08h35 Warm-up ThomX: Modulator, Laser, Fridge
08h41 Chillers were started, cycling all magnets.

09h40 HV is ON

10h12 The receipt loaded: recipe_recipe_LI_TL_RI_all_20260116_14_22_26.txt. Beam is in the ring W/O RF

RF gun phase 40 dg., Sect. Att. 2.556 dB, Sect. phase 207 dg., Linac steerers: H [0.58 -2.83], V [-2.48 2.94],  charges (BPMs):  -125, -119, -121, -122, -119 PC, the laser att.  359

10h38 RF 100 kV, phase -4 dg., manual phase shifter was adjusted.

10h54 RI_C1 Quads were stoped to chec dispersion at injection

13h00 Triggers stoped, after that was fixed the laser phase jumped to 202 dg. sect. phase 206 dg. 

15h39 Mod. standby

17h20 HV is on

18h01 Stop ThomX