jacquet from 134.158.89.45 on Thu Jun 22 19:39:22 2023 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
recherche IP e-/laser | | ** Au vu de ce shift tres instructif
d'aujourd'hui, pour demain:
1) |
| |
Draft
|
Fri Jun 23 09:47:54 2023 |
VK, IC, DN, RC, JN | | Shift summary | Ring Commissioning |
|
search for X-rays | | 8h30 Start of the modumator, laser, magnet
cycling
9h45 Beam is ON. Scan charge vs. |
| |
777
|
Fri Jun 23 13:56:03 2023 |
all | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning |
|
X detectes aujourd'hui | | Aujourd'hui on a detecte des X en mode
desynchro (notre signal correspond a ~ 3.10**6
ph/sec) |
| |
781
|
Mon Jul 3 14:54:09 2023 |
SC/CB/JNC | | Shift summary | LI |
|
run du 3 juillet 2023 | | 9h30 Intervention Maher pour dosimètre
10h00 Mise en chauffe modulateur
et refroidissements |
 | |
782
|
Tue Jul 4 08:56:04 2023 |
SC/CB/ME | | Linac | LI | RF Anneau | Linac Commissionning |
|
Faisceau linac et cavite RF | | 8h55 Démarrage modulateur et refroidissements
Intervention SPR terminé
Solenoide = 190A, pas de quadrupoles, |
| |
783
|
Mon Jul 24 16:29:07 2023 |
ND,LS, KD, JNC | | Shift summary | LI | TL |
|
Shift du 24/07/2023 | | 10h: Accès casemate
Ajout de deux cables près
de TL/ICT.02, un jouant le role d'antenne |
| |
786
|
Fri Jul 28 17:06:02 2023 |
VK, IC. VM, LS, JNC | | Shift summary | Ring Commissioning |
|
Test of the new optics (27-28 July) | | Start of the modulator and laser at ~9h
and hour later start the beam.
Working at 500.38 MHz to retrieve |
6x | |
787
|
Mon Jul 31 16:57:11 2023 |
VK, IC. VM, LS | | Shift summary | Ring Commissioning |
|
Work on the new optics | | 9h30 Start of the modulator and laser
Start of the beam. Problem with