  1092   Tue Jun 24 18:33:20 2025 Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025 Shift summaryLI | TL | LE | Ring Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) *** Spectres
des 4 Echantillons Bazin + Backgroung avec
:
 10x 
  1095   Fri Jun 27 08:49:36 2025 SC, ND LinacLI | Linac Commissionning   8h49 allumage modulateur, chiller, laser

10h00 Beam ON

Prise de données Cf images
 pos_TL2_vs_phase_RF.pngpos_TL2_spX_vs_temp.pngtp2spX_vs_time.png 
  1099   Fri Jul 4 12:02:34 2025 ND Shift summaryTL Prise donnees 4/7 Les aimants et les chillers etaient restes
allumes.

11h59 Mise en chauffe
 temp_vs_time.pngtp2spX_vs_time.pngtp2spY_vs_time.pngpos_TL2_spX_vs_temp.png 
  Draft   Thu Sep 11 08:49:20 2025 IC, VM  Ring BBA 08h50 Warm up of the modulator   
  Draft   Thu Sep 11 11:12:36 2025 IC, VM  Ring BBA 8h50 Thomx warmup

10h20 HV is 'ON'

RF Gun phase is 254 dg. Sect phase
 Screenshot_from_2025-09-11_12-57-22.pngScreenshot_from_2025-09-11_17-36-53.pngScreenshot_from_2025-09-11_17-47-30.png 
  1129   Fri Sep 26 09:01:14 2025 ND Shift summaryLI | Diag Verifications IHM_cyclage 9:00 Accès pour FPC

Recherche des problemes de plantage
de l'IHM cyclage.
  
  1135   Fri Oct 10 09:20:34 2025 ND, VM Shift summaryDiag | SY Prise de données 10/10  9:00 Mise en chauffe

9:20 Intervention de deux personnes
de Dalkia dans l'igloo. 
 7x 
  1139   Fri Oct 17 09:07:03 2025 MO VC ND VM Shift summaryLI | TL | LE | Linac Commissionning Shift summary demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC
  
  Draft   Tue Oct 21 12:29:35 2025 HG, DN. VM, MJ      11h40 Thomx warm-up

12h35 HV is ON

12h40 HV 1215 V
 mrsv_2_positions_fente.png 
  Draft   Wed Nov 5 12:50:55 2025 Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025      Matin :

Soucis synchro :
- Nicolas les a redémarré
 Screenshot_from_2025-11-05_17-49-33.pngScreenshot_from_2025-11-05_17-51-14.pngScreenshot_from_2025-11-05_17-50-44.png 
  1162   Thu Dec 4 08:59:07 2025 Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 Shift summaryLI | TL | Ring Preparation/check of the 70 MeV WP for X-ray run Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays)
 Screenshot_from_2025-12-04_16-10-14.pngScreenshot_from_2025-12-04_17-38-20.pngScreenshot_from_2025-12-04_18-01-39_WITH_EL.png 
  1164   Fri Dec 5 14:48:46 2025 Marie Julien Hayg Sophie Shift summaryLI | TL | LE | Ring Matching ring-TL - Recherche des bons twiss pour la TL Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL
 Screenshot_from_2025-12-05_18-26-56.png 
  Draft   Thu Dec 18 09:39:38 2025 DN, IC, HG, KD, MJ, and Co Shift summaryLI | TL | LE | Ring | Diag | Aimants | Laser | Vide | Linac Commissionning | Ring Commissioning X-ray measurement/characterization campaign The machine was warmed up remotemy

The FPC is ready. The laser is locked.

9h Start HV
 Q_missed_2025-12-18_13-50-19.png 
  1174   Mon Jan 5 10:35:58 2026 MJ Shift summaryLI | TL | LE | Ring shift twiss Q1 versus soleno Modulateur en chauffe
Alarme rendant impossible clim casemate
. Maher envoie un mail a urgencevc
  
  Draft   Mon Feb 23 09:43:36 2026 IC    Ring studies 9h40: mise en chauffe (chillers/frigo,
modulateur, cyclage)

HV ON
  
  Draft   Thu Feb 26 08:18:00 2026 IC, VM      08h15: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

08h15: mise en chauffe en remote
  
  1203   Thu Mar 5 13:19:22 2026 MJ VM DN RC HG Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Etudes matching icon1.gif Mesures : Spectres et taille source
X + Quads scans associées, @
  
  Draft   Mon Mar 9 12:55:30 2026 Entered by Super Team from 127.0.0.1 on Mon Mar 9 12:55:16 2026    Restart after strange last shift  12h55 : Vacuum level OK after TRIG ON
13h00 : Laser ON : no spot on screen
put last motor positions (2266 &&
  
  Draft   Fri Mar 13 08:33:25 2026 Entered by Super Team from 127.0.0.1 on Fri Mar 13 08:33:09 2026      08h32 Warm-up ThomX: Modulator, Laser,
Fridge

08h37 Chillers were started, cycling
  
  Draft   Thu Mar 19 07:46:50 2026 Entered by Super Team from 127.0.0.1 on Thu Mar 19 07:46:39 2026    , entered from 127.0.0.1 7h45: mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)

8h46 The photocathode laser image
  