835
|
Fri Jan 26 09:36:01 2024 |
ND, Anna K, Elene K | | Shift summary | LI | TL | LE |
|
Data taking 26/01 | |
9:30 Warm-up
11:00 Modulator OFF => restart warm-up
Pb temperature section.
12h15: Pb temperature canon.
12h30 Lunch break
13h30 Pb temperature fixed by Kevin.
Restart
Beam jittery.
Phase shifter was at 4530.
Recipe: LI_TL_RI_all_20240125_16_29_34
Beam seen on EL/DG/SST.01 but strongly spread horizontally. Attempts to focus it but with limited success.
Faraday cup study: Noise from the kickers is very strong difficult to see any other signal.
See images attached: 2 kickers: Screenshot_from_2024-01-26_17-06-36.png
ext kicker only: Screenshot_from_2024-01-26_17-09-19.png
inj kicker only: Screenshot_from_2024-01-26_17-07-16.png
No kicker: Screenshot_from_2024-01-26_17-08-36.png
17h40 Stop |
|
1153
|
Wed Nov 19 10:43:41 2025 |
HG + JM + ND (aprem) | Under Process | Info | LI | TL | LE |
|
Shift mesure Twiss + Simu |
|
8:30 : demarrage à distance
12:10 : QP7 Scan 1 (Phase section 210) optimum sur ligne dispersive
12:12 : QP7 Scan 1 (Phase section 213) largeur spot diminue
12:15 : QP7 Scan 1 (Phase section 215) largeur spot Augmente
Distribution du laser donne un faisceau avec plusieurs coeurs (sur QP7 etc ou lors de quad scans).
comparaison taille sur écrans aux prédictions de BMad.
ensuite : nouvelle lattice "Bmad" appliquée sur ThomX --> "Mac" --> recipe_recipe_TL_all_Mac_20251119_18_02_10.txt
Mac : car dispersion Bmad "matchée" à l'anneau en M ....
BMad fichiers mis à jours sur /data/shared
Suite à faire :
- Mesurer la dispersion.
- comprendre pourquoi en Y on n'est pas très bon (QP7)
- revoir les mesures de twiss : les distributions ne sont pas très bonnes pour le quad scan
|
|
737
|
Thu Apr 20 10:36:19 2023 |
Entered by Super Team from 134.158.195.142 on Thu Apr 20 10:36:01 2023 | Reference Solution | Shift summary | LI | TL | Aimants | Linac Commissionning |
|
référence axe mag Canon | |
Voici la référence tete de machine pour l'axe mag canon :
Laser Iris position [H;V] : [4.90/2.42mm]
Solénoides position : Z : 3.3mm, -4.9mrad
X : 0.8mm, 10.201mrad |
|
663
|
Mon Jan 9 19:28:31 2023 |
Entered by Hayg Guler from 134.158.195.141 on Mon Jan 9 19:28:16 2023 | Not Fixed | Linac | LI | TL |
|
Mesures Linac (KD/HG) | |
Quelques mesures pour confirmer la position du laser sur la photocathode,
et mesure de l'energie pour vérifier les valeurs pour le transport.
En effet sur le dipole, on avait besoin de 146 A pour aller sur TL/SST2 ...
Modulateur : HT : 1090 V et atténuations Canon/LIL -> 0/1.2 dB
Energie : 45.8 MeV ... mesure faite avec steerers + Ecran ...
Donc 1.2 dB sur la section ne suffit plus ??
1 dB --> 45.7 MeV ....
Idem en diminuant l'atténuation, pour une meme valeur de
0.25 dB --> 42.3 MeV ....
Pourtant :
PiC Lil : sur la RPY
0.25 dB : -0.142
0.75 dB : -0.136
1.25 dB : -0.127
A creuser demain.
|
|
783
|
Mon Jul 24 16:29:07 2023 |
ND,LS, KD, JNC | | Shift summary | LI | TL |
|
Shift du 24/07/2023 | |
10h: Accès casemate
Ajout de deux cables près de TL/ICT.02, un jouant le role d'antenne et l'autre connecté à une résistance 50 Ohm.
Cable n°36025 avec 50 Ohm sur WAC02 ch7
Cable n°36036 en antenne sur WAC02 ch5
Objectif: étude du bruit EM pour comprendre la fluctuation de charge détectée
11h : Mise en chauffe
13h45 : Démarrage Faisceau
13h50: Cyclage des aimants
14h: Scan charge/phase
14h30: Problème avec la mesure de charge: redémarrage des ds calc à 16h
15h: Transport jusque dans la TL
15h30: Prise de mesure des signaux ICT (avec les deux nouveaux canaux) pour étude de fluctuation de bruit => prise de mesure avec et sans faisceau
16h: Modulateur en HV
16h20: Modulateur en trigger => attenuateur section RF à 1.6dB
16h45: Injection dans l'anneau avec recette LI_TL_RI_test_20230627_16_46_07 sauvée sous le nom Beam stored (no RF, 150 turns)
16h49: Interlock cavité Pi Pr RF
17h05: Interlock modulateur status bit 12
*** Problème allumage modulateur ==> acquitement des défauts sur les MUX en physique (PC Mohamed HS)
*** Problème avec la cavité RF qui n'accroché pas avec le PID fréquence ==> redémarrage chassis PID
*** Réalignement tete de machine et injection "à l oeil" dans l'anneau
*** 21h: arret machine
|
|
972
|
Tue Dec 3 09:14:50 2024 |
SC, HG, VM | Under Process | Linac | LI | TL |
|
Passage à 61.5MeV et 70 MeV | |
9h14 Mise en chauffe
Pas de camera laser qui s'ouvre sur PlateformeIHM
9h19 cyclage aimants LI, TL sur interface
soucis DS camera laser, impossible à redémarrer.
--> du coup impossible de démarrer le feedback du laser
Chargement recette good_20241114_15_27_46, optimized storage for X_rays (5/6)
Mesure energie : 48.34 MeV attenutation 2.7 dB
Energie = 54.21 MeV attenuation 1.7 dB
Energie = 58.77 MeV attenuation 1 dB
Energie = 60.29 MeV attenuation 0.5 dB
Passage à 61.5 MeV dans la TL --> recette enregistrée
Passage à 70 MeV dans la TL --> recette enregistrée, solenoide est à 210 A, dipole = 255.8A
Modification des steerers :
LI/PS/STR.01_H01 = 1.17A
LI/PS/STR.01_v01 = -2.16
LI/PS/STR.02_V01 = 2.32
LI/PS/STR.02_H01 = 1.17A
Images sauvegardées le long du transport
Après alignement quad sans le steerer TL :
LI/PS/STR.01_H01 = 1.18
LI/PS/STR.01_V01 = -220
LI/PS/STR.02_H01 = -2.97
LI/PS/STR.02_V01 = 2.34
Puis mesure transmission charge vs soleno
18h30 Arret
|
|
1027
|
Tue Mar 4 18:42:57 2025 |
Entered by Super Team from 134.158.195.141 on Tue Mar 4 18:42:42 2025 | Under Process | Linac | LI | TL |
|
Conditionnement Canon | |
1- Conditionnement du Canon à 16 dB, on gagne un peu en vide.
2- sautes du faisceau : vérification du signal avant la section.
Signal visible sur les positions, voir les 2 images, avec ou sans steerer.
hypothèse :
- si pas de saute sur le BPM-LI : le soucis est après le BPM, ou bien au niveau du BPM
- sauf si le BPM n'est pas assez sensible, ou bien pas assez de recul pour un signal perturbé en amont.
l'amplitude du signal semble aussi varier avec la taille faisceau. Pas de mesure systématique.
18h45 : On ferme |
|
1060
|
Mon Apr 28 17:13:58 2025 |
Entered by Super Team from 134.158.195.142 on Mon Apr 28 17:13:39 2025 | Under Process | Info | LI | TL |
|
Hayg / Thibault | |
Position moteur actuels (on ne les vois pas dans le log du shift Sophie/Vincent)
Col-01 Mot-01 : 1.213
Col-01 Mot-02: 3.502
Col-02 Mot-01 : 11.823
Col-02 Mot-02 : -5.429f
On remet les anciennes valeurs de ref.
LI/AE/COL.01-MOT.01 = 0.783 mm;
LI/AE/COL.01-MOT.02 = 3.427 mm;
LI/AE/COL.02-MOT.01 = 10.451 mrad ;
LI/AE/COL.02-MOT.02 = -4.359 mrad;
Données pour comparer le transport Linac dans /data/shared/commissioning_scripts/Data
|
|
1061
|
Tue Apr 29 11:03:14 2025 |
Entered by Super Team from 134.158.195.141 on Tue Apr 29 11:02:38 2025 | Under Process | Info | LI | TL |
|
Data taking for ML | |
Demarrage ACQ pour ML
Random : Phi_GUN, Phi_Section, ST1, ST2, Solenoid, QP1, QP2, QP3
Mesures : BPM1, BPM2, Charge, Laser, YagTL, Intensité Ecran
data --> /data/shared/commissioning_scripts/Data/data/data_linac_29_04_2025/
Section best phase : 207
Stop ThomX : 19:10 |
|
1072
|
Mon May 19 17:57:15 2025 |
Entered by Super Team from 134.158.195.141 on Mon May 19 17:56:57 2025 | Under Process | Info | LI | TL |
|
Data : Sole scan, Q scan, random linac Yag_TL1 | |
Today's data :
- coil scan (+ images)
- Q3 scan
- Random scan yag TL2
17:45 - intervention Nicolas WC
18h : fin |
|
1085
|
Tue Jun 10 18:39:54 2025 |
SC, HG | Under Process | Shift summary | LI | TL |
|
Emittance + data taking | |
phi max : 220 deg Qmax = 120 pC
Laser new position : 4.714 / 3.524
zPhiS=215 AttS=2.58 dB
Emittance measured at QP3 and QP7 (different phase for section)
Data saved for ML : /media/operateur.thomx/Ultra\ Touch/ThomX_Data/data_linac_10_06_2025/
Stop : 18h45 |
|
1179
|
Mon Jan 12 13:51:05 2026 |
Hayg | Under Process | Info | LI | TL |
|
Monday Shift : Q-scan + Data (Active Learning) |
|
Mesures du jour :
- Quad scans à QP1 pour voir d'autres points de fonctionnement avec une matcihing anneau correct (Figure de merite <1 ?)
- autres points Solé
- autres points Q > 100pC (jusqu'à 300pC)
- Active learning pour données TL jusqu'à TLSST3 inclus.
Attenuation laser : 320 pour pour avoir 100 pC @ Emax
Alignement Quads + minimisation disp E ok
14h40 : Laser s'est arreté ... le Ds s'est mis en fault --> soucis de liquide de refroidissement
--> intervention de kevin
18h04: plus de trig (Synchro? ) --> trigger ne clignotte plus
18h20 : Stop ThomX
|
|
1239
|
Mon May 11 09:33:17 2026 |
Vincent | Under Process | Linac | LI | TL |
|
Manip Gplast | |
9h30 test radioprotection OK (mesure en dessous du bruit de fond)
13h30 fenetre installée pompage en cours
14h fin de l'intervention
|
|
826
|
Wed Dec 13 11:20:19 2023 |
Entered by Nicolas Delerue from 80.119.21.73 on Wed Dec 13 11:13:19 2023 | | Info | LI | SY |
|
Changement fréquence linac | |
Suite à une demande de Jean-Noël, la fréquence linac a été changé.
Nous sommes maintenant à la fréquence nominale + 500Hz: 2998.550500MHz.
La fréquence anneau est inchangée.
|
|
Draft
|
Fri Mar 3 11:49:50 2023 |
VK VM | Not Fixed | Shift summary | LI | Ring | Linac Commissionning | Ring Commissioning |
|
Shift 03 | |
Start modulator; alims;
We cannot start machine. No e-beam. Timing laser RF? Need help of linac team.
Kevin solved problem with shutter.
Check alignment at QP3.
Check phase of the section, go to 1.35 dB.
Libera4 reboot.
Measure orbit.
Try to change frequency of synthe from 500 to 500.43 resulted in the change beam position in TL BPM2, but it should not do anythyng with TL. Same shift is observed at the screen in the same position.
Vincent tryies to understand how to interpret this behaviour.
|
|
701
|
Fri Mar 3 12:08:59 2023 |
VK VM | Not Fixed | Shift summary | LI | Ring | Linac Commissionning | Ring Commissioning |
|
RE: Shift 03 | |
evreything is ok
The laser shutter was closed ! Becareful the shutter state is inverted.
| VK VM wrote: |
|
Start modulator; alims;
We cannot start machine. No e-beam. Timing laser RF? Need help of linac team.
|
|
|
702
|
Fri Mar 3 12:29:49 2023 |
VK VM | Not Fixed | Shift summary | LI | Ring | Linac Commissionning | Ring Commissioning |
|
RE: RE: Shift 03 | |
Il se passe des choses pendant la nuit qui mette les diags de la machine en radent :
- Tous les BPM saturent ==> necessité de remettre la "puissance" à -10
- Toutes les caméras étaient éteintes ==> necessité d'aller dans "DS restart" pour un forcage du redémarrage DS
==> Pourquoi nous avons cela ?
| VK VM wrote: |
|
evreything is ok
The laser shutter was closed ! Becareful the shutter state is inverted.
| VK VM wrote: |
|
Start modulator; alims;
We cannot start machine. No e-beam. Timing laser RF? Need help of linac team.
|
|
|
|
1042
|
Thu Mar 20 18:41:55 2025 |
Entered by Marie Jacquet from 134.158.205.16 on Thu Mar 20 18:41:39 2025 | | Shift summary | LI | Ring | Linac Commissionning | Ring Commissioning |
|
19 et 20 mars - Mesures X-rays - Bravin & co | |
19 mars 2025
Photonic juste derriere hexa échantillon
- Lag time
- PMMA
- 2D : Resolution detecteur - To-MTF – Hexa échantillon
- 2D : TOR-MAM off-axis (énergie 42 keV - cf spectre) – Hexa échantillon
- Tomo : Micro-CT-bar-pattern – Hexa échantillon
- Tomo : Micro-CT-contraste-scale – Hexa échantillon
20 mars 2025
Contraste de phase : Photonic au fond de la X-Hutch
- 2D : Fil pêche - Hexa mono
- 2D : Fleur - Hexa mono
- Tomo : micro-CT-bar-pattern – Hexa échantillon
- Tomo : Fleur – Hexa échantillon
- Vers 14h30 : 2D : File de pêche – Hexa mono – single shot
- 2D : Araignée – Hexa mono
- Tomo : plusieurs piments dans une boite – Hexa échantillon
- 2D : TOR_MAM – Hexa mono - Images du bas du phantom, tous les 10 mm Tx.
- 2D : Fil de pêche – Hexa mono – Plusieurs single shots
|
|
929
|
Tue Oct 1 08:45:59 2024 |
SC-VC-HG-ND-IC-VM-VK | | Linac | LI | Ring | Linac Commissionning |
|
Beam transport up to the ring | |
8h45 Mise en chauffe refroidissement et modulateur
9h visite
on a du acquiter les vannes avec jive
10h30 demarrage faisceau
srt1 [H,V] 2.26 , -3.30
srt2 [H,V] -4.42 , 4.16
Scan de l'iris en fonction des steerers (cf image)
12h Pause
14h restart
Goal: transport the beam to the ring and start ring injection.
Start all the Ring elements.
Try to establish the beam transport.
Several problems: go to THOMX MPS mode (Noureddine fixed), several problem with modulator (Maher fixed).
Server 5 was restarted. We lost all the initial settings (temperature, phases, attenuator). Fo future, it is better to store these values in the config file to avoid the problem during the restart of the DS on client 5.
During all the day, continuos problem with shutter. We tried several times to reset it (with keys), it did not really help. It is impossible to transport the beam as the charge is low and the beam shape is very strange.
17h50 Finally got the reasonable beam at the ring rntrance
Injection. First turns.
Injection Kicker timing adjusted from -7.23 to -7.4 . Need to scan for optimum.
Few 100s turns in the ring.
18.40End of the Shift.
|
|
1077
|
Fri May 23 18:54:22 2025 |
Entered by Marie Jacquet from 134.158.89.45 on Fri May 23 18:54:08 2025 | | Shift summary | LI | Ring |
|
Spectro Si VORTEX : Calibration | |
Le spectro Si (vortex/falconX) a ete calibre avec une feuille d'etain
Calib checkee avec une feuille d'or