HOME Prise de donnees MML Controle commande Simulations Notes Hardware Ligne X Laser Interaction Diagnostiques Synchronisation
Commissionning Commissionning Preparation Pannes ShiftCheck
  Toutes les notes concernant les Commissionning de ThomX, Page 52 of 63  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icondown Text Attachments
  1024   Fri Feb 28 00:32:21 2025 Entered by Marie Jacquet from 134.158.205.38 on Thu Feb 27 23:45:19 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning 27 fevrier (visite Alberto Paola Luca)  ** Nouvelle
prise d'images pour determiner les distortions
du det :
  
  1025   Tue Mar 4 09:03:11 2025 KDUnder ProcessShift summaryLI | Laser | Opt | Linac Commissionning shift du 4 février 2025 7h40: mise en chauffe en remote laser PC

9h : mise en chauffe modulateur,
chiller/frigo
  
  1026   Tue Mar 4 11:49:34 2025 KDReference SolutionInfoLaser | Opt realignement laser PhotoCathode Sortie laser 260 - 265uJ

Injection ligne de transport 240uJ

point initial : 
 2025-03-04_09_45_28_li_op_las_02_RAW.png2025-03-04_10_54_45_li_op_las_02_RAW.png 
  1027   Tue Mar 4 18:42:57 2025 Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025Under ProcessLinacLI | TL Conditionnement Canon 1- Conditionnement du Canon à 16
dB, on gagne un peu en vide. 

2- sautes du faisceau : vérification
 Jumps_YagLI.pngJumps_YagLI_NoSteerer.png 
  1028   Wed Mar 5 08:53:34 2025 VM, VC, RC, DNUnder ProcessShift summaryRing Commissioning   08h53 Start ThomX

11h10 The oscilloscope installed
in the bunker
 16x 
  1030   Thu Mar 6 10:38:31 2025 Entered by Marie Jacquet from 134.158.205.25 on Thu Mar 6 10:37:50 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Programme de la journee : preparation des valeurs a remplir  1 : Alignement Axe
Q1-Q3 avec SCRIPT - Conditions
 Compare_Align_ALL.pngTrend_Position_Yag_Sautes.pngJauges_2025-03-06_18-47-14.png2025-03-06-Q1Q3_Q4Q5.pdf 
  1031   Fri Mar 7 11:03:20 2025 Entered by Super Team from 134.158.195.141 on Fri Mar 7 11:03:05 2025Under ProcessShift summaryLI | Diag Test streak camera 7/03 9:10 Debut alignement

10:30 Mise en chauffe machine

10:45 Fin alignement
  
  1032   Tue Mar 11 14:31:06 2025 VMUnder ProcessShift summaryLinac Commissionning   14h31 Start ThomX/ Modulator, Frig, Laser

14h37 Cycling all magnets, Chillers
started
 9x 
  1033   Wed Mar 12 07:52:55 2025 KD, VM, MJ, DN, RC, ICUnder ProcessShift summaryOpt | Linac Commissionning | Ring Commissioning shift du 12 mars 2025 7h50 : mise en chauffe machine (modulateur,
frigo/chillers, laser, cyclage aimants)

 
  
  1034   Wed Mar 12 16:50:29 2025 Entered by Super Team from 134.158.195.143 on Wed Mar 12 16:50:08 2025 Shift summaryLI | TL | LE | Ring | Diag | Aimants | CC | Infra | Laser | Opt | RF D1 | RF Anneau | MECA | SY | Vide | Electronique | Linac Commissionning | Ring Commissioning Spectres X (positions fentes 2 et temps d'extraction) IP-Fente2 : 8835 mm
IP-capteur_CdTe: 10460

Calib ouverture Fentes2 : +0.1
  
  Draft   Thu Mar 13 08:29:34 2025 VM, VC, RC, ICUnder ProcessShift summaryRing Commissioning   08h27 Start ThomX: Modulator, Laser, Frig

08h34 Chillers were started, cycling
al magnets
 12x 
  1036   Thu Mar 13 11:25:29 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:25:13 2025FixedLinacLaser Etat laser Bonjour, le parcours optique a ete realigne.

L'enegie UV sur la cathode
= 48uJ , Iris = 1.3mm, Att = 410
  
  1037   Thu Mar 13 11:57:19 2025 Entered by Viktor Soskov from 134.158.195.153 on Thu Mar 13 11:57:03 2025FixedInfoLaser Etat laser Voici les distibutions UV laser sur lacathode
avant et apres l'alignement
 Avant.pngApres.png 
  1038   Fri Mar 14 08:31:19 2025 VM Entered by Super Team from 134.158.195.142 on Fri Mar 14 08:31:03 2025Under ProcessShift summaryLI | Diag Streak camera measurements 08h28 Start Thomx: Modulator, Laser, Frig

08h33 Chillers were started, cycling
al magnets
 Measurements_summary.pngphase_217.pngphase_224.pngphase_208.pngCR_V1_Blank100ms_linacOptimisedPhase_213_014.png 
  Draft   Tue Mar 18 07:56:38 2025 KD, IC, RC, DN, VMUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 18 mars 2025 - Mesure tailles transverses H et V de la source 7h55: mise en chauffe en remote (modulateur,
laser, frigo/chiller, cyclage)

*** programme ***
 Screenshot_from_2025-03-18_18-04-13.pngScreenshot_from_2025-03-18_16-50-47.pngclosed_orbit_18032025.pngclosed_orbit_woCOR_18032025.png2025-03-18_17_38_46_OBL_DG_MRSV_01-CCD_01_RAW.png 
  1040   Wed Mar 19 07:52:46 2025 KD, IC, RC, HG, DNUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 19 mars 2025 7h50: mise en chauffe de la machine en
remote (modulateur, frigo/chiller, laser,
cyclage aimants)
  
  1041   Thu Mar 20 07:39:28 2025 KDUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 20 mars 2025 7h40: mise en chauffe de la machine (modulateur,
laser, frigo/chiller, cyclage aimants)

 
 ElectronBeamLifeTime.pngElAndPhotBeamsLifTime20250320.png 
  1042   Thu Mar 20 18:41:55 2025 Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 Shift summaryLI | Ring | Linac Commissionning | Ring Commissioning 19 et 20 mars - Mesures X-rays - Bravin & co 19
mars 2025

 spectre_42keV.png 
  1043   Fri Mar 21 07:43:44 2025 KD, VM, IC, RC, VC, SC, MJUnder ProcessShift summaryLaser | Opt | Linac Commissionning | Ring Commissioning shift du 21 mars 2025 7h40: mise en chauffe de la machine en
remote (modulateur, frigo/chiller, laser,
cyclage aimants)
 PhotnBeamLifTime20250321.pngElectronBeamLifTime20250321.pngScan_XRay_table_at_21-03-2025_09-42-01.png 
  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help
  
ELOG V3.1.4-395e101