  1189   Fri Feb 6 08:26:41 2026 Entered by Super Team from 127.0.0.1 on Fri Feb 6 08:26:22 2026Under ProcessShift summaryRF D1   

08h25 Warm-up ThomX: Modulator, Laser, Fridge

08h33 Chillers were started, cycling all magnets.

09h31 HV is on. Vacuum: Li/Vac1 4e-9, Li/Vac2 3e-9, Li/Vac3 3e-9, Li/Vac4 1e-9

09h33 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1030 V Interlock

09h39 Sect. Att. 30 dB, RF Gun Att. 20 dB, HV 1050 V Interlock. Something wrong

10h20 HV 1050 V. Maher is here. Interlock by reflected power to the klystron.

10h26 Modulator is on standby.

10h29 HV is on W/O RF. HV 1215 V. All is OK.

10h34 Modulator is on standby.

10h57 HV is on, 1030 V

11h09 HV is  1050 V

11h35 50pps, 1030V

11h42 1040 V interlock

11h45 Modulator is on standby.

16h10 Stop ThomX

 

Attachment 1: Screenshot_from_2026-02-06_10-52-58.png
Screenshot_from_2026-02-06_10-52-58.png
  Draft   Fri Apr 24 08:05:11 2026 Entered by Super Team from 127.0.0.1 on Fri Apr 24 08:05:02 2026    , entered from 127.0.0.1 

8h00 : mise en chauffe en remote (frigo/chillers, laser, modulateur, cyclage)

  24   Tue Jun 8 17:40:20 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:40:07 2021FixedShift summaryresumes Résumé de la journée 

- Pour les atténuateurs : les butées ont été trouvées, ATT02-MOT01 c'est la canon, ATT01-MOT01 c'est la section.

- Des difficultés ont été rencontrés avec le modulateur : Interlock à cause de l'eau, interlock alim HT, reboot modulateur et vérification de l'autorisation de tir MPS faite.

Le modulateur fonctionne maintenant sans problèmes à une tension de 1240V et un vide klystron de 1.2 uA qui devrait diminuer par la suite. Les mesures radioprotection ont été faites

- Pour le MPS, cliquez sur Paramètres en bas de l'écran principal puis vérifier que LINAC est on.

Pour demain :

- Démarrer régulation eau en plus du modulateur

- Vérifier les signaux RFs sur oscillo et Réglage des retards (demarrage_delays)

- Ne pas mettre beaucoup de puissance, vérifier la chaine RF et vérifier les atténuateurs

- Vérifier caméra et ICT

  23   Tue Jun 8 17:30:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:29:26 2021FixedInfoetc   

Capture ecran modulateur

Attachment 1: HT_1100.png
HT_1100.png
  22   Tue Jun 8 17:27:35 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:27:21 2021Under ProcessInfoPrise de donnees HT sur modulateur et radioprotection 

Contrôle radioprotection en cours HT = 1240V tension max, vide klystron : 1.2 uA

 

  21   Tue Jun 8 17:16:10 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:15:58 2021FixedInfoetc   

Modulateur OK, HT = 500 V en trig

  20   Tue Jun 8 17:04:44 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 17:04:28 2021FixedInfoetc Hv sur modulateur 

Sur le MPS, Vérifiez qu'on est bien en PARAMETRES/ Linac pour autorisation HV sur modulateur

  19   Tue Jun 8 15:58:08 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 15:57:55 2021Under ProcessInfoetc   

Modulateur remis en chauffe car interlock

  18   Tue Jun 8 15:06:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 15:05:59 2021FixedInfoetc   

ATT02-MOT01 attenuateur canon en butée à -8 jusque 3329

  17   Tue Jun 8 15:05:04 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:49:35 2021FixedInfoetc attenuateur section tests butée moteur 

ATT01-MOT01 atténuateur section course de -870 step à 2485 pour les butées

  16   Tue Jun 8 14:49:12 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:48:07 2021FixedInfodocs   

LI/HFI/ATT.02-MOT.01 Attenuateur Canon

  15   Tue Jun 8 14:44:01 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:43:48 2021Under ProcessOtheretc attenuateur section tests butée moteur 

Pas complètement au switch à 0.0 pas pour LI/HFI/ATT.02-MOT01

  14   Tue Jun 8 14:42:30 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:42:17 2021Under ProcessQuestionetc   

Attenuateur LI/HFI/ATT.02-MOT01 en butée à 3329

  13   Tue Jun 8 14:39:20 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:39:06 2021Under ProcessOtheretc attenuateur section tests butée moteur 

Tests des moteurs sur atténuateur en cours

Repérage des butées et des positions

  12   Tue Jun 8 14:36:48 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 14:36:35 2021Under ProcessProblemetc Tests RFs 

Interlock eau sur modulateur, arrêt du modulateur.

Remise en route

A nouveau interlock modulateur, purge de l'eau

Remise en chauffe modulateur ok

Attachment 1: mise_en_chauffe
  11   Tue Jun 8 12:39:23 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 12:39:09 2021Under ProcessShift summaryetc summary du matin 

Bonjour,

la synchro est effective

le modulateur est pret

L'oscillo est opérationnel

rdv à 13h30-45 pour la ronde

A+

Christelle

  10   Tue Jun 8 11:49:13 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 11:48:58 2021Under ProcessFixproblemes attenuateur section tests butée moteur 

On monte progressivement le moteur de l'atténuateur de la section pour trouver la butée supérieure  li/hfi/att.01-mot.01

Le déplacement du moteur est lent 

On constate un problème à régler dans le DS CALC de calibration  calc/li_hfi/write_att.01-mot.01 --> Hayg bosse dessus

butée positive à 1500

butée négative à 0

les atk se sont figés et ne répondent plus --> problème fenetre d'erreur non visible --> ticket glpi sur le sujet pour configurer jive pour avoir la fenetre d'erreur sur 'application jive et non ailleurs

Mail envoyé à Mohamed pour savoir à quelles valeurs correspondent les butées.

Les butées sont réglées de la même facon pour le canon

reste à savoir si la position 0 correspond au zero d'atténuation ?

 

  9   Tue Jun 8 10:58:29 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 10:58:16 2021Under ProcessInfoetc Signaux RFs 

Mise en place des signaux Rfs sur l'oscilloscope de la salle CC, Travail sur le timing en cours.

Valeurs Redpitaya pour signaux RFs : Trigger source = 6 (Trigger EXT), Trigger Delay = 8200, Trigger level = 0.1

  8   Tue Jun 8 10:40:54 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 10:40:40 2021FixedInfoetc Fermeture sous-sols et toit casemate 

Les sous-sols et le toit sont maintenant fermés

  7   Tue Jun 8 09:31:28 2021 Entered by Sophie Chance from 134.158.195.144 on Tue Jun 8 09:31:12 2021Under ProcessInfoetc Tests RFs 

Aujourd'hui, démarrage des tests RFs.

Vérification du bon fonctionnement des IHMs, mise en route du MPS et fermeture casemate en fin de matinée

 

 