  Toutes les notes concernant les Commissionning de ThomX, Page 62 of 62  Not logged in ThomX    logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Status Type Category Important Subject Icondown Text Attachments
  Draft   Tue Apr 21 07:36:54 2026 KD, VMUnder ProcessShift summaryLinac Commissionning | Ring Commissioning shift du 21 avril 2026 7h30 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage) ==> dipôles
non cyclé (en défaut) ==>
  
  Draft   Wed Apr 22 10:26:28 2026 IC,VM      Dalkia solved the problem with vooling
circuit in the morning

10h15 mise en chauffe  (frigo/chillers,
  
  Draft   Thu Apr 23 09:06:22 2026 IC, VM      9h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 8h00 : mise en chauffe en remote (frigo/chillers,
laser, modulateur, cyclage)
  
  1239   Mon May 11 09:33:17 2026 VincentUnder ProcessLinacLI | TL Manip Gplast 9h30 test radioprotection OK (mesure en
dessous du bruit de fond)

13h30 fenetre installée
  
  1240   Tue May 12 08:42:45 2026 Entered by Super Team from 127.0.0.1 on Tue May 12 08:42:31 2026Under ProcessOtherLI manip Gplast Demarrage machine 8h40

pB reflechi canon... temp consigne
27.7C
 Screenshot_from_2026-05-12_10-33-26.png 
  1241   Wed May 13 08:35:16 2026 Entered by Super Team from 127.0.0.1 on Wed May 13 08:35:01 2026Under ProcessOtherLI manip Gplast demarrage machine 8h30

faisceau ok vers 10H

14h mesure 50 MeV
  
  Draft   Wed Jun 3 08:41:41 2026 IC, HG, JNC Shift summary  Restart of the accelerator 02/06/2026

~15h30 Starting all system

16h Start up of the modulator,
  
  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow.
Tuning off the gun operation key does not
 GunCharge_vs_LaserAtt.pngGunDarkCurrent_vs_Att.png 
  Draft   Tue Jun 9 10:13:24 2026 Entered by Super Team from 127.0.0.1 on Tue Jun 9 10:13:08 2026      10h02 Start-up modulator, laser, fridge,
chillers

The SF6 pressure is low. Magnet
  
  1245   Fri Jun 12 13:08:13 2026 Kevin D.Reference SolutionInfoLaser | Opt | Linac Commissionning Laser PC status mise à jours du post : https://elog.lal.in2p3.fr/THOMX/Commissionning/1188

** Laser PC ***

- Sortie Laser: 120 uJ 
  