  543   Fri Sep 9 18:26:51 2022 Entered by Moutardier Alexandre from 134.158.195.145 on Fri Sep 9 18:26:38 2022 InfoDiag First injection in the ring  Injection dans l'anneau.

Signaux sur les 5 premier BPM de
l'anneau without kicker.
 injection_ring.pngtbt_sum_injection.png 
  121   Tue Oct 26 15:19:17 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Oct 26 15:18:59 2021 InfoRF D1 Image PIC PBC photodiode a l'oscilloscope en salle de controle Attenuateur RF canon : 0.25 dB

Orange : Photodiode
Vert : PBC
 image_PIC_PBC_photodiode.png 
  194   Tue Nov 30 17:11:41 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Tue Nov 30 17:11:17 2021FixedProblemCC Problème pc client2 Le client 2 a freeze.
Il était impossible de fermer
les intefaces ouverte, d'ouvrir un nouveau
  
  157   Mon Nov 8 18:01:06 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Mon Nov 8 18:00:52 2021 InfoDiag | Linac Commissionning Scan charge phase Scan charge ICT linac phase canon fait
le 08 Nov 2021
 scan_charge_phase_08-11-2021.png 
  142   Fri Oct 29 10:51:38 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Fri Oct 29 10:51:23 2021Not FixedProblemLinac Commissionning Problème Modulateur Un interlock modulateur tombe a chaque
fois avant que la chauffe ne soit fini.

Maher doit recontater le fabricant
  
  172   Fri Nov 19 09:24:41 2021 Entered by Moutardier Alexandre from 134.158.195.144 on Fri Nov 19 09:24:11 2021 UrgentInfra Trou dangereux !!! Ce matin en verifiant les orientations
des jauges dans l'anneau pour faire des
simulations correcte j'ai du entrer dans
 trou_escalier_anneau.jpg 
  218   Tue Dec 14 13:52:35 2021 Entered by Moutardier Alexandre from 134.158.195.142 on Tue Dec 14 13:52:18 2021Under ProcessShift summaryLinac Commissionning Shift après-midi Opérateur : Hayg, Vincent, Nicolas,
Alexandre M. 

But de la journée :
 health_check_14-12-21.pngscan_charge_phase-14-12-21.png 
  541   Thu Sep 8 20:47:20 2022 Entered by Moutardier Alexandre from 134.158.195.142 on Thu Sep 8 20:47:07 2022Under ProcessInfoDiag | Aimants Bilan des test avec feuille phosphorescente Instalation feuille phosphorescente au
niveau de la fourchette "by-pass/ring"
pour essayer de voir le faisceau
  
  330   Mon Feb 14 10:12:10 2022 Entered by Moutardier Alexandre from 134.158.195.142 on Mon Feb 14 10:11:53 2022Under ProcessFixSY Recette synchro Nouvelle recette synchro par défault
enregistré : 20220201_reference.xml

A tester en faisceau dans la journée.
  
  526   Mon Aug 8 17:05:30 2022 Entered by Moutardier AlexandreUnder ProcessInfoDiag | Linac Commissionning RE: camera TL/SST2 + fente Voici une mise a jours concernant les fentes
:
- L'IHM fente
  
  1022   Wed Feb 26 22:52:03 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Feb 26 22:50:49 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 26 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science  Suite du commissioning
det Photonic Science

**
  
  Draft   Wed Apr 2 08:25:07 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Apr 2 08:24:51 2025Under ProcessShift summaryLinac Commissionning | Ring Commissioning Programme mercredi 2/04 9h: mise en chauffe machine depuis bureau
(Modulateur, laser, frigo/chiller, cyclage
aimants)
 spectres_synchro_desynchro.png 
  1020   Tue Feb 25 22:59:57 2025 Entered by Marie Jacquet from 88.165.97.136 on Tue Feb 25 22:59:29 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 24 -25 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science Commissioning det Photonic Science

** Depose
Dectris, mise en place Photonic, alignement
  
  579   Fri Oct 7 00:30:24 2022 Entered by Marie Jacquet from 88.165.97.136 on Fri Oct 7 00:30:03 2022 Shift summaryLinac Commissionning shifts LINAC 4/10 et 6/10 4/10 : Prise de donnees "Alignement
LINAC" (Hayg Marie)

Iris
  
  569   Wed Sep 28 19:14:11 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 28 19:13:52 2022 Shift summaryLinac Commissionning Shift du 12-13/09 en image  En pj, les donnees "Alignement LINAC"
du 12-13/09, en image (donnees brutes notees
dans le elog le 16/09).
 2022-09-28-elog.pdf 
  560   Wed Sep 21 20:07:01 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLinac Commissionning BPM LINAC + TL : dispersion tir a tir ? Aujourd'hui Iriya m'a montre en
salle de controle une "etendue"
de ~4mm de l'orbite du faisceau mesuree
  
  561   Thu Sep 22 00:00:43 2022 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 21 20:06:44 2022 Shift summaryLI | Diag | Linac Commissionning RE: BPM LINAC + TL : dispersion tir a tir ? CALC/DG/MeanStd1 permet déjà
d'avoir la déviation standard
de la position mesurée sur 100 tirs
  
  911   Wed Sep 11 12:30:52 2024 Entered by Marie Jacquet from 134.158.89.45 on Wed Sep 11 12:30:36 2024 Shift summaryLinac Commissionning tableau alignement section - v2    2024-09-11_alignement_section-v2_1.xlsx 
  746   Wed May 3 20:10:40 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning Stabilite LINAC Pour illustrer la fin de l'entree
elog 745 d'aujourd'hui  :

 2023-05-03-traitement_Data20230424et26.pdf 
  749   Thu May 4 16:14:06 2023 Entered by Marie Jacquet from 134.158.89.45 on Wed May 3 20:10:26 2023 Shift summaryLinac Commissionning RE: Stabilite LINAC  




  