  1087   Wed Jun 11 08:46:58 2025 Entered by Marie Jacquet from 134.158.205.17 on Wed Jun 11 08:46:44 2025 Shift summaryLI | Ring 2025-06-04 Fluo-spectro : Spectre du 2025-06-04 
  1066   Mon May 12 07:58:58 2025 Entered by Kevin Dupraz from 109.222.35.58 on Mon May 12 07:58:41 2025Under ProcessShift summaryLI | RF D1 | Vide | Linac Commissionning shift du 12 mai 2025 : conditionnement GUN 

8h: mise en chauffe modulateur et frigo/chiller

- problème de lecture de vide (visible sur toute les jauges LINAC)

--> Réparé : un switch (de fin de ligne etait on et mis OFF)

  880   Thu Jun 27 16:14:38 2024 Entered by Super Team from 134.158.195.141 on Thu Jun 27 16:14:24 2024 LinacLI | RF D1 Tests reseau RF 

Charge en sortie diviseur cote section

HT = 1220V (35MW), 10Hz , 3us

Attenuateur cote canon 30 dB

Enregistrement RF_integral_trends_Oscillo.py , début autour de 16h

Pas de claquages

 

  881   Fri Jun 28 14:37:19 2024 Entered by Super Team from 134.158.195.141 on Fri Jun 28 14:37:07 2024 LinacLI | RF D1 Tests reseau RF : branche attenuateur 

charge en position après atténuateur, 10Hz, 3us, 1220V

Ca claque à 15dB et 10dB, mais pas à 0.2dB

on essaye de monter la puissance de 0.2dB à 15dB pour voir ou ça claque.

14h33 : <1dB ça ne claque pas

14h38 : 1dB

14h41 : 1.250dB

14h47 1.9 dB

14h48 2.2 dB

14h50 3dB

14h51 6dB claquage à 6dB

14h59 6dB

15h01 0.2dB

15h01 6dB

15h03 8dB

15h08 8.5dB

15h08 passage à 1200V 0.2dB

15h10 5dB

15h11 0.2dB

15h11 passage à 1220V

15h13 8dB

15h17 8.2dB

15h25 toujours 8.2dB

15h26 8.4dB

15h26 8.6dB

15h28 passage à 1200V (8.6 dB)

15h45 0.4dB signaux instables (pompage)

15h54 Arret

Nombreux claquages à 8.6 dB à 1220V et 1220V

Il semble que la partie mobile de l'atténuateur a un problème

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  893   Tue Jul 30 10:17:06 2024 M.O, M ELK, Hayg, SlavaUnder ProcessShift summaryLI | RF D1 Conditionnement section SC/ME/MO/VK/HG  

signaux RF mesurés :

avec Oscillo :

orange : reflechi section Prs

violet: incident section Pis

vert: refléchi Klystron Prk

jaune : incident Klystron Pik

avec la carte Redpitaya:

vert : puissance transmise dans la charge fin de section  Pchargesection

rouge : puissance reflechi section  Prs

blue: puissance incidente section Pis

NB: Pression SF6 2.4 bar à reajuster

Le passage de 10Hz à 25 Hz => Puissance moyenne (25Hz) = puissance moyenne (10Hz)  X 2.5

*** Passage à 25Hz & 1µs

Au Demmarage Mettre att. sec 10 dB et faire augmenter la HT en douceur  de 1000 V jusqu'à (Alim 1215 V & 289 kV ==> Pik=33 MW)

Puis Faire baisser att. sec en douceur : ci-dessous quelques points de mesures

11h16 : att. sec 3 dB (Pis=12 MW) 1µs & 25 Hz ==> vide in sec 4 10-9 mbar out section 1.5 10-9 mbar

11h20 : att. sec 2.5 dB (Pis=14 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h25 : att. sec 2 dB (Pis=15 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h30 : att. sec 1.5 dB (Pis=17 MW) 1µs & 25 Hz ==> vide in sec 3.7 10-9 mbar out section 1.4 10-9 mbar

11h35 : att. sec 1 dB (Pis=19 MW) 1µs & 25 Hz ==> vide in sec 6.9 10-9 mbar--> ? ca ne baisse pas   out section 2.7 10-9 mbar --> ? ca ne baisse pas  

12h 04 : att. sec 0.9 dB (Pis=20 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ? ca ne baisse pas   out section 3.8 10-9 mbar --> ?ca ne baisse pas  

NB: la pompe en amont de la section passe de 1.2 10-9 mbar à 3.5 10-9 mbar

12h 12: att. sec 0.8 dB (Pis=20.5 MW) 1µs & 25 Hz ==> vide in sec 7.910-9 mbar--> ?  out section 4.3 10-9 mbar --> ?

12h 20: att. sec 0.7 dB (Pis=21MW) 1µs & 25 Hz ==> vide in sec 7.9 10-9 mbar--> ?  ca ne baisse pas out section 5 10-9 mbar-->? ca ne baisse pas

12h 30: att. sec 0.6 dB (Pis=21.5MW) 1µs & 25 Hz ==> vide in sec 7.7 10-9 mbar--> ?  /out section 5.110-9 mbar --> ?

12h 35 : att. sec 0.5 dB (Pis=22 MW) 1µs & 25 Hz ==> vide in sec 7.3 10-9 mbar--> ?  /out section 6.2 10-9 mbar --> ?

12h45 : att. sec 0.4 dB (Pis=22.5 MW) 1µs & 25 Hz ==> vide in sec 6.9  10-9 mbar--> ?  /out section 5.9 10-9 mbar --> ?

13h00:  att. sec 0.3 dB (Pis=23 MW) 1µs & 25 Hz ==> vide in sec 6.6 10-9 mbar--> ?  /out section 7.4 10-9 mbar --> ?

13h10:  att. sec 0.2 dB (Pis=23.5 MW) 1µs & 25 Hz ==> vide in sec 6 10-9 mbar --> ?  /out section 6.7 10-9 mbar --> ?

13h30:  att. sec 0.1 dB (Pis=24 MW) 1µs & 25 Hz ==> vide in sec 5.4 10-9 mbar-->4.9 10-9 mbar  ?  /out section 6 10-9 mbar --> 5.6 10-9 mbar ?

** 14h00 : passage à 3 µs et 25 Hz

Mettre att. sec 6 dB et passer à 3 µs

14h20:  att. sec 5.5 dB (Pis=5.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h25:  att. sec 5.0 dB (Pis=7.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h35:  att. sec 4.5 dB (Pis=8.8 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h49:  att. sec 4.0 dB (Pis=9.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

14h55:  att. sec 3.5 dB (Pis=11.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8

15h11:  att. sec 3.0 dB (Pis=12.4 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump)

15h37:  att. sec 2.5 dB (Pis=13.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 decrease. Out MP ? )

15h44:  att. sec 2.0 dB (Pis=15.6 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V4, V5 small jump )

15h50:  att. sec 1.5 dB (Pis=17.5 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 < 10⁻8 (V5 jump, V4 nothing )

15h56:  att. sec 1.0 dB (Pis=19.7 MW) 3µs & 25 Hz ==> vide in sec V4 >= V5 > 10⁻8 (V4, V5 strong jump  )
16:30 : interlock section
16h34:  att. sec 1.2 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 (V4, V5 strong jump  )
16h37 : Standby -->  Acces casemate JN/GM pour recuperer watmetre

16h48: att. sec 1.1 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5  (V4, V5 strong jump  )
16h52 : Interlock machine
16h55: att. sec 1.0 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V4 > V5 > 10⁻8 (V4, V5 mieux que 15h56 )

17h : Interlock reseau
17:02 att. sec 0.9 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (V4, V5 stable)
petits tests :

17:04 att. sec 0.8 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (V4 : activités, V5 jump puis stable)

17:06 att. sec 0.7 dB (Pis=18.9 MW) 3µs & 25 Hz ==> vide in sec V5>V4  (idem )

17h10 : End apres un interlock machine 

 

  897   Mon Aug 5 10:50:06 2024 Entered by Super Team from 134.158.195.141 on Mon Aug 5 10:49:42 2024 LinacLI | RF D1 Suite conditionnement section 

10h50 Mise en route à 10dB, HT = 1000V

11h04 HT = 1215V, Att sec 3 dB vide in section = 9.3e-9 vide out section = 1e-9

11h05 HT = 1215V, Att sec 2 dB vide in section = 9.4e-9 vide out section = 1e-9

11h06 HT = 1215V, Att sec 1 dB

Interlock à 1dB

11h06 HT = 1215V, Att sec 1 dB vide in section = 7.2e-9 vide out section = 1.2e-9

11h16 Att sec 0.9dB vide in section = 8.5e-9    vide out section = 2.5e-9

11h21 Att sec 0.8dB vide in section = e-9    vide out section = e-9

11h27 Att sec 0.7dB vide in section = 9.5e-9    vide out section = 6.8e-9

11h32 Att sec 0.6dB vide in section = 9.2e-9    vide out section = 7.9e-9

11h38 Att sec 0.5dB (Pis=22MW) vide in section = e-9    vide out section = e-9

12:39 : Interlock ? (scope Auto -> Norm to catch last signal)

12:51 : Interlock section

13:28 : Att sec 0.5dB (Pis=22MW)

14h03 Interlock à 0.5 dB

14h07 Att sec 0.4 dB vide in section = e-9    vide out section = e-9

14h50 interlock 0.4 dB

17h40 interlock 0.4 dB

18h55 fin

 

  898   Tue Aug 6 09:57:48 2024 Entered by Super Team from 134.158.195.142 on Tue Aug 6 09:57:28 2024 LinacLI | RF D1 Commissioning section accélératrice 

9h58 Démarrage Att sec 10dB 3us 25Hz HT = 1200V

On augmente progressivement la HT

10h03 HT = 1215V att sec 10dB

10h04 On descend progressivement de 10dB à 1dB

10h28 passage à 1 dB vide in section = 6.9e-9  vide out section = 1.5e-9

10h33 passage à 0.9 dB vide in section = 7.5e-9  vide out section = 2.6e-9

10h36 passage à 0.8 dB vide in section = 8e-9  vide out section = 3.8e-9

10h40 passage à 0.7 dB vide in section = 8e-9  vide out section = 4.8e-9

10h44 passage à 0.6 dB vide in section = 7.7e-9  vide out section = 5.2e-9

10h47 passage à 0.5 dB vide in section = 7.4e-9  vide out section = 5.5e-9

10h55 passage à 0.4 dB

13h50 interlock à 0.4dB

13h53 interlock à 0.4dB

13h56 interlock à 0.4dB

Pause

14h42 reprise à 0.4dB

15h42 Interlock machine

18:40 FIN 

 

 

 

 

 

 

  899   Thu Aug 8 10:12:35 2024 Entered by Super Team from 134.158.195.142 on Thu Aug 8 10:12:02 2024 LinacLI | RF D1 conditionnement section 

Remplissage SF6 de 2.3 bar à 2.5 bar par Christopher

10h08 : augmentation progressive de la HT

10h13 : Att sec 10 dB

On descend progressivement jusqu'à 1dB

10h25 Att sec 1 dB

10h26 Att sec 0.9 dB vide in section = 6.9e-9   vide out section = 1.3e-9

10h30 Att sec 0.8 dB vide in section =  7.4e-9 vide out section = 2.5e-9

10h34 Att sec 0.7 dB vide in section = 7.6e-9  vide out section = 3.7e-9

10h38 Att sec 0.6 dB vide in section =  7.5e-9 vide out section = 4.3e-9

10h42 Att sec 0.5 dB vide in section =  7.1e-9 vide out section = 4.5e-9

10h46 Att sec 0.4 dB vide in section =  6.7e-9 vide out section = 4.6e-9

10h55 Att sec 0.3 dB vide in section =  5.6e-9 vide out section = 6.2e-9

13h58 Att sec 0.2 dB  vide in section =  4.9e-9 vide out section = 5.5e-9

14h20 Intervention LE dans la casemate

15h25 FIn d'intervention, reprise conditionnement

18h fin

 

 

  900   Fri Aug 9 10:01:23 2024 Entered by Super Team from 134.158.195.142 on Fri Aug 9 10:01:08 2024 LinacLI | RF D1 conditionnement section 

Vide de démarrage apres l'allumage des chillers : in section 6.4e-10 et out section 8.3e-10

10h passage de 10dB à 1dB progressivement et en douceur

10h54 passage à 0.3 dB

17h fin

 

  1044   Fri Mar 21 08:37:09 2025 VMNot FixedProblemLI | RF D1 Modulador problem 

08h38 There is problem with the Linac modulator

08h55 Fixed with Maher help

  1190   Tue Feb 10 18:34:33 2026 Entered by Super Team from 127.0.0.1 on Tue Feb 10 18:34:13 2026Under ProcessShift summaryLI | RF D1 Demarrage Linac icon1.gif 

Mesures après remontage de la cale : 1215 V sur le modulateur. ça tient mais encore des claquages dans le Canon à 0dB. Il faut faire travailler encore un peu demain. 

la suite demain

 

 
 

  782   Tue Jul 4 08:56:04 2023 SC/CB/ME LinacLI | RF Anneau | Linac Commissionning Faisceau linac et cavite RF 

8h55 Démarrage modulateur et refroidissements

Intervention SPR terminé

Solenoide = 190A, pas de quadrupoles, LI/PS/STR.01-H.01 = -1A, LI/PS/STR.01-H.01 = 0.90A, position laser = hor 4.635mm ver 1.736mm, visualisation sur TLSST2 et les BPMs

Tests exploratoires de stabilité faisceau

Feedback utilisé par l'anneau : quand ecart > 500 um est mesuré pendant 50 coups, variation attténuateur de 10e-2

Dérives sur TL/SST2 ont plusieurs sources : position du laser, puissance incidente RF, et phase globale. Mesures systématiques en cours.

13h51mn16s modulateur est passé de 1089.3 à 1090.4V.

13h59 1090.1V 

14h18 arret feedback M4-M5

14h23 decrochage laser

14h37 mise en route feedback M4-M5

 14h55 reajustement de la phase sur TL/SST2 à phi = 257 pour forme faisceau

 14h56 1090.30V pour energie

14h57 1090.60 V

15h01 phi canon 258°

15h02 1090.2V - 1090V

15h08 1089.8V

15h09 phi canon 259°

15h11 phi canon 260°

15h12 1089.3 V 

Chute brutale apres coup avec délai

15h14 1090.4V

15h22 phi canon = 258°

15h27 1090.3V

15h30 phi canon = 259°

15h31 1089.5V

16h55 modulateur 1091.4V, phase 256

17h06 1090.9V

17h13 phase 257, 1090.2V

17h29 phase 254, 1091.4V

17h40 phase 255, 1091.2V

17h54 phase 257, 1090.4V

18h11 phase 255, 1091V

18h17 phase 256, 1090.2V

18h48 phase 255, 1090.8, chute à 18h40, quelqu'un a fermé quelque chose ?

18h56 phase 256, 

19h05 phase 254, 1091.4, 

19h16 phase 255

19h20 1090.7V

19h25 253 degrés

Arret

 

 

 

 

  Draft   Wed Jun 3 08:54:55 2026 IC, VMUnder ProcessUrgentLI | RF Anneau Restart of the accelerator 

08h45 Start-up modulator, laser, magnets

09h38 Shutter Laser Linac is yellow. Tuning off the gun operation key does not change it to the red. Need help.

09h55 HV is on

09h56 HV is off. The fridge was started then chillers.

10h20 The laser shutter is OK.  HV is on

recipe_recipe_LI_TL_RI_all_20260422_18_34_34.txt loaded

Linac steerers were adjusted.

11h35 Energy = 50 MeV, Laser Phase 9 dg., Sect. Phase 223 dg., Sect. Att. 2.19 dB, I_Gun -48.3388 pC, I_Linac -54.8343 pC, I_TL -53.5573 pC RF_Ampl. 0 kV, RF_Phase -30.5 dg.

Beam is in the ring W/O RF

11h45 RF is on

11h54 Energy = 50 MeV, Laser Phase 9 dg., Sect. Phase 223 dg., Sect. Att. 2.12 dB, I_Gun -49.1448 pC, I_Linac -55.6953 pC, I_TL -54.5153 pC RF_Ampl. 49.3668 kV, RF_Phase 35.5 dg.
It looks like RF cavity tuning does not work. Help is needed.

12h07  Mesure d'energie en sortie canon sur LISST1 en fonction du courant du steerer LI/PS/STR.01-H.01

'Energy=4.83MeV'

Several scans of the laser attenuator 200 to 430 at the Gun attenuator 0, 1, 2, 3 dB but at the same phase.

13h22 Standby

13h32 HV is on

15h17 Thomx was stopped

 

  1069   Wed May 14 08:07:26 2025 KD, HGUnder ProcessShift summaryLI | Opt | Linac Commissionning shift du 14 mai 2025 

8h: mise en chauffe à distance (modulateur, frigo/chiller, laser)

10h30: on a du faisceau atténuateur à 260pas pour 100pC.

Nouveau point cathode : [H,V] = [4.81, 3.62]

11h: stockage dans l'anneau avec la recette 50MeV de 100pC

Problem de lecture des charges (Wavecatcher) quand les kickers sont en marche (trig sur du bruit). Le problème n'existe pas quand le kicker est éteint. 

 

17h: Variation de la charge uniquement (machine non touchée). Charge max ~ 500pC pour iris à 1.3mm 

==> Stockage ok à 500pC (sans rien faire), il faut optimiser et regarder plus en détail car il n'y a pas un facteur 5 sur la charge stockée (juste 3).

18h : la charge (GUN) oscille, cf plot. 

18h30 : soleno scans à differentes charges : 100 pC / 500  et 600 pC (max) 

**** Programme ****

refaire du faisceau et retrouver le point de fonctionnement à 100pC avec la nouvelle cathode

  995   Tue Jan 14 10:42:56 2025 KDNew SolutionInfoLI | Opt alignement laser PhotoCathode 

Mesure de ce matin et changement point cathode [H,V] = [4.29,3.49]:

sortie laser : 275 - 280uJ

sortie ligne de transport : 184uJ

sortie iris 1.3mm: 73uJ

Injection canon (iris 1.3mm): 56uJ@420pas

Injection canon (iris 1.3mm): 45uJ@350pas

  1055   Fri Apr 11 08:52:07 2025 VC SC HGUnder ProcessShift summaryLI | Linac Commissionning | Ring Commissioning shift du 11 avril  

demarrage chauffage 8hh50

faisceau sur Yag 1 depuis 1heure....

le script d'alignement solenoide est introuvable!!!!! 

alignement laser photocathode

position laser:

H 4.282
V 3.326

 

nouvel alignement réalisé avec le script alignsolenoCBV5

valeurs départs

      LI/AE/COL.01-MOT.01 = 0.783 mm
      LI/AE/COL.01-MOT.02 = 3.427 mm
      LI/AE/COL.02-MOT.01 = 10.451 mrad ; 
      LI/AE/COL.02-MOT.02 = -4.359 mrad

optimisation B entre 0 150A 

vérification sur B 50 230A 

LI/AE/COL.01-MOT.01 = 1.103 mm
      LI/AE/COL.01-MOT.02 = 3.28 mm
      LI/AE/COL.02-MOT.01 = 11.846 mrad ; 
      LI/AE/COL.02-MOT.02 = -4.973 mrad

 

 

 

 

  566   Mon Sep 26 16:30:56 2022 Vincent ChaumatUnder ProcessLinacLI | Linac Commissionning Mesure puissance Canon et section 

Mesure de la puissance dans la bouble (cristal + redpitaya)

mesure sur les 20 derniers points de l'impulsion RF

la variation de la mesure (en tension) est inférieure à 2mV peak to peak  ie  1% de la mesure

 

 

Mesure de la puissance incident section (cristal + redpitaya) (atténuateur guide -10dB)

 

mesure sur les 20 derniers points de l'impulsion RF

la variation de la mesure (en tension) est de  4mV peak to peak  ie  12% de la mesure

 

  567   Tue Sep 27 08:40:33 2022 VC SC CBUnder ProcessShift summaryLI | Linac Commissionning Shift du jour 

Summary:

- Mesure du jitter et de la position relative de pulse laser PC avec la RF canon (3GHz)

- Mesure de la puissance section et Boucle Canon à la puissance nominale

 

Demarrage Frigo 8H30 Chiller et Modulateur 8h40

Fin installation oscilloscope et laser dans la casemate (branché directement) 10h48

Visualisation signal boucle sur oscilloscope, enregistré sur le scope

Stabilité estimée triggé sur laser sur table optique casemate à 1.5 ps sdev (correspond à la résolution du scope)

Mesure de stabilité prolongée le temps du repas

Phase de max foc autour de 1 degérs, on bouge donc le phaseshifter dans sps laser : la phase de max foc devient 271 degrés, iris de 1mm

charge phase @15h30

-50 degrés soit 221 degrés, solenoide à 198 A

steerer 1 H -1.62A, V 0.81A

I dipole 154.4 A, phase RF section 108 degrés, bord de l'écran 156.2A (droit), l'autre 

@ 15h51, dérive de phase laser, en cause le chiller qui s'est éteint

I dipole 156.2 A, phase RF section 106 degrés,

Idipole 155.6 A, 104deg, 

 Idipole 154.6A, 102 deg

idipole 153.8A, 100 deg

I dipole 156.2A, 108 deg bis

I dipole 156.6A, 110 deg

Idipole 157.0A, 112 deg

Idipole 156.6A,114deg

Idipole 156.6, 116 deg

Idipole 156.4A, 118 deg

Idipole 154.3, 122 deg

Idipole 155.4, 120 deg

17h47 Arret machine

 

 

 

                                                                        

 

 

 

 

  636   Wed Nov 30 11:44:22 2022 HG/CB/KDUnder ProcessLinacLI | Linac Commissionning Twiss = F(Solé) 

Phase de Q max : 195, on decale de -50 degrés

IRIS :0.7 mm, att  400, charge 100 pC --> laser sauvé, sigma x,y rms 0.21 mm

coil2 betax0 betay0 alphax0 alphay 0

variation du coil 2 de 160A à 200A. On s'attarde sur le cas 200A pour lequel un halo est présent necessitant d'affiner l'analyse de l'image

15h20 modulateur tombé

valeurs sauvées dans le fichier excell

point 208A 1.3/1.5

on passe à 355 d'atténuateur, iris 1.3 (0.3 rms)

on refait la mesure (208Ac) - attention NB cann un peu désapdaté

Prendre ce point de t^te de ligne demain

208A sur le coil2

 

 

 

 

 

 

 

 

 

  642   Wed Dec 7 09:07:27 2022 KDUnder ProcessShift summaryLI | Linac Commissionning shift du 7 decembre 2022 

9h : Mise en chauffe 
ajout d'eau dans la boucle principale (3 bars --> 4bars)

 

 

**** Programme ****

- Optimiser le code d'extraction de la taille du faisceau sur écran SST (Quad Scan)

- Trouver un point de fonctionnement pour l'anneau

- Verifier l'energie au cours de la journée (cf. shift du 6/12/2022)