ID Date Authordown Status Type Category Important Subject Icon Text Attachments
  825   Tue Dec 12 12:48:58 2023 Entered by Nicolas Delerue from 134.158.195.144 on Tue Dec 12 12:48:44 2023 InfoSY Changement de frequence linac Suite discussion avec Jean-Boel et Vincent,
la frequence linac a ete remise a 2998550000Hz
(nominal).
 Screenshot_from_2023-12-12_12-57-04.png 
  415   Thu Mar 24 10:34:15 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 10:34:03 2022FixedFixInfra | Linac Commissionning config clefs PSS Operateurs: VC, SC, ND

Pour memoire, cf photo...
 IMG_20220324_102230_1_copy_1248x1664.jpg 
  414   Thu Mar 24 09:44:28 2022 Entered by Nicolas Delerue from 134.158.195.144 on Thu Mar 24 09:43:47 2022FixedShift summaryDiag | CC | RF D1 Mesures 24/3/2022 Operateurs: ND, VC, SC

===

 
 Screenshot_from_2022-03-24_16-51-36.png 
  991   Thu Jan 9 10:31:11 2025 Entered by Nicolas Delerue from 134.158.195.144 on Thu Jan 9 10:30:34 2025Not FixedProblemCC DS ThomX_PhotoCathode using a lot of CPU The load on client5 is 29 making all operations
slow.

Appently the DS ThomX_PhotoCathode
 Screenshot_2025-01-09_10-30-03.pngScreenshot_from_2025-01-09_10-32-26.png 
  963   Fri Nov 15 12:13:42 2024 Entered by Nicolas Delerue from 134.158.195.144 on Fri Nov 15 12:13:26 2024Not FixedInfoTL Charge excess in the TL By looking at the BPM transmission tool
one can see that there is more charge on
TL/BP.03 than on TL/BPM.02 (see attached
 Screenshot_from_2024-11-15_12-12-55.pngScreenshot_from_2024-11-15_12-12-46.png 
  821   Tue Nov 21 14:29:01 2023 Entered by Nicolas Delerue from 134.158.195.142 on Tue Nov 21 14:28:47 2023 Shift summaryDiag Prise de donnees 21/11 13:57 Mise en chauffe

15:00 Faisecau

Tests sur les ecrans
  
  680   Thu Feb 16 10:52:11 2023 Entered by Nicolas Delerue from 134.158.195.142 on Thu Feb 16 10:51:56 2023FixedInfoLinac Commissionning Health check  Les erreurs severes dans health check
ont ete resolues.

La plupart etaient solvable en
 health_check_2023_02_16_10_51.png 
  696   Fri Feb 24 16:24:15 2023 Entered by Nicolas Delerue from 134.158.195.142 on Fri Feb 24 16:24:00 2023FixedShift summaryDiag Shift 24/2 13:30 Mise en chauffe

14:30 Demarrage faisecau

Test de modifications de diverses
  
  987   Fri Dec 20 14:00:06 2024 Entered by Nicolas Delerue from 134.158.195.142 on Fri Dec 20 13:59:52 2024Not FixedProblemInfra Alarme sur les rondes A 13h30 j'ai tent'e de faire un
acces controle dans la casemate.

Quand j'ai pris la 1ere clef
  
  243   Tue Jan 11 19:30:19 2022 Entered by Nicolas Delerue from 134.158.195.141 on Tue Jan 11 19:30:03 2022FixedFixSY Pb declenchement scope synchro La frequence des diags etait reglee a 0.1Hz
et le scope de la salle de controle se declenchait
sur les diags. C'est pour cela que le
  
  417   Thu Mar 24 17:12:01 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 17:11:44 2022Reference SolutionLinacLinac Commissionning Paramètres Faisceau Alignement laser

On retrouve la phase pour la charge
max phi = 313 degres (consigne chiller canon
  
  416   Thu Mar 24 15:41:18 2022 Entered by ND/VC/HG/SC from 134.158.195.142 on Thu Mar 24 15:41:04 2022FixedLinacLinac Commissionning Alignement laser Position moteur M4 avant alignement laser
:

x = 380 et y = 5373
 2022-03-24_15_40_29_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_10.png2022-03-24_16_14_17_li_op_las_02_log_scale_False_despeckle_False_min_scale_0_max_scale_10_8.png 
  484   Tue Jun 21 09:58:30 2022 Entered by ND/SC from 134.158.195.141 on Tue Jun 21 09:58:15 2022Under ProcessLinacAimants Demarrage et faisceau 9h45 Mise en chauffe modulateur. Test interface
générale Nicolas pour l'allumage
du modulateur.
 12x 
  487   Fri Jun 24 11:11:58 2022 Entered by ND/SC from 134.158.195.141 on Tue Jun 21 09:58:15 2022Under ProcessLinacAimants RE: Demarrage et faisceau La même chose avec le signal des
BPM en plus.

 Charge_max_SpX_Spy.pngCharge_max_x_y.png 
  472   Tue Jun 7 09:53:01 2022 Entered by ND/JNC/VC/VS/MO/SC from 134.158.195.141 on Tue Jun 7 09:52:47 2022Under ProcessLinacLinac Commissionning Etat des lieux Presents: SC, ND, JNC, VS, MO

Fermeture casemate

Tests des DSs en cours
  
  5   Tue Dec 1 09:57:09 2020 Entered by Moutardier from 134.158.76.123 on Tue Dec 1 09:56:35 2020 Inforesumes Verrification pour le démarrage a blanc Verification de l'état de la
Synchro : OK, tout les signaux sont en trigger
externe.
  
  223   Thu Dec 16 14:58:50 2021 Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 14:58:26 2021 ProblemAimants | Linac Commissionning Alimentation en état FAULT !!! D'après health_check toutes
les alimentations electrique des solenoides,
deviateur et quadrupole sont en état
  
  221   Thu Dec 16 10:40:03 2021 Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 InfoCC test en ssh Connection ssh sur client4 pour tester
une modification de health_check
  
  222   Thu Dec 16 14:57:31 2021 Entered by Moutardier Alexandre from 91.168.92.148 on Thu Dec 16 10:39:49 2021 InfoCC RE: test en ssh Modifications faites, testées et
fonctionnelles.

  
  237   Mon Jan 10 09:27:14 2022 Entered by Moutardier Alexandre from 193.55.29.170 on Mon Jan 10 09:26:50 2022 FixDiag | CC | Linac Commissionning Automatique "health check" Allumage de client 5. Pourquoi était-il
éteint sachant qu'il y a des ds
qui doivent tourner dessus ?
  
ELOG V3.1.4-395e101