HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 51 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icondown Text Attachments
  Draft   Thu Jan 23 17:03:45 2025 Ring team AnneauRing Commissioning Ring Working Points 50 MeV/ 61.5 MeV / 70 MeV 50 MeV

Configuration:
 8x 
  1005   Fri Jan 24 08:45:26 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all
magnets
  
  1006   Fri Jan 24 17:39:00 2025 MV, IC, VK, RCUnder ProcessShift summaryRing Commissioning   08h45 Start Thomx: Modulator, frigo, laser

08h50 Start chillers, cycling all
magnets
 Screenshot_from_2025-01-24_17-35-38_61p5MeV.pngScreenshot_from_2025-01-24_17-34-48_61p5MeV.pngScreenshot_from_2025-01-24_17-34-23_61p5MeV.png 
  1007   Mon Feb 10 09:42:13 2025 ND, VC, HG, MJUnder ProcessShift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Test demarrage 10/02 9:37 Mise en chauffe

Maher signal que des tests ont
ete fait sur le canon, leger risque de claquage.
 7x 
  1008   Tue Feb 11 10:31:57 2025 ND, Marie LabatUnder ProcessShift summaryDiag Streak camera 9:20 Start aligning

12:40 Alignement done for both
linac and ring.
 20250211_173802.jpg20250211_174708.jpg 
  1009   Wed Feb 12 08:00:31 2025 KD MJUnder ProcessShift summaryLI | TL | Linac Commissionning shift du 12 février 2025 - Alignements 8h: mise en chauffe à distance (modulateur,
frigo, chiller, laser)

9h30: laser semble pas aligné
 2025-02-12-Shift.pngaxes_BPM_calib.jpgaxes_BPM_nocalib.jpg 
  1010   Thu Feb 13 10:56:28 2025 ND, SC, Marie Labat, IC, VMUnder ProcessShift summaryRing Commissioning Opérations caméra à balayage / MRSV 8h50 Mise en chauffe modulateur

Changement de la carte mère
pour la badgeuse de la ligne X
 20x 
  Draft   Fri Feb 14 08:21:26 2025 Entered by Super Team from 134.158.195.141 on Fri Feb 14 08:21:09 2025Under ProcessShift summaryRing Commissioning   08h20 Start ThomX: modulator, laser, fridge,cycling
all magnets

08h25 chillers are started
  
  Draft   Mon Feb 17 11:00:01 2025 VM, IC, VKUnder ProcessShift summary  70 MeV WP 10h30 Start beam

Since Friday evening the problem
to store the beam at 70 MeV. There is 1 turn
  
  1013   Tue Feb 18 08:28:36 2025 VC, KD, VM, ND, RC, MJUnder ProcessShift summaryLI | Linac Commissionning shift  demarrage machine 8h30

intervention Kicker.. 8h45 

10H30 fin intervention Kicker Ok
 Screenshot_from_2025-02-18_17-52-13.pngScreenshot_from_2025-02-18_17-51-17.pngScreenshot_from_2025-02-18_17-49-55.pngScreenshot_from_2025-02-18_17-58-05.pngScreenshot_from_2025-02-18_17-59-46.png 
  1014   Wed Feb 19 08:28:11 2025 Entered by Super Team from 134.158.195.141 on Wed Feb 19 08:27:57 2025Under ProcessShift summaryRing Commissioning   08h26 Start ThomX: Modulator, Fridge, Laser

08h32 Chillers were started, cycling
all magnets
  
  1015   Wed Feb 19 17:32:30 2025 shift screw Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Rustine pour le probleme CEM kicker - ring storage - Xrays Cable ventilo kicker debranche ==> aucun
effet
Cable balise blinde ==>
 storage_et_Xrays_2025-02-19_19-01-58.pngdet2diodes_pb_voie4_2025-02-19_19-16-07.png 
  1016   Thu Feb 20 08:25:11 2025 Entered by Super Team from 134.158.195.141 on Thu Feb 20 08:24:55 2025Under ProcessShift summaryRing Commissioning   08h25 Start ThomX; Start ThomX: Modulator,
Fridge, Laser

08h32 Chillers were started, cycling
 6x 
  1017   Fri Feb 21 08:30:30 2025 shift crewUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 21 février 2025 8h30 : démarrage machine en remote
(modulateur, laser, chiller/frigo, cyclage)

Nouveau
 6x 
  Draft   Mon Feb 24 08:00:09 2025 KD VC VMUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 24 février 2025 8h: mise en chauffe de la machine (Frigo/chiller,
laser, modulateur et cyclage aimants).

9H demarrage faisceau
  
  1019   Tue Feb 25 08:09:54 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 25 février 2025 8h10: mise en chauffe machine en remote
(Frigo/chiller, modulateur, laser, cyclage
aimants)
 Charge_Drop.png 
  1020   Tue Feb 25 22:59:57 2025 Entered by Marie Jacquet from 88.165.97.136 on Tue Feb 25 22:59:29 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 24 -25 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science Commissioning det Photonic Science

** Depose
Dectris, mise en place Photonic, alignement
  
  Draft   Wed Feb 26 07:30:15 2025 KDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 26 février 2025 7h30: mise en chauffe en remote (Modulateur,
frigo/chiller, laser, cyclage aimants)

8h35 HV is 'On'
  
  1022   Wed Feb 26 22:52:03 2025 Entered by Marie Jacquet from 88.165.97.136 on Wed Feb 26 22:50:49 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 26 fevrier (visite Alberto Paola Luca) - Detecteur Photonic Science  Suite du commissioning
det Photonic Science

**
  
  1023   Thu Feb 27 07:37:25 2025 KD, VM, SK, NDUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 27 février 2025 7h45: mise en chauffe en remote (Frigo/chiller,
laser, cyclage aimants)

Le Modulateur ne répond
 12x 
ELOG V3.1.4-395e101