1045
|
Fri Mar 21 17:57:40 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri Mar 21 17:57:25 2025 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
21 mars - Mesures X-rays - Bravin & co | | Det
Photonic fond de la X-hutch
Tomo : un |
|
|
1046
|
Fri Mar 28 14:27:01 2025 |
Entered by Super Team from 134.158.195.141 on Fri Mar 28 14:26:38 2025 | | Linac | LI |
|
Prep faisceau pour lundi | | 12h47 Mise en chauffe modulateur
Zone de stockage en rouge
Mise en route frigo, chillers : |
|
|
1064
|
Fri May 2 17:47:18 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 2 17:47:04 2025 | | Shift summary | Linac Commissionning | Ring Commissioning |
|
Commissioning Spectro Vortex/FalconX | | 1) Setup (pj 1) : petite sphere "jaune"
devant le vortex (je ne sais pas en quoi
elle est faite, peut-etre un laiton ...) |
  |
|
1074
|
Wed May 21 12:16:11 2025 |
MJ HG | | Shift summary | Linac Commissionning |
|
Axes Q1Q3 et Section apres chang cathode | | iris 0.5
100 pC
ph ch max 259 |
|
|
1077
|
Fri May 23 18:54:22 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 | | Shift summary | LI | Ring |
|
Spectro Si VORTEX : Calibration | | Le spectro Si (vortex/falconX) a ete calibre
avec une feuille d'etain
Calib checkee avec une feuille |
|
|
1087
|
Wed Jun 11 08:46:58 2025 |
Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 | | Shift summary | LI | Ring |
|
2025-06-04 Fluo-spectro : Spectre du 2025-06-04 | | |
|
|
1092
|
Tue Jun 24 18:33:20 2025 |
Entered by Marie Jacquet from 134.158.205.58 on Tue Jun 24 18:33:05 2025 | | Shift summary | LI | TL | LE | Ring |
|
Spectres Bazin - Config "cone en plomb" - + enregistrement trends parametres machine (e- et X) | | *** Spectres
des 4 Echantillons Bazin + Backgroung avec
: |
10x |
|
1095
|
Fri Jun 27 08:49:36 2025 |
SC, ND | | Linac | LI | Linac Commissionning |
|
| | 8h49 allumage modulateur, chiller, laser
10h00 Beam ON
Prise de données Cf images |
  |
|
1099
|
Fri Jul 4 12:02:34 2025 |
ND | | Shift summary | TL |
|
Prise donnees 4/7 | | Les aimants et les chillers etaient restes
allumes.
11h59 Mise en chauffe |
   |
|
Draft
|
Thu Sep 11 08:49:20 2025 |
IC, VM | | | Ring |
|
BBA | | 08h50 Warm up of the modulator |
|
|
Draft
|
Thu Sep 11 11:12:36 2025 |
IC, VM | | | Ring |
|
BBA | | 8h50 Thomx warmup
10h20 HV is 'ON'
RF Gun phase is 254 dg. Sect phase |
  |
|
1129
|
Fri Sep 26 09:01:14 2025 |
ND | | Shift summary | LI | Diag |
|
Verifications IHM_cyclage | | 9:00 Accès pour FPC
Recherche des problemes de plantage
de l'IHM cyclage. |
|
|
1135
|
Fri Oct 10 09:20:34 2025 |
ND, VM | | Shift summary | Diag | SY |
|
Prise de données 10/10 | | 9:00 Mise en chauffe
9:20 Intervention de deux personnes
de Dalkia dans l'igloo. |
7x |
|
1139
|
Fri Oct 17 09:07:03 2025 |
MO VC ND VM | | Shift summary | LI | TL | LE | Linac Commissionning |
|
Shift summary | | demarrage machine 8H35
9H45 hV on 1215V
Q linac 100pC |
|
|
Draft
|
Tue Oct 21 12:29:35 2025 |
HG, DN. VM, MJ | | | |
|
| | 11h40 Thomx warm-up
12h35 HV is ON
12h40 HV 1215 V |
|
|
Draft
|
Wed Nov 5 12:50:55 2025 |
Entered by Super Team from 134.158.195.141 on Wed Nov 5 12:50:37 2025 | | | |
|
| | Matin :
Soucis synchro :
- Nicolas les a redémarré |
  |
|
1162
|
Thu Dec 4 08:59:07 2025 |
Entered by Super Team from 134.158.195.141 on Thu Dec 4 08:58:52 2025 | | Shift summary | LI | TL | Ring |
|
Preparation/check of the 70 MeV WP for X-ray run | | Goal: preparation and checking the machine
operation at 70 MeV and 40 MeV (ideally with
X-rays) |
  |
|
1164
|
Fri Dec 5 14:48:46 2025 |
Marie Julien Hayg Sophie | | Shift summary | LI | TL | LE | Ring |
|
Matching ring-TL - Recherche des bons twiss pour la TL | | Programme
shift : etudes matching anneau-TL - Recherche
param twiss TL |
|
|
Draft
|
Thu Dec 18 09:39:38 2025 |
DN, IC, HG, KD, MJ, and Co | | Shift summary | LI | TL | LE | Ring | Diag | Aimants | Laser | Vide | Linac Commissionning | Ring Commissioning |
|
X-ray measurement/characterization campaign | | The machine was warmed up remotemy
The FPC is ready. The laser is locked.
9h Start HV |
|
|
1174
|
Mon Jan 5 10:35:58 2026 |
MJ | | Shift summary | LI | TL | LE | Ring |
|
shift twiss Q1 versus soleno | | Modulateur en chauffe
Alarme rendant impossible clim casemate
. Maher envoie un mail a urgencevc |
|